18 mars 2024 | International, Terrestre

Exclusive: US explored adding more cobalt to defence stockpiles, sources say

Sur le même sujet

  • Air Force quietly, and reluctantly, pushing JSTARS recap source selection ahead

    9 juillet 2018 | International, Aérospatial, C4ISR

    Air Force quietly, and reluctantly, pushing JSTARS recap source selection ahead

    By: Valerie Insinna WASHINGTON — Congress is waging a public battle on the fate of the JSTARS recap program, but behind the scenes, the Air Force is quietly taking steps that will allow them to award a contract for a program that leaders say they don't need. The service received final proposal revisions for the JSTARS recap program on June 22, confirmed Air Force spokeswoman Maj. Emily Grabowski in a statement to Defense News. “The Air Force wants to be postured to move forward with JSTARS recap, if required. Therefore, we are continuing source selection while we continue to work with Congress on the way forward,” Grabowski said in a statement. Usually, the government solicits final proposals and pricing information from competitors just weeks before making a final downselect. Thus, if Congress decides to force the Air Force to continue on with the program, it's likely the service will be able to award a contract in very short order. The Air Force began the JSTARS recap program as an effort to replace its aging E-8C Joint Surveillance Target Attack Radar System ground surveillance planes with new aircraft and a more capable radar. The initial plan was to buy 17 new JSTARS recap jets from either Boeing, Lockheed Martin or Northrop Grumman. However, the service announced during February's fiscal year 2019 budget rollout that it preferred to cancel the JSTARS recap program and fund an “Advanced Battle Management System” that would upgrade and link together existing aircraft and drones, allowing them to do the JSTARS mission. The Air Force's continued source selection efforts are necessary due to Congress, which is split on the issue of whether to continue to the program. Both Senate defense committees have sided with the Air Force, and would allow it to kill JSTARS recap as long as it continues to fund the current JSTARS fleet. The Senate version of the defense spending bill also includes an additional $375 million to accelerate the ABMS concept with additional MQ-9 Reapers and other technologies. Meanwhile, the House version of the bill would force the Air Force to award an engineering and manufacturing development contract for JSTARS recap to one of the three competitors, which had been valued at $6.9 billion. However, some lawmakers have said they might be willing to accept a truncated recap program to bridge the way until ABMS is fielded. “All of the committees understand the need for moving to the advanced battle management system,” Gen. Mike Holmes, head of Air Combat Command, told reporters in June. “If there are disagreements between the committees, it's about whether we can move straight to that and hold onto our legacy JSTARS as a way to bridge until we do that, or do we need to do one more recap of that system” The timing of final proposal revisions actually puts source selection for JSTARS recap ahead of that of the still ongoing T-X trainer jet program, which as of late June had not reached that stage. However, Congress will likely need time to resolve the JSTARS recap issue — meaning a contract decision is far from imminent. The House and Senate armed services committees began the conference process in June, which could allow them to reconcile differences in the defense policy bill as early as this summer. However, only appropriations bills can be used to fund government programs like JSTARS recap, and spending legislation could be stuck in limbo for months past that. If deliberations stretch out, “the Air Force will continue to assess contract award timelines and approvals. If necessary, the Air Force will request an extension of proposal validity or updated pricing as appropriate,” Grabowski said. Meanwhile, lawmakers continue to debate the case in the public eye. In a July 3 editorial for The Telegraph, Republican Rep. Austin Scott, one of the biggest proponents of the recap program, argued that it would be more economical to proceed with JSTARS recap than to continue to do extensive depot maintenance on the legacy aircraft. “After 10 years of work, the Air Force is considering canceling the JSTARS recap program,” wrote Scott, whose district in Georgia is home to Robins Air Force base, where the JSTARS aircraft reside. “Their arguments do not take into account the significantly improved capabilities and increased capacity that the new aircraft will provide. The Air Force has ignored its own assessments in their recommendation for cancellation.” https://www.defensenews.com/air/2018/07/06/air-force-quietly-and-reluctantly-pushing-jstars-recap-source-selection-ahead/

  • FLIR Awarded $92.9 Million Contract for Logistics Support to U.S. Army Product Manager Force Protection Systems

    18 décembre 2019 | International, Terrestre, C4ISR

    FLIR Awarded $92.9 Million Contract for Logistics Support to U.S. Army Product Manager Force Protection Systems

    Arlington, Va., December 16, 2019 ― FLIR Systems, Inc. (NASDAQ: FLIR) announced that it has been awarded a five-year, firm-fixed-price Indefinite Delivery, Indefinitely Quantity (IDIQ) contract by the U.S. Army Contracting Command, Aberdeen Proving Ground, Maryland. The IDIQ vehicle has a ceiling value of $92.9 million, with an initial order of $5.2 million. The award is for repair, refurbishment, and logistics support of electro-optical (EO) and infrared (IR) sensors used by the Army's Product Manager Force Protection Systems programs, including Base Expeditionary Targeting Surveillance System-Combined (BETSS-C), Combat Outpost Surveillance Force Protection System, and Foreign Military Sales. BETSS-C entails a combination of cameras and surveillance equipment mounted on deployable towers and used to monitor wide areas around important military locations and bases. FLIR has been part of the BETSS-C effort since 2004 when it was called RAID, providing long-range EO/IR sensors at the heart of the system. Today, the company supplies high-definition sensors for BETSS-C as well as radars capable of detecting vehicles, people, or other moving objects at range. FLIR has delivered more than a thousand EO/IR sensors to the U.S. Army as part of the BETSS-C program. This latest IDIQ maintains the service partnership and related revenues FLIR has accrued with the Army, while augmenting the company's ability to meet their needs. “BETSS-C is a critical piece of technology that supports the safety of U.S. forces and its allies at locations around the world,” said David Ray, president of FLIR Systems' Government and Defense business unit. “We value this opportunity to support the Army and optimize the capabilities of this vital surveillance system.” The contract covers a five-year period of performance starting in the fourth quarter of 2019. Work will be performed at FLIR's Wilsonville, Oregon site and international repair facilities. About FLIR Systems, Inc. Founded in 1978, FLIR Systems is a world-leading industrial technology company focused on intelligent sensing solutions for defense, industrial, and commercial applications. FLIR Systems' vision is to be “The World's Sixth Sense,” creating technologies to help professionals make more informed decisions that save lives and livelihoods. For more information, please visit www.flir.com and follow @flir. Forward Looking Statements The statements in this release by David Ray and the other statements in this release about the contract and order described above are forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Such statements are based on current expectations, estimates, and projections about FLIR's business based, in part, on assumptions made by management. These statements are not guarantees of future performance and involve risks and uncertainties that are difficult to predict. Therefore, actual outcomes and results may differ materially from what is expressed or forecasted in such forward-looking statements due to numerous factors, including the following: the ability to manufacture and deliver the systems referenced in this release, changes in pricing of FLIR's products, changing demand for FLIR's products, product mix, the impact of competitive products and pricing, constraints on supplies of critical components, excess or shortage of production capacity, the ability of FLIR to manufacture and ship products in a timely manner, FLIR's continuing compliance with U.S. export control laws and regulations, and other risks discussed from time to time in FLIR's Securities and Exchange Commission filings and reports. In addition, such statements could be affected by general industry and market conditions and growth rates, and general domestic and international economic conditions. Such forward-looking statements speak only as of the date on which they are made and FLIR does not undertake any obligation to update any forward-looking statement to reflect events or circumstances after the date of this release, or for changes made to this document by wire services or Internet service providers. View source version on FLIR Systems: https://www.flir.com/news-center/military/flir-awarded-$92.9-million-contract-for-logistics-support-to-u.s.-army-product-manager-force-protection-systems/

  • Navy Receives Production Approval for Next-Generation Air Combat Training System - Seapower

    4 mai 2021 | International, Aérospatial, Naval

    Navy Receives Production Approval for Next-Generation Air Combat Training System - Seapower

    PATUXENT RIVER, Md. — The Naval Aviation Training Systems and Ranges program office (PMA-205) received Milestone C approval for its next-generation air combat training system, the Tactical Combat Training System Increment II (TCTS II) on April 27, the Naval Air...

Toutes les nouvelles