19 juillet 2019 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité, Autre défense

Contract Awards by US Department of Defense - July 18, 2019

NAVY

ERAPSCO, Joint Venture of Sparton and USSI, Columbia City, Indiana, is awarded a not-to-exceed $1,041,042,690 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for the manufacture and delivery of a maximum quantity of 37,500 AN/SSQ-36B, 685,000 AN/SSQ-53G, 120,000 AN/SSQ-62F, and 90,000 AN/SSQ-101B production sonobuoys for fiscal years 2019-2023. Sonobuoys are air launched expendable, electro-mechanical anti-submarine warfare acoustic sensors designed to relay underwater sounds associated with ships and submarines. Work will be performed in De Leon Spring, Florida (51%); and Columbia City, Indiana (49%), and is expected to be completed in September 2025. No funds will be obligated at the time of award. Funds will be obligated on individual orders as they are issued. This contract was not competitively procured pursuant to 10 U.S. Code 2304(c)(1). The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity (N00019-19-D-0032).

MW Services Inc.,* Temecula, California, is awarded a maximum amount $99,000,000 indefinite-delivery/indefinite-quantity contract for commercial and institutional building construction alterations, renovations and repair projects at Naval Bases Coronado, Point Loma, and San Diego; and Marine Corps Air Station, Miramar. Projects will be primarily design-bid-build (fully designed) task orders or task order with minimal design effort (e.g. shop drawings). Projects may include, but are not limited to, alterations, repairs, and construction of administration buildings, maintenance/repair facilities, aircraft control towers, hangars, fire stations, office buildings, laboratories, dining facilities and related structures. Work will be performed in San Diego, California, with the term of the contract not to exceed 60 months with an expected completion date of July 2024. Fiscal 2019 operations and maintenance (Navy) contract funds in the amount of $5,000 are obligated on this award and will expire at the end of the current fiscal year. Future task orders will be primarily funded by operations and maintenance (Navy). This contract was competitively procured via the Navy Electronic Commerce Online website, with 18 proposals received. The Naval Facilities Engineering Command, Southwest, San Diego, California, is the contracting activity (N62473-19-D-2625).

Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is being awarded a $77,708,000 modification (P00019) to a previously awarded firm-fixed-price, fixed-price-incentive-firm-target advanced acquisition contract (N00019-17-C-0001). This modification provides for the procurement of software data loads as well as long lead material and parts for the delivery of F-35 Lightning II low-rate initial production Lots 12, 13 and 14. Work will be performed in Fort Worth, Texas (30%); El Segundo, California (25%); Warton, United Kingdom (20%); Orlando, Florida (10%); Nashua, New Hampshire (5%); Nagoya, Japan (5%); and Baltimore, Maryland (5%), and is expected to be completed in March 2023. International partner funds in the amount of $77,708,000 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.

Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $34,670,000 undefinitized cost-plus-incentive-fee contract to develop and deliver an engineering change proposal to enable the production cut-in of the Fuselage Station 425 Bulkhead structural modification required for F-35A and F-35C to allow full-envelope internal carriage of aft heavy weaponry. Work will be performed in Fort Worth, Texas, and is expected to be completed in July 2022. Fiscal 2019 research, development, test and evaluation (Air Force, Navy and Marine Corps); and non-U.S. Department of Defense (DoD) participant funds in the amount of $9,953,400 will be obligated at time of award, none of which will expire at the end of the current fiscal year. This contract was not competitively procured pursuant to U.S. Code 2304(c)(1). This undefinitized contract combines purchases for the Air Force ($13,787,219; 39.77%); Navy ($6,893,610; 19.88%); Marine Corps ($6,893,609; 19.88%); and non-U.S. DoD participants ($7,095,562; 20.46%). The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity (N00019-19-C-0010).

Lockheed Martin, Rotary and Mission Systems, Moorestown, New Jersey, is awarded a $22,558,157 cost-plus-incentive-fee modification to previously awarded contract N00024-16-C-5102 to exercise options for AEGIS Baseline 9 integration and delivery, Aegis Baseline 5.4 and 9A2A post-certification support. This contract provides for the completion of the development and fielding of the AEGIS Baseline 9 AEGIS Weapon System and integrated AEGIS Combat System on the remaining AEGIS Technical Insertion (TI) 12 configured destroyers as well as TI 12 and TI 08 configured cruisers. Work will be performed in Moorestown, New Jersey, and is expected to be completed by July 2020. Fiscal 2018 other procurement (Navy); fiscal 2019 operations and maintenance (Navy); fiscal 2019 research, development, test and evaluation (Navy); fiscal 2019 research, development, test and evaluation (Missile Defense Agency); and fiscal 2014 shipbuilding and conversion (Navy) funds in the amount of $8,925,765 will be obligated at time of award and funding in the amount of $2,456,011 will expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.

R.A. Burch Construction Co. Inc., Ramona, California, is awarded $17,521,988 for firm-fixed-price task order N62473-19-F-4738 under a previously awarded multiple award construction contract (N62473-18-D-5852) for the construction of a forklift rework facility at Naval Base Coronado. The work to be performed provides for implementation of site improvements such as vehicle parking, storage and laydown yard, landscaping, and low-impact design storm water features as well as incidental related work. The facility is required in order to relocate existing tenants away from a separate project site area to make a complete and useable airfield facility. Work will be performed in San Diego, California, and is expected to be completed by December 2021. Fiscal 2019 military construction (Navy) contract funds for $17,521,988 are obligated on this award and will not expire at the end of the current fiscal year. Five proposals were received for this task order. The Naval Facilities Engineering Command, Southwest, San Diego, California, is the contracting activity.

San Diego Gas and Electric (SDG&E) Co., a public utility company regulated by the California Public Utilities Commission, San Diego, California, is awarded $13,509,411 for firm-fixed-price task order N62473-19-F-4704 under the basic ordering agreement (BOA) N62473-18-G-5615 for energy conservation measures at Marine Corps Air Station, Miramar. The work to be performed provides for energy conservation and resiliency that includes light emitted diode retrofits, replacement of cooling towers and water source heat pumps, and installation of variable frequency drives. This project will utilize the installation's reclaimed water source to provide reliability, resource reduction, and lower costs. Work will be performed in San Diego, California, and is expected to be completed by December 2020. No funds will be obligated at the time of award. This project will utilize third party financing through the utility company in the amount of $13,509,411. The energy conservation project will be amortized for a term of 20 years with an annual rate of 3.123% and the payment will be included as a separate utility bill submitted annually based upon the amortization schedule for a grand total cost of $18,970,106.57. This task order falls under the terms and conditions of the BOA with SDG&E. The BOA allows for services without full and open competition pursuant to the statutory authorities of 10 U.S. Code 2304(c)(5) and 10 U.S. Code 2913. The Naval Facilities Engineering Command, Southwest, San Diego, California, is the contracting activity (N62473-18-G-5615).

International Business Machines Corp. (IBM), Yorktown, New York, is awarded a $12,000,000 cost-type contract to provide research and development of computational models that mimic core cognitive capabilities of children to include machines with the general-purpose common sense of an 18-month old to advance scientific “reverse-engineering” accounts of a child's mind. This is a four-year contract with no option periods. Work will be performed in Yorktown, New York, and work is expected to be completed July 17, 2023. Research, development, test and evaluation (Defense Advanced Research Projects Agency) funds in the amount of $2,042,919 will be obligated at the time of award. This contract was competitively procured via Broad Agency Announcement and publication on the Federal Business Opportunities website, with 42 proposals submitted and nine selected for award. Naval Information Warfare Center, Pacific, San Diego, California, is the contracting activity (N66001-19-C-4027).

Lockheed Martin Aculight Corp., Bothell, Washington, is awarded an $8,184,205 cost-plus-fixed-fee, cost-only modification to previously awarded contract N00024-18-C-5392 to exercise options for technical and field engineering services and a cost-only line item for travel in support of Surface Navy Laser Weapon System Increment 1, High Energy Laser and Integrated Optical-dazzler with Surveillance (HELIOS) system. Work will be performed in Bothell, Washington, and is expected to be complete by July 2020. Fiscal 2019 research, development, test and evaluation (Navy) funds in the amount of $249,882 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.

Alliance Steel Construction Inc.,* Superior, Wisconsin, is awarded a $7,600,000 firm-fixed-price contract to demolish the central heating plant, steam piping and steam pits at Marine Corps Base (MCB) Camp Lejeune, and Marine Corps Air Station (MCAS), New River. The work to be performed provides the complete demolition of building 1700, which is approximately 42,000 square feet at MCB, Camp Lejeune, and the demolition of steam piping, steam pits and the central steam plant at MCAS, New River. Work will be performed in Jacksonville, North Carolina, and is expected to be completed by October 2020. Fiscal 2019 operations and maintenance (Marine Corps) contract funds in the amount of $7,600,000 are obligated on this award and will expire at the end of the current fiscal year. This contract was competitively procured via the Navy Electronic Commerce Online website with three proposals received. The Naval Facilities Engineering Command, Mid-Atlantic, Norfolk, Virginia, is the contracting activity (N40085-19-C-8087).

DEFENSE LOGISTICS AGENCY

Point Blank Enterprises, Pompano Beach, Florida, has been awarded a $63,491,328 firm-fixed-price contract for medium size enhanced small arms protective inserts. This was a competitive acquisition with three responses received. This is a 15-month contract with no option periods. Location of performance is Florida, with a May 30, 2021, performance completion date. Using military services are Army and Air Force. Type of appropriation is fiscal 2019 defense working capital funds. The contracting activity is the Defense Logistics Agency, Troop Support, Philadelphia, Pennsylvania (SPE1C1-19-C-0010).

Leading Technology Composites, Wichita, Kansas, has been awarded a $41,888,000 firm-fixed-price contract for medium sized enhanced small arms protective inserts. This was a competitive acquisition with three responses received. This is a one-year contract with no option periods. Location of performance is Kansas, with an April 30, 2021, performance completion date. Using military services are Army and Air Force. Type of appropriation is fiscal 2019 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE1C1-19-C-0011).

Gossner Foods Inc.,** Logan, Utah, has been awarded a maximum $30,319,835 fixed-price with economic-price-adjustment contract for ultra-high temperature milk. This contract was a competitive acquisition with one response received. This is a five-year contract with no option periods. Location of performance is Utah, with a July 26, 2024, performance completion date. Using military services are Army and Marine Corps. Type of appropriation is fiscal 2019 through 2024 defense working capital funds. The contracting activity is the Defense Logistics Agency, Troop Support, Philadelphia, Pennsylvania (SPE3S1-19-D-Z210).

ARMY

Crowley Holdings LLC,* New Orleans, Louisiana, was awarded a $21,053,340 firm-fixed-price contract for shot rock to support the temporary repair of levees at Mill Creek and Big Tarkio in Missouri. Bids were solicited via the internet with three received. Work will be performed in Craig, Missouri, with an estimated completion date of Sept. 19, 2019. Fiscal 2019 civil flood control and coastal emergencies funds in the amount of $21,053,340 were obligated at the time of the award. U.S. Army Corps of Engineers, Kansas City, Missouri, is the contracting activity (W912DQ-19-C-1082).

Advanced Technology Systems Co. Inc.,* McLean, Virginia, was awarded a $17,896,404 firm-fixed-price contract for helicopter maintenance. Bids were solicited via the internet with nine received. Work will be performed in Fort Benning, Georgia, with an estimated completion date of June 27, 2024. Fiscal 2019 operations and maintenance, Army funds in the amount of $400,000 were obligated at the time of the award. U.S. Army Mission and Installation Contracting Command, Fort Benning, Georgia, is the contracting activity (W911SF-19-C-0019).

Buchanan & Edwards Inc., Arlington, Virginia, was awarded a $9,283,593 time-and-materials contract for data frameworks initiative information technology support. One bid was solicited with one bid received. Work will be performed in Fairfield, California, with an estimated completion date of July 17, 2020. Fiscal 2019 operations and maintenance, Army funds in the amount of $1,384,778 were obligated at the time of the award. U.S. Army Contracting Command, New Jersey, is the contracting activity (W15QKN-19-F-1264).

Northrop Grumman Systems Corp., McLean, Virginia, was awarded an $8,665,561 modification (P00002) to contract W91RUS-14-D-0002 for non-personal information technology support services for the U.S. Army Regional Cyber Center-Europe. Work will be performed in Wiesbaden-Erbenheim, Germany, with an estimated completion date of July 18, 2020. Fiscal 2019 operations and maintenance, Army funds in the amount of $5,837,950 were obligated at the time of the award. U.S. Army Contracting Command, Aberdeen Proving Ground, Maryland, is the contracting activity.

Great Lakes Dredge & Dock Co. LLC, Oak Brook, Illinois, was awarded a $7,689,500 firm-fixed-price contract for Cape May beach fill. Bids were solicited via the internet with four received. Work will be performed in Cape May, New Jersey, with an estimated completion date of Feb. 28, 2020. Fiscal 2019 civil construction funds in the amount of $7,689,500 were obligated at the time of the award. U.S. Army Corps of Engineers, Philadelphia, Pennsylvania, is the contracting activity (W912BU-19-C-0026).

InfoScitex Corp., Littleton, Massachusetts, was awarded a $7,011,545 cost-plus-fixed-fee contract to develop and demonstrate advanced teaming of manned and unmanned aviation assets to execute tactical missions with minimal human intervention, while operating as part of a combined arms team in a complex operating environment. Bids were solicited via the internet with 46 received. Work will be performed in Littleton, Massachusetts, with an estimated completion date of March 17, 2022. Fiscal 2019 research, development, test and evaluation funds in the amount of $1,545,576 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W911W6-19-C-0067).

*Small Business

**Small Woman-owned Business

https://dod.defense.gov/News/Contracts/Contract-View/Article/1909668/source/GovDelivery/

Sur le même sujet

  • USAF Errantly Reveals Research On ICBM-Range Hypersonic Glide Vehicle

    19 août 2020 | International, Terrestre

    USAF Errantly Reveals Research On ICBM-Range Hypersonic Glide Vehicle

    Steve Trimble The U.S. Air Force agency that manages the service's nuclear arsenal has started researching enabling technology for an intercontinental-range, hypersonic glide vehicle (HGV), according to a document that was published briefly in error on a public website. Although the document shows a U.S. nuclear weapons agency is researching HGV technology, senior Pentagon officials say there has been no change to a policy that “strictly” limits the emerging class of hypersonic gliders and cruise missiles to non-nuclear warheads. A request for information (RFI) published on Aug. 12 by the Air Force Nuclear Weapons Center asks companies to submit ideas across seven categories of potential upgrades for intercontinental ballistic missiles (ICBMs) designed with a “modular open architecture.” The Air Force often describes the future Ground Based Strategic Deterrent ICBM as featuring a “modular systems architecture,” in contrast with the aging Minuteman III, which does not. Among the seven items on the upgrade list, the Air Force called for a new “thermal protection system that can support [a] hypersonic glide to ICBM ranges,” according to the RFI, which is no longer publicly available on the government's procurement website. The RFI appears to have disclosed information that was not meant by the Air Force's nuclear weapons buyers to be made public. Each of the seven items listed in the RFI's “scope of effort” for ICBM upgrades included a prefix designation of “U/FOUO,” a military marking for information that is unclassified, but for official-use only. Although not technically a classified secret, information marked as “FOUO” usually is withheld from the public. The RFI was removed from beta.sam.gov on Aug. 17 after Aviation Week inquired about the document with the Air Force and the Office of the Secretary of Defense (OSD). The Defense Department (DOD) has three different operational prototypes for HGVs in development now: the Air Force's AGM-183A Air-Launched Rapid Response Weapon, the Army's Long Range Hypersonic Weapon and the Navy's Intermediate Range Conventional Prompt Strike. Once fired from an aircraft, ground-launcher or submarine, all three are designed to strike targets with conventional warheads at intermediate range, which is defined as 1,500-3,000 nm by the official DOD Dictionary of Military and Associated Terms. But the Pentagon has no acknowledged plan to develop an HGV with a range beyond 3,000 nm and maintains a policy that “strictly” prohibits arming any such weapon—regardless of range—with nuclear warheads. The two-most senior staffers leading the hypersonic weapons portfolio reiterated that policy during a press conference on March 2. “Our entire hypersonic portfolio is based on delivering conventional warheads,” said Mike White, assistant director of defense research and engineering for hypersonic weapons. “Right,” agreed Mark Lewis, the director of defense research and engineering for modernization programs. “Strictly conventional.” The Pentagon has not changed the policy since March 2, said Lt. Col. Robert Carver, a spokesman for Lewis' office. “DOD is not developing nuclear-capable hypersonic weapons,” Carver said in an email. “There are common technology needs between the nuclear enterprise and hypersonic systems. Particularly in the area of high-temperature materials, we typically collaborate on the development of advanced dual-use materials technology. I will reiterate that our entire hypersonic program portfolio continues to be based on delivering conventional effects only.” Although the DOD upholds the conventional-only policy for hypersonic gliders and scramjet-powered cruise missiles, the source of the RFI raises questions, said James Acton, co-director of the Nuclear Policy Program at the Carnegie Endowment for International Peace. “The fact that [this RFI] is coming from the nuclear weapons center, it makes it sound an awful lot like this would at least be nuclear-armed or conceivably dual-capable,” Acton said. Although the RFI confirms research is underway, the DOD still has no acknowledged plan to proceed from basic research into the acquisition phase of an ICBM-range hypersonic glider, whether carrying a conventional or nuclear warhead. If the thermal-protection system technology is limited to research only, the RFI by the Air Force's nuclear weapons organization may not violate the DOD policy, which may apply only to fielded weapons. “DOD does a lot of research on a lot of different things and the vast majority of these programs never turn into an acquisition,” Acton said. “It could turn into something, but sophisticated observers recognize that it may not.” The DOD's conventional-only policy for maneuvering hypersonic weapons stands apart from other countries in the field. Russia, for example, has deployed the nuclear-armed Avangard HGV on the SS-19 ICBM. In February, the head of U.S. Northern Command, Gen. Terrence O'Shaughnessy, said in written testimony submitted to Congress that “China is testing a [nuclear-armed] intercontinental-range hypersonic glide vehicle, which is designed to fly at high speeds and low altitudes, complicating our ability to provide precise warning.” The DOD never has had an announced weapons development program for a conventional- or nuclear-armed, intercontinental-range HGV, but has experimented with air-launched gliders. The Hypersonic Test Vehicle-2 program by the DARPA attempted to demonstrate a range of 4,170 nm, but each experimental glider in two tests staged in 2010 and 2011 failed about 9 min. into a planned 30-min. hypersonic glide. The leading edges of an intercontinental-range HGV could be exposed to temperatures as high as 7,000K (6,726C) on reentry, then endure a prolonged glide phase compared to an intermediate-range system, said Christopher Combs, who researches hypersonic aerodynamics as an assistant professor at the University of Texas-San Antonio. “The bottom line is it's just crazy temperatures,” Combs said. “They're still not dealing with space shuttle or Apollo [capsule] temperatures, but it's still really hot.” The rescinded RFI, meanwhile, also may provide a rare glimpse into the Air Force's plans for the new ICBM developed under the Ground Based Strategic Deterrent (GBSD) program. Apart from the thermal-protection system for a hypersonic glider, the scope of effort in the RFI sought industry input on a variety of topics, including: • Fusing data from lower-fidelity, onboard sensors to improve guidance, navigation and control. • New navigation aids to correct inertial measurement unit drift on long-time-of-flight missions. • A lighter, smaller and more efficient “future fuze,” which also could “accept inputs from external subsystems.” • Radiation-hardening techniques for advanced microelectronics, such as a system on a chip or system in a package. • Improved computer hardware and software, including artificial intelligence algorithms. • A more secure architecture and better security sensors for ICBM ground facilities. The Air Force plans to award the contract to Northrop Grumman by the end of the month to launch the engineering and manufacturing development contract for the GBSD program. Northrop remained the sole bidder for the program to deliver more than 600 new ICBMs to the Air Force after a Boeing-led team withdrew from the competition last year. https://aviationweek.com/defense-space/missile-defense-weapons/usaf-errantly-reveals-research-icbm-range-hypersonic-glide

  • Panel of three-star generals to lead military training modernization

    5 décembre 2022 | International, Aérospatial

    Panel of three-star generals to lead military training modernization

    “Gone are the days when we could hand-wave training away. Warfare is obviously way too complicated for that now,” said Caroline Baxter.

  • Roper Pushes Moving Project Maven To Air Force

    11 juin 2020 | International, Aérospatial, C4ISR, Sécurité

    Roper Pushes Moving Project Maven To Air Force

    Roper expects GBSD, B-21 and F-35 to migrate parts of their development to cloudONE as he pushes the Air Force to embrace advanced software practices. By THERESA HITCHENSon June 11, 2020 at 4:01 AM WASHINGTON: Air Force acquisition czar Will Roper says he is considering taking over DoD's artificial intelligence (AI) experiment, Project Maven, to make it operational while the service pushes its own AI capabilities into the field. “I was just speaking with USDI today about the potential of transitioning Maven over to the Air Force and making it an operational reality day-to-day,” Roper said. Project Maven begun in 2017, was designed to put machine-learning to work to sort through the masses of intelligence, surveillance and reconnaissance (ISR) data generated by DoD and Intelligence Community (IC) platforms. It has been a bit controversial, with Google pulling out of the effort in 2018; and the head of Air Combat Command head Gen. Mike Holmes saying he didn't believe it was ready for prime time. Roper explained that the Air Force was best positioned to take on Project Maven because of its progress in standing up capabilities under its Advanced Battle Management System (ABMS) family of systems, each dubbed with the prefix ONE. This includes the cloudONE for remote data storage, processing and access; platformONE for securely building software; the dataONE library; and the deviceONE that allows secure remote access to classified data. Via the ABMS effort, which is the Air Force's flagship for enabling Joint All Domain Command and Control, the Air Force has been able to build the “AI infrastructure” that allows an AI system to actually do analysis, Roper stressed. “That boring part, the AI infrastructure, is what has been critically absent in the Department, and we are finally doing it in the Air Force,” Roper said. “So cloudONE, platformONE, dataONE — this family of ONE systems — builds a tech stack that really is about getting data in proper custody so that analytics can be built on top of it and we can finally go do AI at scale.” The key, he said, is “data curation and custody, so that that data is discoverable by analytics algorithms that are able to assess its import to different missions, and then push it to the machine, without having to have people be inside the loop.” And that, of course, is what Project Maven focused on, the algorithms. Roper said the Air Force already has an “AI at scale operational today with the Distributed Common Ground System” as well as one being used for “predictive maintenance” that the service hopes have in use for 16 different assets within the next 18 months. The DCGS family of systems, an effort that began way back in 1998, is DoD's flagship capability for providing daily processing, exploitation and production of analysis from DoD to ISR platforms. Predictive maintenance is using AI to figure out what parts of a weapon system or platform are likely to break next, to ease and speed logistics planning. In both these instances, he explained, the environment is benign. That won't be so on the battlefield, where adversaries will be attempting to hack and spoof US AI systems — something that he says is all too easily done today. “It's harder than meets the eye to try to teach an algorithm to know that something is messing with them,” he said. “They inherently trust their data.” “I think there is this belief that that AI will just churn through it — throw enough data at it and everything will be okay — and that's not the case,” he elaborated. “We need another generation of this technology.” Thus, for the moment, the best solution is for humans and machines to work in tandem — as the Air Force is looking to do with the Skyborg project and the development of an AI co-pilot Roper has nicknamed R2D2. “We need to be pairing our AI with people,” Roper stressed. Still, Roper is enthusiastic about the progress made by the ABMS effort toward AI, including working with Northern Command on its response to COVID-19 — helping predict where pandemic hot spots might arise. “We're excited that we have that first taste of AI changing operations,” he enthused. “That AI flag has now been planted for the department. We have seen a future that only silicon was able to see; the human brain was not. If we can get that out onto the battlefield and use the ABMS event in September as our stepping stone, then what a wonderful step towards getting our department and our military away from thinking of itself primarily in terms of the platforms that produce data, and rather instead of the insights that are created by that data, many of them being created by AI,” he said. (The Air Force is planning the second “ABMS OnRamp,” to follow the debut field demonstration in December, for the first week of September. As Breaking D readers know, that second exercise will feature a scenario centered on Space Command operations.) Roper also waxed enthusiastic about the recent decision by the Joint Artificial Intelligence Center (JAIC) to move its development operations to cloudONE. They are not alone, he said. “I believe that portions of the Aegis Weapon System, and the F-18 are also using cloudONE for development,” he said. The Air Force has “put a ton of effort into getting it certified at the various security levels, classified to critical unclassified information,” he added. CloudONE now can be used with secret-level and Top Secret/Special Access Program (TS/SAP) level data, and Roper said that by the end of June it will be certified for use with Secret/Special Access Program level data. This makes it available to software developers across security levels, and opens the door for use by more Air Force weapons development programs, he explained. For example, Roper said that the Ground-Based Strategic Deterrent Program (GBSD) “will absolutely be using cloudONE and platformONE for its development.” And, he said, in talking with the F-35 program office he expects “they will do some portion of their development” using cloudONE. Further, he said the highly classified B-21 bomber program will be “moving in at the right point for them.” He noted that prime contractor Northrop Grumman has just demonstrated the use of Kubernetes — a software development technique that helps manage multiple “containerized applications” (i.e. with its own operating system) across multiple machines in a secure manner — on flight-ready hardware. Indeed, he noted, the B-21 program involves an initiative called DevStar that is trying to establish an autonomous testing capability. An Air Force spokesperson said in a statement that DevStar is “an Air Force initiative to use modern software development paradigms to rapidly deliver software to weapon systems while continually meeting safety, security, airworthiness and other compliance requirements that traditionally are performed in serial.” The Air Force website on the initiative shows it is trying to go beyond DevSecOps that seeks to build IT security into software upfront — to include super-high security and safety measures that will allow use in developing highly classified nuclear weapons-related systems. “And you're gonna keep seeing more of the Air Force move into this,” Roper said. “You will hear people use terms like Agile Development and DevOps and DevSecOps — they are not all the same. The tech stack underneath that is producing the software matters.” PlatformONE, he said, is one critical tool in producing software for the Air Force. “It is what is automating all those things that we have people doing today and people doing them in serial,” he said. And, he added, the use of platformONE and cloudONE in combination is “magic” that allows the sharing of software code across weapon systems development programs. “One of my ambitions for this year is to have code that's been written for, say, B-21 run on F-16 and vice versa, and not have any humans check it in between.” https://breakingdefense.com/2020/06/roper-pushes-moving-project-maven-to-air-force

Toutes les nouvelles