Back to news

December 18, 2020 | International, Land

GM Defense begins renovating N.C. facility to build ISVs

By

Christen McCurdy

Dec. 17 (UPI) -- GM Defense announced Thursday that it has started renovation of an existing General Motors building to support production of the Infantry Squad Vehicle, an all-terrain troop carrier designed to transport a nine-soldier infantry squad.

The 750,000-square-foot facility is located in Concord, N.C.

Construction at the facility is likely to continue into early spring, with the production line delivering vehicles in April.

"We have tremendous momentum behind our ISV win, featuring a first-of-its-kind tactical wheeled vehicle that gives our Soldiers speed, durability and performance to enhance mission success," said Tim Herrick, interim president of GM Defense. "GM Defense is responsible for the design, engineering and manufacturing of the ISV. This facility will enable us to meet our customer's timeline for delivery while continuing our journey to bring commercial technologies and transformative mobility solutions to the defense market."

The 5,000-pound ISV is based on the 2020 Chevrolet Colorado ZR2 midsize truck architecture and uses 90 percent commercial-off-the-shelf parts, but is engineered to fulfill military requirements and designed to provide rapid ground mobility.

The ISV is light enough to be sling loaded from a UH-60 Blackhawk helicopter and compact enough to fit inside a CH-47 Chinook helicopter, and includes a Rollover Protection System for transportability on any battleground.

The facility is slated to manufacture 649 ISVs in support of the production of the 2,065 vehicles GM Defense is contracted to deliver per a $214.3 million award awarded to GM Defense in June.

The deal is the first major award since GM created a defense subsidiary in 2017.

GM Defense delivered its first ISV to the Army in October.

https://www.upi.com/Defense-News/2020/12/17/GM-Defense-begins-renovating-NC-facility-to-build-ISVs/4241608253661/

On the same subject

  • Italy stalls on missile program as budget cuts loom

    October 5, 2018 | International, Land

    Italy stalls on missile program as budget cuts loom

    By: Tom Kington ROME – Italy's new populist government has halted plans for a new missile defense system amid reports it will reduce defense procurements in 2019 to help fund welfare spending and tax cuts. This week, the defense ministry withdrew a request it had sent to parliament for permission to acquire the CAMM-ER missile system, built by European missile house MBDA and due to cost €545 million, or $626 million. The surprise U-turn on the program comes as Rome searches for funds to support a program of cash benefits for the poor and the jobless, pension boosts and tax cuts promised when the government took office in June. “There are real fears for procurement spending, with some predicting that €1 billion will be trimmed from procurements next year,” said an Italian defense-industry source who asked not to be named. Italy's defense procurement spending stood at €4.7 billion ($5.4 billion) in 2017, combining €2.1 billion from defense ministry coffers and €2.6 billion from Italy's Ministry for Economic Development. After inconclusive elections in March, the Five Star and League parties combined to form Italy's first populist government in June and announced their 2019 budget last week. It includes €10 billion for a so-called “citizen's wage," which Reuters reported amounts to a €780-per-month subsidy for the poorest Italians. The generous budget will push Italy's budget deficit up to 2.4 percent, arousing the wrath of European Union officials given the country's €2.4 trillion debt pile. Italian daily Corriere della Sera reported that during budget talks the head of the Five Star party warned Defense Minister Elisabetta Trenta that he would not agree on the launch of the CAMM-ER program this year. The report was denied by the government, but on Oct. 1 the request to parliament for approval of the purchase, which had been submitted on Aug. 10, was withdrawn, leaving it unclear whether it would be resubmitted. The Common Anti-air Modular Missile – Extended Range, to give it its full name, is a surface-to-air, short-and medium-range missile defense system. It is a variant of a similar weapon sold by manufacturer MBDA to the UK. Another sign of uncertainty hanging over Italy's defense spending is the absence so far this year of a three-year budget plan. Usually, in the spring, Italy's defense ministry publishes details of the current year's budget, with amounts listed per program, as well as budget predictions for the next two years. That document has yet to be published this year, suggesting a delay in calculating what funds can be made available in the coming years. The total government budget is now being nailed down for 2019, which will contain the top-line defense spending for next year. As such, next year's defense allocation may be discussed in parliament as early as next week. Meanwhile, the government has given conflicting signals about its commitments to the F-35 program, with defense minister Trenta suggesting Italy would stick to its order of 90 aircraft, before hinting the order would be cut. In a recent blog post, deputy prime minister Luigi Di Maio listed the F-35 as one of the projects the former Italian government had wasted money on. The new government so far has not formally telegraphed its interest in the UK's new plan for a fighter program, dubbed Tempest, despite the role to be played in that effort by Italy's Leonardo. The company operates facilities in the UK. However, last week, junior defense minister Angelo Tofalo said Italy “needed to enter the program immediately.” On Wednesday he told Defense News it was important that Italy took a leading role in international programs it joined. “The approach taken in the past has not allowed our country to acquire the know-how required to develop the most advanced technology autonomously. That is what happened, for example, on the F-35,” he said. https://www.defensenews.com/global/europe/2018/10/04/italy-stalls-on-missile-program-as-budget-cuts-loom

  • Russia uses Zircon hypersonic missile in Ukraine for first time, researchers say
  • DARPA: Expediting Software Certification for Military Systems, Platforms

    May 6, 2019 | International, Aerospace, Naval, Land, C4ISR, Security, Other Defence

    DARPA: Expediting Software Certification for Military Systems, Platforms

    Military systems are increasingly using software to support functionality, new capabilities, and beyond. Before a new piece of software can be deployed within a system however, its functional safety and compliance with certain standards must be verified and ultimately receive certification. As the rapid rate of software usage continues to grow, it is becoming exceedingly difficult to assure that all software considered for military use is coded correctly and then tested, verified, and documented appropriately. “Software requires a certain level of certification – or approval that it will work as intended with minimal risks – before receiving approval for use within military systems and platforms,” said Dr. Ray Richards, a program manager in DARPA's Information Innovation Office (I2O). “However, the effort required to certify software is an impediment to expeditiously developing and fielding new capabilities within the defense community.” Today, the software certification process is largely manual and relies on human evaluators combing through piles of documentation, or assurance evidence, to determine whether the software meets certain certification criteria. The process is time consuming, costly, and can result in superficial or incomplete evaluations as reviewers bring their own sets of expertise, experiences, and biases to the process. A lack of a principled means of decomposing evaluations makes it difficult to create a balanced and trustworthy process that applies equally to all software. Further, each subsystem and component must be evaluated independently and re-evaluated before it can be used in a new system. “Just because a subsystem is certified for one system or platform does not mean it is unilaterally certified for all,” noted Richards. This creates additional time delays and review cycles. To help accelerate and scale the software certification process, DARPA developed the Automated Rapid Certification Of Software (ARCOS) program. The goal of ARCOS is to create tools and a process that would allow for the automated assessment of software evidence and provide justification for a software's level of assurance that is understandable. Taking advantage of recent advances in model-based design technology, “Big Code” analytics, mathematically rigorous analysis and verification, as well as assurance case languages, ARCOS seeks to develop a capability to automatically evaluate software assurance evidence to enable certifiers to rapidly determine that system risk is acceptable. “This approach to reengineering the software certification process is well timed as it aligns with the DoD Digital Engineering Strategy, which details how the department is looking to move away from document-based engineering processes and towards design models that are to be the authoritative source of truth for systems,” said Richards. To create this automated capability, ARCOS will explore techniques for automating the evidence generation process for new and legacy software; create a means of curating evidence while maintaining its provenance; and develop technologies for the automated construction of assurance cases, as well as technologies that can validate and assess the confidence of an assurance case argument. The evidence generation, curation, and assessment technologies will form the ARCOS tools and processes, working collectively to provide a scalable means of accelerating the pathway to certification. Throughout the program's expected three phases, evaluations and assessments will occur to gauge how the research is progressing. ARCOS researchers will tackle progressively more challenging sets of software systems and associated artifacts. The envisioned evaluation progression will move from a single software module to a set of interacting modules and finally to a realistic military software system. Interested proposers will have an opportunity to learn more during a Proposers Day on May 14, 2019, from 8:30AM to 3:30PM (EST) at the DARPA Conference Center, located at 675 N. Randolph Street, Arlington, Virginia, 22203. The purpose of the Proposers Day is to outline the ARCOS technical goals and challenges, and to promote an understanding of the BAA proposal requirements. For details about the event, including registration requirements, please visit: https://www.fbo.gov/index?s=opportunity&mode=form&id=6a8f03472cf43a3558456b807877f248&tab=core&_cview=0 Additional information will be available in the forthcoming Broad Agency Announcement, which will be posted to www.fbo.gov. https://www.darpa.mil/news-events/2019-05-03

All news