13 juillet 2020 | International, Aérospatial

GA-ASI Conducts Japan Coast Guard Validation Flights

General Atomics Aeronautical Systems, Inc. (GA-ASI) announced that it will partner with Asia Air Survey (AAS) to hold a series of validation flights for the Japan Coast Guard (JCG) featuring GA-ASI's SeaGuardian beginning in mid-September.

The purpose of the flights is to validate the wide-area maritime surveillance capabilities of RPAS for carrying out JCG's missions, including search and rescue, disaster response, and maritime law enforcement. The flights are expected to run for approximately two months and will include support from the Japan Maritime Self Defense Force (JMSDF) at its Hachinohe base in Aomori Prefecture.

According to the JCG, the flight validation will be conducted in accordance with “The Policy on Strengthening the Maritime Security Systems,” using Unmanned Aerial Vehicles to perform maritime wide-area surveillance using new technology.

“We're pleased to support the JCG's goals of validating SeaGuardian's maritime surveillance performance,” said Linden Blue, CEO, GA-ASI. “We know there is a need in Japan and worldwide for affordable, long-endurance airborne surveillance in the maritime domain.”

The SeaGuardian system will feature a multi-mode maritime surface-search radar with Inverse Synthetic Aperture Radar (ISAR) imaging mode, an Automatic Identification System (AIS) receiver, and High-Definition – Full-Motion Video sensor equipped with optical and infrared cameras. This sensor suite enables real-time detection and identification of surface vessels over thousands of square nautical miles.

The featured Raytheon SeaVue surface-search radar system provides automatic tracking of maritime targets and correlation of AIS transmitters with radar tracks.

https://www.uasvision.com/2020/07/09/ga-asi-conducts-japan-coast-guard-validation-flights/

Sur le même sujet

  • Rolls Royce shares recover after Cathay Pacific inspection

    3 septembre 2024 | International, Aérospatial

    Rolls Royce shares recover after Cathay Pacific inspection

  • Warship selected by Canada won’t be in U.S. competition – Americans accepting only proven designs

    25 juin 2019 | International, Naval

    Warship selected by Canada won’t be in U.S. competition – Americans accepting only proven designs

    DAVID PUGLIESE The US Navy is moving ahead with its frigate program but the ship design selected by Canada, the United Kingdom and Australia won't be considered as the Americans are only considering proven vessels. Because the U.S. FFG(X) future frigate competition will only accept proven, at-sea designs, BAE Systems of the United Kingdom has decided not to enter its Type 26 Global Combat Ship in the competition, the U.S. Naval Institute's publication, USNI News, reports. The Canadian government plans to buy 15 Type 26 warships in a project now estimated by the Parliamentary Budget Officer to cost $70 billion. The project, known as Canadian Surface Combatant, is the largest single expenditure in Canadian government history. The Liberal government announced in February that it had entered into a contract with Irving Shipbuilding to acquire new warships based on the Type 26 design being built in the United Kingdom. With Canada ordering 15 of the warships, the Royal Canadian Navy will be the number one user of the Type 26 in the world. The United Kingdom had planned to buy 13 of the ships for its Royal Navy but cut that down to eight. Australia plans to buy nine of the vessels designed by BAE. But the Type 26 design is unproven. Construction of the first ship for the Royal Navy began in the summer of 2017 but that vessel is not expected to be accepted into service until 2025. Canada hopes to begin construction of its first Type 26 in the early 2020s. Alan Baribeau, a spokesman for U.S. Naval Sea Systems Command, told USNI News, the U.S. Navy requires a proven, in-the-water design for its future frigate program. “To promote and provide for full and open competition, the Navy will consider any hull form — foreign and domestic — that meets the requirements, will be built in a U.S. shipyard and has a parent design that has been through production and demonstrated (full scale) at sea,” Baribeau told USNI News. The entry of the BAE Type 26 warship in the Canadian competition was controversial from the start and sparked complaints the procurement process was skewed to favour that vessel. Previously the Liberal government had said only mature existing designs or designs of ships already in service with other navies would be accepted, on the grounds they could be built faster and would be less risky. Unproven designs can face challenges as problems are found once the vessel is in the water and operating. But the requirement for a mature design was changed and the government and Irving accepted the BAE design, though at the time it existed only on the drawing board. Company claims about what the Type 26 ship can do, including how fast it can go, are based on simulations or projections. The two other bidders in the Canadian program had ships actually in service with other navies so their capabilities were known. The Canadian Surface Combatant program is being run by Irving Shipbuilding to replace the navy's fleet of Halifax-class frigates and the Iroquois-class destroyers the navy previously operated. The updated estimate on the surface combatant program, compiled by the Parliamentary Budget Office and released June 21, covers the cost of project development, production of the ships, two years of spare parts and ammunition, training, government program management, upgrades to existing facilities, and applicable taxes. The previous Conservative government originally estimated the cost of the ships to be around $26 billion. The Department of National Defence now states that its estimate is between $56 billion and $60 billion. BAE Systems told USNI News that it would not be submitting any proposals for the U.S. FFG(X) program unless the U.S. Navy dumps its requirements for a proven hull design. The U.S. does not have any intention of changing its requirements. Four companies are expected to submit bids for the U.S. program– Austal USA, Fincantieri Marine, General Dynamics Bath Iron Works and Ingalls Shipbuilding – with deadlines of August 22 for technical proposals and September 26 for pricing proposals, the USNI News reported. The Canadian Surface Combatant program is currently in the development phase. The government projects the acquisition phase to begin in the early 2020s with deliveries to begin in the mid-2020s. The delivery of the 15th ship, slated for the late 2040s, will mark the end of that project. https://ottawacitizen.com/news/national/defence-watch/warship-selected-by-canada-wont-be-in-u-s-competition-americans-accepting-only-proven-designs

  • The Pentagon wants help for its satellites to talk to each other

    16 janvier 2020 | International, C4ISR

    The Pentagon wants help for its satellites to talk to each other

    By: Nathan Strout The Space Development Agency wants its satellites to be able to easily talk to each other and is considering using optical intersatellite links for communications within its future low earth orbit space architecture. Now, the organization is looking for industry's help on what standards should be used for those links. On Jan. 15, the agency issued a request for information to industry to inform its attempt to establish an Optical Intersatellite Link Open Standard. Most satellites don't speak with each other directly. Instead, they utilize radio-frequency communications with a ground station to relay communications between satellites. Some satellites, however, are able to use optical links to provide direct communications between satellites without a ground station acting as an intermediary. The SDA wants to use this technology for what it calls its “transport layer,” the backbone of its plans for a new space architecture in low earth orbit. The SDA was established in March 2019 to design the Department of Defense's future threat-driven space architecture, a setup it has since defined as a multi-layered constellation of hundreds of small satellites providing several capabilities from LEO. The SDA will not be directly responsible for every layer or constellation within the architecture — most notably, the Hypersonic and Ballistic Tracking Space Sensor is being developed primarily by the Missile Defense Agency — however, the SDA will be the agency in charge of integrating those various efforts into a single architecture. Key to the entire enterprise is the Tracking Layer, a family of satellites in low earth orbit that will facilitate the flow of data between satellites in orbit and between satellites and the ground. The Transport Layer will be essential in connecting the various sensors and capabilities on orbit with weapons systems on the ground or in the air. In order to build that capability, the SDA plans to use Optical Intersatellite Links. The optical links will also need to provide range estimates of the distance between satellites in orbit and between satellites and the ground to within a meter in order to provide highly precise timing and positional data for the constellation. The SDA also envisions each satellite utilizing a chip-scale atomic clock as well as GPS signals. The problem is that there are currently no industry standards for those links. To ensure the interoperability of various vendor technologies used for those links, the SDA wants to establish that standard, and it's asking industry for help. Responses are due by Feb. 5. More specifics about what the SDA is considering for its standards is available on beta.sam.gov. According to the request, the SDA plans to issue a solicitation for Tranche 0 of the Transportation Layer in Spring 2020, with additional solicitations for the other capability layers to follow in the summer. That first tranche, known as the war fighter immersion tranche, will consist “of tens of satellites providing periodic, regional sensing and data transport capabilities, including the capability to detect hypersonic glide vehicles and to disseminate time sensitive targeting solutions over tactical data links.” According to the agency, that initial tranche could be delivered as early as fiscal year 2022 https://www.c4isrnet.com/battlefield-tech/c2-comms/2020/01/16/the-pentagon-wants-help-for-its-satellites-to-talk-to-each-other/

Toutes les nouvelles