8 juin 2020 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

Contract Awards by US Department of Defense - June 05, 2020

NAVY

General Electric Co. GE Aviation, Lynn, Massachusetts, is awarded a $180,599,648 firm-fixed-price, indefinite-delivery/indefinite-quantity contract. This contract procures commercial depot level services for the repair and overhaul of T700-GE-401/401C turbo shaft engines, cold section modules and power turbine modules for the Navy H-60 Seahawk helicopter as well as the Marine Corps H-1 Cobra and Bell UH-1 Huey aircraft. Work will be performed in Wingsfield, Kansas, and is expected to be complete by June 2025. No funds will be obligated at the time of award. Funds will be obligated on individual orders as they are issued. This contract was not competitively procured pursuant to 10 U.S. Code 2304 (c)(1). The Naval Air Warfare Center Aircraft Division, Patuxent River, Maryland, is the contracting activity (N00421-20-D-0115).

Vigor Marine LLC, Portland, Oregon, is awarded a $56,450,644 firm-fixed-price contract for a 210-calendar day split shipyard availability for the regular overhaul and dry docking of the hospital ship U.S. Naval Ship Mercy (T-AH 19). Work will be performed in Portland, Oregon, and is expected to be complete by August 2021. This contract includes one base period and 17 options and, if exercised, will bring the cumulative value to $61,201,329. Fiscal 2020 and 2021 working capital funds (Navy) are obligated in the amount of $56,450,644 and will not expire at the end of the fiscal year. This contract was competitively procured. Proposals were solicited via the Government Point of Entry website, and one offer was received. The Navy's Military Sealift Command, Norfolk, Virginia, is the contracting activity (N32205).

Systems Engineering Associates Corp. (SEA CORP),* Middletown, Rhode Island, is awarded a $26,643,618 cost-plus-fixed-fee and cost-only contract for services to develop, upgrade and apply the Extensible Markup Language Test Data Analysis Tool (XTDAS). Work will be performed in Middletown, Rhode Island (55%); Newport, Rhode Island (25%); Port Canaveral, Florida (5%); Andros Island, Bahamas (5%); other contractor labs and facilities (5%); and on-board platforms and ranges (5%), and is expected to be complete by June 2025. This contract was not competitively procured in accordance with 10 U.S. Code 2304(b)(2) because the Systems Engineering Associates Corp. developed the XTDAS under the Small Business Innovative Research (SBIR) program and its continued performance constitutes an SBIR Phase III contract. Per the Small Business Administration SBIR policy directive, to the greatest extent practicable, agencies shall issue Phase III awards relating to technology, including sole-source awards, to the SBIR awardee (in this instance SEA CORP) that developed the technology. Fiscal 2020 shipbuilding and conversion (Navy) funds in the amount of $314,977 will be obligated at the time of award and will not expire at the end of the current fiscal year. The Naval Undersea Warfare Center Division Newport, Newport, Rhode Island, is the contracting activity (N66604-20-D-L000).

Booz Allen Hamilton Inc., McLean, Virginia, is awarded a $12,355,663 firm-fixed-price modification to previously awarded contract M67400-18-F-0065 to exercise Option Year Two for analytics support for III Marine Expeditionary Force and Marine Corps Installations Pacific (MCIPAC). Work will be performed in Okinawa, Japan, and is expected to be complete by July 2021. Fiscal 2020 operations and maintenance (Marine Corps) funding in the amount of $12,355,663 will be obligated at the time of award and will expire at the end of the current fiscal year. The MCIPAC Regional Contracting Office, Marine Corps Base Camp Butler, Okinawa, Japan, is the contracting activity.

Northrop Grumman Systems Corp., Apopka, Florida, is awarded a $7,289,968 modification to firm-fixed-price, supply job order N00164-17-F-J272 under basic ordering agreement N00164-17-G-JQ08 for the procurement of 56 single-color diode-pumped laser designators. Work will be performed in Apopka, Florida. This procurement of 56 laser designators will support the Common Sensor Payload Program's Multi-spectral Targeting System (MTS) Family of Electro-optic Infrared (EO/IR) Sensors. Work is expected be complete by June 2022. Fiscal 2020 operations and maintenance (Army) funding in the amount of $7,289,968 will be obligated at the time of award and will expire at the end of the current fiscal year. In accordance with 10 U.S. Code 2304(c)(1), this job order was not competitively procured; only one responsible source and no other supplies or services will satisfy agency requirements. The laser designators are in support of the MTS EO/IR sensor, which has been deployed on Army Gray Eagle aircraft to facilitate and enable the delivery of laser-guided munitions. The Naval Surface Warfare Center, Crane, Indiana, is the contracting activity.

DEFENSE LOGISTICS AGENCY

Janz Corp.,* Reynoldsburg, Ohio, has been awarded a maximum $45,000,000 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for surgical lasers, tables and their related accessories. This was a competitive acquisition with 105 responses received. This is a five-year contract with no option periods. Location of performance is Ohio, with a June 4, 2025, ordering period end date. Using customers are Army, Navy, Air Force, Marine Corps and federal civilian agencies. Type of appropriation is fiscal 2020 through 2025 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE2D1-20-D-0010).

Outdoor Venture Corp.,* Stearns, Kentucky, has been awarded a maximum $9,696,612 firm-fixed-priced, indefinite-delivery/indefinite-quantity contract for military standard Temper tents. This was a competitive acquisition with two responses received. This is a one-year base contract with four, one-year option periods. Location of performance is Kentucky, with a June 2, 2021, performance completion date. Using military services are Army, Navy, Air Force and Marine Corps. Type of appropriation is fiscal 2020 through 2021 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE1C1-20-D-1249).

Blind Industries and Services of Maryland,** Baltimore, Maryland, has been awarded a maximum $8,750,000 firm-fixed-price, indefinite-quantity contract for face covers. This is a one-year contract with no option periods. This was a sole-source acquisition using authority granted by the expanded AbilityOne procurement list, make-to-order notice dated April 9, 2020. Location of performance is Maryland, with a June 4, 2021, performance completion date. Using military services are Army, Navy, Air Force and Marine Corps. Type of appropriation is fiscal 2020 through 2021 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE1C1-20-D-B089).

AIR FORCE

Trident Systems Inc.,* Fairfax, Virginia, has been awarded a $35,000,000 maximum ordering amount, indefinite-delivery/indefinite-quantity, cost-plus-fixed-fee and firm-fixed-price orders for Secure Collaborative Technology (SCTECH) software and hardware. This contract provides for the research, adaptation, enhancement and transition of critical Small Business Innovative Research (SBIR) technologies to provide new capabilities which are secure and provide access between multiple levels of security domains and bridge between different chat protocols. This effort will result in the delivery of several software releases to the SCTECH user community, to include computer software, technical documentation, hardware, installation and maintenance of the current systems located at existing customer sites. Work will be performed in Fairfax, Virginia; and Morrisville, North Carolina, and is expected to be completed June 5, 2025. This award is the result of a sole-source acquisition under the SBIR program. Air Force Research Laboratory, Rome, New York, is the contracting activity (FA8750-20-D-0600).

Work Services Corp., Wichita Falls, Texas, has been awarded a $20,537,296 firm-fixed-price modification (P00010) to contract FA3020-18-C-0013 for food services. Work will be performed at Sheppard Air Force Base, Texas, and is expected to be completed June 30, 2021. Fiscal 2020 operations and maintenance funds in the amount of $10,104,410 are being obligated at the time of award. The total cumulative face value of the contract is $57,366,955. The 82nd Contracting Squadron, Sheppard AFB, Texas, is the contracting activity (FA3020-18-C-0013).

General Electric Co., Cincinnati, Ohio, has been awarded a $20,000,000 cost-plus-fixed-fee modification (P00053) to contract FA8626-16-2138 for COVID-19 industrial base support. The contract modification is for the execution of an out-of-scope modification with a new statement of work and justification and approval to issue an undefinitized contract action, which is being used to preserve an at risk industrial base impacted by the COVID-19 pandemic. Work will be performed in Cincinnati, Ohio, and is expected to be completed Jan. 31, 2021. Fiscal 2020 Defense Production Act Title III funds in the amount of $15,868,844 are being obligated at the time of award. Total cumulative face value of the contract is $1,449,920,786. Air Force Life Cycle Management Center, Wright-Patterson Air Force Base, Ohio, is the contracting activity.

Northrop Grumman Systems Corp., Clearfield, Utah, has awarded a ceiling $11,345,659 firm-fixed-price modification (P00022) to contract SPE4AX-19-D-9404 for left-hand and right-hand wing tips for the T-38 weapon system. Work will be performed in Stockton, California, and is expected to be completed July 2027. Fiscal 2020 working capital funds in the amount of $2,624,384 are being obligated at the time of award. Air Force Sustainment Center, Hill Air Force Base, Utah, is the contracting activity.

ARMY

Novavax Inc.,* Gaithersburg, Maryland, was awarded a $21,952,384 cost-no-fee contract for the development and production of the Novavax nanoparticle vaccine against COVID-19. Bids were solicited via the internet with one received. Work will be performed in Gaithersburg, Maryland, with an estimated completion date of June 3, 2021. Fiscal 2020 Defense Health Agency Coronavirus Aid, Relief and Economic Security Act funds in the amount of $21,952,384 were obligated at the time of award. U.S. Army Contracting Command, Aberdeen Proving Ground, Maryland, is the contracting activity (W911QY-20-C-0077). (Awarded June 4, 2020)

Northrop Grumman Systems Corp., Herndon, Virginia, was awarded a $21,703,157 modification (P00063) to contract W58RGZ-17-C-0014 for logistics support services for government-owned fixed wing fleet performing special electronic mission aircraft missions. Work will be performed in Herndon, Virginia, with an estimated completion date of Aug. 31, 2021. Fiscal 2020 operations and maintenance (Army) funds in the amount of $21,703,157 were obligated at the time of award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity.

Science Applications International Corp., Reston, Virginia, was awarded a $10,693,344 modification (000182) to contract W31P4Q-18-A-0011 for converged infrastructure engineering support; technical modeling support, containerized weapon system mission data analysis and engineering support; implementation support; and precision fires manager engineering and analysis. Work will be performed at Shaw Air Force Base, South Carolina, with an estimated completion date of June 4, 2021. Fiscal 2020 operations and maintenance (Army) funds in the amount of $10,693,344 were obligated at the time of award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity.

Ocean Construction Services Inc.,* Virginia Beach, Virginia, was awarded a $9,492,405 firm-fixed-price contract for road repairs at Arlington National Cemetery. Bids were solicited via the internet with 11 received. Work will be performed in Arlington, Virginia, with an estimated completion date of Oct. 5, 2021. Fiscal 2020 cemeterial expenses (Army) funds in the amount of $9,492,405 were obligated at the time of award. U.S. Army Corps of Engineers, Norfolk, Virginia, is the contracting activity (W91236-20-C-0019).

*Small Business
**Mandatory Source

https://www.defense.gov/Newsroom/Contracts/Contract/Article/2210304/source/GovDelivery/

Sur le même sujet

  • Le soutien aux exportations d'armement risque de mettre les armées sous tension pour certaines missions - Zone Militaire

    13 mai 2022 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Le soutien aux exportations d'armement risque de mettre les armées sous tension pour certaines missions - Zone Militaire

    Comme l'a souligné la Cour des comptes dans le rapport qu'elle a publié le 11 mai sur les capacités des forces françaises, la trajectoire financière

  • Alaska-based long-range ballistic missile defense radar fielding delayed by a year

    10 août 2020 | International, Aérospatial

    Alaska-based long-range ballistic missile defense radar fielding delayed by a year

    By: Jen Judson WASHINGTON — The fielding of a U.S. Air Force radar to detect ballistic missile threats, currently being installed at Clear Air Force Station, Alaska, is delayed by roughly a year, according to a recent Government Accountability Office report. Information provided by the Missile Defense Agency in June to the GAO indicated all construction and integration activities for the Long Range Discrimination Radar had stopped in March due to the coronavirus pandemic. While initial fielding was planned for fiscal 2021 and transfer to the Air Force was planned for fiscal 2022, the service is now expected to take ownership of the operational radar in late fiscal 2023. “We did have some fallback in developing and delivery of systems because it requires people to be in close, confined spaces and sitting at computer terminals working through really tough problems like the development of an algorithm,” MDA Director Vice Adm. Jon Hill said at the virtually held Space and Missile Defense Symposium on Aug. 4. MDA shut down radar installation efforts due to the COVID-19 pandemic, entering a “caretaker status,” Hill said. “That requires additional work. I mean, you've got a radar that is being built in a tough environment like Alaska — you can't just stop. You have to go in and make sure the radar arrays are protected,” he added. The LRDR is an S-band radar that will not only be able to track incoming missiles but also discriminate the warhead-carrying vehicle from decoys and other nonlethal objects for the Ground-Based Midcourse Defense System, which is designed to protect the continental U.S. from possible intercontinental ballistic missile threats from North Korea and Iran. Lockheed Martin is LRDR's manufacturer. The program, according to the GAO report, wrapped up its system prototype assessment in an operational environment in FY19, which showed the hardware and software was mature ahead of full-rate manufacturing. That assessment was delayed from FY18, the report noted, after testing took longer due to “required antenna reconfigurations and software fixes to complete.” The fixes resulted in a cost overrun of $25 million and caused a delay in completing a developmental step associated with satellite tracking expected in FY18, according to the report. “While construction was ongoing in [FY19], the program was monitoring risks that could threaten the upcoming transfer of LRDR custody and ownership to the government,” the report stateed. “Specifically the program was focusing on manufacturing of the Array Panels, Sub Array Assembly Suite modules, and Auxiliary Power Group cabinets, as well as ensuring integration on site.” Those issues “depleted schedule margin on the path towards the transfer,” which was scheduled for the fourth quarter of FY20, according to the GAO, and the transfer of LRDR custody to the government was pushed back to the first quarter of FY21 due to radar component production issues. “The good news is construction is back up and running,” Hill said, “and we are delivering those arrays that are going into low-power and high-power testing later this year, so we are pretty excited about that.” According to the GAO, the current test plan for LRDR has just one flight test scheduled in the third quarter of FY21, after two ground tests. The report does not clarify if the pandemic has caused a delay in these tests. The GAO indicated concern about conducting two ground tests before the program's only flight test, as it “increases the likelihood that the models will not be accredited when testing is complete.” As a result, “the performance analysis and the majority of the model validation and accreditation will have to be made concurrently, just prior to the LRDR Technical Capability Declaration,” scheduled for the third quarter of FY21, the report stated. “This increases the risk of discovering issues late in development, which could result in performance reductions or delivery delays.” https://www.defensenews.com/digital-show-dailies/smd/2020/08/07/alaska-based-long-range-ballistic-missile-defense-radar-fielding-delayed-by-a-year/

  • US Space Force awards third contract for anti-jamming SATCOM prototypes

    13 novembre 2020 | International, Aérospatial, C4ISR

    US Space Force awards third contract for anti-jamming SATCOM prototypes

    Nathan Strout WASHINGTON — The U.S. Space Force has awarded Lockheed Martin a contract to build a new anti-jamming communications satellite prototype, bringing the number of companies working on that program to three. Under the contracts, each company will develop a prototype payload for the Evolved Strategic Satellite Communications program. ESS is intended to be the successor to the Advanced Extremely High Frequency constellation, which provides secure, survivable SATCOM for strategic communications. “We understand the mission and the threat, and we're committed to providing the Space Force and our war fighters with the best protected communications solutions for the Evolved Strategic SATCOM program that will help us stay ahead of the growing threat,” a Lockheed Martin spokesperson said in a statement. Lockheed is the third company to be selected for the prototyping effort, having been awarded $258 million on Nov. 9. This follows a $298 million award to Northrop Grumman in September and a $298 million contract to Boeing in October. The prototypes are due to be completed in five years in the order in which they were awarded, with Northrop Grumman and Boeing given a May 2025 deadline and Lockheed given a June 2025 deadline. Lockheed's contract is expected to be the final ESS prototyping award, as Space Force 2021 budget documents noted that the service planned to issue three contracts at most. “This approach will award up to three contracts in FY 2020 to focus on reducing space segment risks with the objective of maximizing ESS demonstrated capability for the payload and other key technologies,” the budget proposal read. All three prototyping contractors will be brought through follow-on source selection until the follow-on contract is ultimately awarded. ESS satellites are expected to work with and eventually replace the Advanced Extremely High Frequency, or AEHF, satellites, the sixth and final of which was launched into orbit in March. However, ESS will differ from its predecessor in a few key ways. First, the new satellites will have enhanced resilience and cybersecurity capabilities, according to the Space Force. Also, the ESS constellation will include polar coverage — something not currently provided with AEHF. Instead, AEHF relies on the Enhanced Polar Systems satellites to extend the network over the polar regions. https://www.c4isrnet.com/battlefield-tech/space/2020/11/12/space-force-awards-third-contract-for-anti-jamming-satcom-prototypes/

Toutes les nouvelles