20 mars 2020 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

COVID-19 dampens European exercise, but US Army chief says all is not lost

By: Jen Judson

WASHINGTON — The new coronavirus pandemic may have dampened the U.S. Army's major division-level exercise in Europe, but the service's chief told Defense News in a March 18 interview that important lessons have already been learned.

Defender Europe was slated to be the third-largest military exercise on the continent since the Cold War and was meant to test the Army's ability to deliver a force from forts to ports in the United States and onward to ports in Europe, and from there to operational areas throughout Europe from Germany to Poland to the Baltic states and other Eastern European nations, Nordic countries and even Georgia.

The Army began to move troops and equipment into Europe beginning in January, with the meat of the exercise occurring in April and May this year.

But as COVID-19 has spread across the globe, with Europe designated as the newest epicenter of the virus, the Army decided last week that it would scale back Defender Europe, according to a statement from U.S. Army Europe.

“We have modified exercise Defender Europe 20 in size and scope,” a March 16 statement read. “As of March 13, all movement of personnel and equipment from the United States to Europe has ceased. The health, safety and readiness of our military, civilians and family members is our primary concern.”

The Army decided to cancel linked exercises that would have been a part of Defender Europe, which already happen on a regular basis in Europe, to include Dynamic Front, the Army Joint Warfighting Assessment, Saber Strike and Swift Response.

The service said it anticipates the armored brigade combat team already deployed to Europe will conduct gunnery and other combined training events with allies and partners as part of a modified exercise, and that forces already deployed to Europe for other “linked exercises” would come back to the U.S.

Also last week, U.S. Army Europe announced that its commander, Lt. Gen. Christopher Cavoli, and his staff were exposed to COVID-19 at a land force commanders conference in Wiesbaden, Germany, on March 6. Out of an abundance of caution, the service decided to quarantine those exposed. According to an Army spokesperson, the quarantine has no effect on operations, and the general and his staff continue to carry out duties from an isolated location.

Much was riding on Defender Europe when it comes to teaching the Army where it stands in terms of its ability to rapidly deploy a combat-credible force to Europe to support NATO and the U.S. National Defense Strategy. The exercise was also going to help the Army get more clarity on its Multi-Domain Operations concept as it morphs into official doctrine.

The service had also hoped to assess through the exercise whether its pre-positioned stock in Europe had the right equipment and was in the right place.

The Army made the difficult decision last week to reduce the size and scope of the exercise to “protect our troops,” Army Chief of Staff Gen. James McConville said.

The service had already deployed roughly 6,000 soldiers and 3,000 pieces of equipment from the U.S. beginning in January in support of the Defender Europe exercise, McConville said, and also deployed a brigade combat team and a division-sized headquarters.

The Army also has moved about 9,000 vehicles and pieces of equipment from Army pre-positioned stocks in Europe for the exercise, he noted.

“One of the big objectives of this exercise was what we call strategic readiness,” McConville said, “the ability to dynamically employ our forces from the United States, and we were able to demonstrate most of those capabilities. We were able to get our forces over there, we have a draw from the pre-positioned stocks and we're still able to train with our allies and partners, although at much less capability.”

Those units that won't be able to train through some of the linked exercises in Europe are already “tactically ready” and could maintain readiness through home station training, McConville added.

Lessons learned will directly feed into how the Army crafts its future doctrine and help validate that the service is ready to execute what is laid out in the National Defense Strategy.

But the other thing the Army has learned from the spread of COVID-19 and its effects on the exercise is that the service is agile, McConville stressed. “We had to adapt the plan, we were re-missioning some units during the actual deployments; some units may go other places, and that's why this was a very good exercise for us,” he added.

For those deployed for the exercise, McConville said that the Army has put in place a rigorous screening process for troops returning home when the exercise is complete, where they will be screened for infection before coming back and then screened again upon return to installations and posts, then quarantined as necessary.

While the Army has exercised strategic readiness, testing the ability to move seamlessly from country to country throughout the modified exercise may not get a full shake due to how European countries may choose to handle the pandemic. Border crossing was a challenge in past years. For now, there are too many uncertainties to know whether border crossing and mobility across countries will pose a problem or a challenge for the Army, according to McConville.

“Italy was a little ahead of us” in coping with the spread of the virus,” McConville said, “but Europe is probably right along the same lines where we are right now, where leaders are taking a hard look at how they want to try to contain this.”

Meanwhile in the Pacific region, where COVID-19 originated and where many countries have been hard hit, the Army was able to complete a recent exercise — Cobra Gold in Thailand, McConville said. The service continues to conduct risk assessment for each upcoming exercise in the theater.

The Army is also likely to stick to its plan to focus more largely on a division-sized exercise in the Pacific in 2021 and hold a smaller version of Defender Europe, rather than ramp up the European exercise back up to the intended size for 2020, McConville said. But there are still many unknowns, he added, and the Army will continue to assess its options.

https://www.defensenews.com/smr/army-modernization/2020/03/18/covid-19-dampens-european-exercise-but-army-chief-says-all-is-not-lost/

Sur le même sujet

  • Robots in the ranks: Army integrating robots in two platoons

    13 décembre 2023 | International, Terrestre, C4ISR

    Robots in the ranks: Army integrating robots in two platoons

    A platoon at Fort Moore, Georgia and another at the National Training Center, Fort Irwin, California, lead experiments.

  • Why DHS needs better mobile security than other agencies

    11 septembre 2018 | International, C4ISR

    Why DHS needs better mobile security than other agencies

    By: Justin Lynch As hackers become more sophisticated, the top IT officer at the Department of Homeland Security says he needs better mobile security features compared to other U.S. government agencies. The Department of Homeland Security “really operates differently than [the Department of Defense]. We are a very mobile organization, so my attack vectors are out there,” said John Zangardi during the Billington Cybersecurity summit Sept. 7. “We are out there on our mobile devices all day long, and that's not the case with DoD.” Zangardi would know. He previously served as the Pentagon's acting chief information officer from October 2016 to November 2017. In the 2017 Homeland Security industry guide, which lays out the department's investment opportunities, the agency said it was looking to secure communication systems and monitor cyberthreats in mobile devices. Homeland Security has also invested in research to ensure Android phones are secure and is planning to study end-to-end cellphone call encryption. Zangardi said the IT industry is going through an “inflection point” that is being driven by a faster rate of innovation, bolstered digital threats from nation-states and a greater demand for consumer expectations. Full article: https://www.fifthdomain.com/civilian/dhs/2018/09/10/why-dhs-needs-better-mobile-security-than-other-agencies

  • Contract Awards by US Department of Defense - May 1, 2019

    2 mai 2019 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité, Autre défense

    Contract Awards by US Department of Defense - May 1, 2019

    ARMY Callan Marine Ltd., Galveston, Texas (W912EP-19-D-0023); Cashman Dredging and Marine Contracting Co. LLC, Quincy, Massachusetts (W912EP-19-D-0024); Cavache Inc.,* Pompano Beach, Florida (W912EP-19-D-0025 ); Continental Heavy Civil Corp., Miami, Florida (W912EP-19-D-0026 ); Cottrell Contracting Inc.,* Chesapeake, Virginia (W912EP-19-D-0027); Great Lakes Dredge and Dock, Oak Brook, Illinois (W912EP-19-D-0028); J.T. Cleary Inc., Spring Valley, New York (W912EP-19-D-0029); Manson Construction Co., Seattle, Washington (W912EP-19-D-0030); Marinex Construction Inc., Charleston, South Carolina (W912EP-19-D-0031); Norfolk Dredging Co., Chesapeake, Virginia (W912EP-19-D-0032); Orion Marine Construction Inc., Tampa, Florida (W912EP-19-D-0033); Southern Dredging Co. Inc.,* Charleston, South Carolina (W912EP-19-D-0034); The Dutra Group, San Rafael, California (W912EP-19-D-0035); Waterfront Property Service LLC, doing business as Gator Dredging,* Clearwater, Florida (W912EP-19-D-0036 ); Weeks Marine Inc., Covington, Louisiana (W912EP-19-D-0037); Cavache Inc.,* Pompano Beach, Florida (W912EP-19-D-0038); CJW Construction Inc.,* Santa Ana, California (W912EP-19-D-0039); Coastal Dredging Co. Inc.,* Hammond, Louisiana (W912EP-19-D-0040); Cottrell Contracting Inc.,* Chesapeake, Virginia (W912EP-19-D-0041); Florida Dredge and Dock LLC,* Tarpon Springs, Florida (W912EP-19-D-0042); Southern Dredging Co. Inc.,* Charleston, South Carolina (W912EP-19-D-0043); Southwind Construction Corp.,* Evansville, Indiana (W912EP-19-D-0044); and Waterfront Property Service LLC, doing business as Gator Dredging,* Clearwater, Florida (W912EP-19-D-0045), will compete for each order of the $495,000,000 firm-fixed-price contract for dredging and shore protection projects. Bids were solicited via the internet with 24 received. Work locations and funding will be determined with each order, with an estimated completion date of April 30, 2024. U.S. Army Corps of Engineers, Jacksonville, Florida, is the contracting activity. HB&A LLC,* Colorado Springs, Colorado (W9128F-19-D-0004); Kenneth Hahn Architects Inc.,* Omaha, Nebraska (W9128F-19-D-0005); and Yeager Architecture Inc.,* Overland Park, Kansas (W9128F-19-D-0006), will compete for each order of the $30,000,000 firm-fixed-price contract for preparation of studies, analysis and design services. Bids were solicited via the internet with 22 received. Work locations and funding will be determined with each order, with an estimated completion date of April 30, 2024. U.S. Army Corps of Engineers, Omaha, Nebraska, is the contracting activity. PRIDE Industries, Roseville, California, was awarded a $20,122,695 modification (P00008) to contract W91247-18-C-0011 for repair and maintenance support. Work will be performed in Fort Polk, Louisiana, with an estimated completion date of May 31, 2023. Fiscal 2019 operations and maintenance, Army funds in the amount of $5,772,517 were obligated at the time of the award. U.S. Army Mission Installation Contracting Command, Fort Polk, Louisiana, is the contracting activity. A. WBE-CCI JV One LLC,* Itasca, Illinois, was awarded a $7,828,000 firm-fixed-price contract for the construction of a new Air National Guard Fire Crash Rescue Station. Bids were solicited via the internet with five received. Work will be performed in Peoria, Illinois, with an estimated completion date of Oct. 30, 2020. Fiscal 2019 military construction funds in the amount of $7,828,000 were obligated at the time of the award. U.S. Property and Fiscal Office Illinois is the contracting activity (W91SMC-19-C-6001). S.D.S Lumber Co.,* Bingen, Washington, was awarded a $7,757,620 modification (P00007) to contract W912EF-18-C-0010 for towboat services. Work will be performed in Walla Walla, Washington, with an estimated completion date of April 30, 2021. Fiscal 2019 operations and maintenance, Army funds in the amount of $3,638,716 were obligated at the time of the award. U.S. Army Corps of Engineers, Walla Walla, Washington, is the contracting activity. STG Inc.,* Reston, Virginia, was awarded a $7,645,240 firm-fixed-price contract for operational and technical engineering. Bids were solicited via the internet with three received. Work will be performed in Fort Huachuca, Arizona, with an estimated completion date of April 30, 2020. Fiscal 2019 operations and maintenance, Army funds in the amount of $7,645,240 were obligated at the time of the award. U.S. Army Contracting Command, Aberdeen Proving Ground, Maryland, is the contracting activity (W91RUS-19-F-0142). DEFENSE LOGISTICS AGENCY Beacon Point Associates LLC, Cape Coral, Florida, has been awarded a maximum $49,000,000 fixed-price with economic-price-adjustment, indefinite-delivery/indefinite-quantity contract for medical/surgical supplies. This was a competitive acquisition with 16 responses received. This is a five-year contract with no options. Location of performance is Florida, with a May 14, 2024, performance completion date. Using customers are Army, Navy, Air Force, Marine Corps and federal civilian agencies. Type of appropriation is fiscal 2019 through 2024 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE2DE-19-D-0005). Allied Tube and Conduit Corp., Harvey, Illinois, has been awarded a maximum $46,000,000 firm-fixed-price with economic-price-adjustment contract for barbed tape concertina wire. This is a competitive acquisition with two responses received. This is a two-year base contract with three one-year option periods. Locations of performance are Illinois and Ohio, with an April 30, 2022, performance completion date. Using military services are Army, Navy, Air Force and Marine Corps. Type of appropriation is fiscal 2019 through 2022 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE8E6-19-D-0002). American Medical Depot (AMD), Miramar, Florida, has been awarded a maximum $45,000,000 fixed-price with economic-price-adjustment, indefinite-delivery/indefinite-quantity contract for medical/surgical supplies. This was a competitive acquisition with 11 responses received. This is a five-year contract with no option periods. Location of performance is Florida, with a June 11, 2024, performance completion date. Using customers are Army, Navy, Air Force, Marine Corps and federal civilian agencies. Type of appropriation is fiscal 2019 through 2024 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE2DE-19-D-0009). Kandor Manufacturing Inc., Kandor, Puerto Rico, has been awarded a maximum $13,896,462 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for the Navy working uniform, Blouses/Trousers Type II and III, and maternity blouses. This was a competitive acquisition with five responses received. This is an 18-month base contract with three one-year option periods. Location of performance is Puerto Rico, with an Oct. 29, 2020, performance completion date. Using military service is Navy. Type of appropriation is fiscal 2019 through 2021 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE1C1-19-D-1163). (Awarded April 30, 2019) AIR FORCE Rockwell Collins Inc., Collins Aerospace – Mission Systems, Cedar Rapids, Iowa, has been awarded a $43,033,042 cost-plus-incentive-fee contract for Next Generation Application Specific Integrated Circuit Preliminary Design Review (PDR). This contract provides for the design, develop, and test of modernized Global Positioning System receivers that are intended for future military applications to the PDR level. Work will be performed in Cedar Rapids, Iowa, and is expected to be complete by April 2021. This award is the result of a sole-source acquisition. Fiscal 2019 research and development funds in the amount of $9,000,000 are being obligated at time of award. Space and Missile Systems Center, Los Angeles Air Force Base, California, is the contracting activity (FA8807-19-C-0003). International Business Machines Corp., Yorktown Heights, New York, has been awarded a $7,500,000 other transaction agreement for experimental purposes to provide an IBM Q access license. This agreement provides for remote access to the IBM Q System, a quantum computer with approximately 20 to 50 qubits. Work will be performed in Yorktown Heights, New York, and is expected to be complete by April 30, 2022. Fiscal 2019 research and development funds in the amount of $5,000,000 are being obligated at the time of award. Air Force Research Laboratory, Rome, New York, is the contracting activity (FA8750-19-9-0334). NAVY Systems Application and Technologies Inc., Largo, Maryland, is awarded a $14,583,586 cost-plus-fixed-fee contract to procure continued support services to the Air Vehicle Modification and Instrumentation (AVMI) Department and the Naval Air Systems Command (NAVAIR). Required services include support for the designing, developing, procuring, building, installing, testing and evaluating, calibrating, modifying, operating and maintaining instrumentation on aircraft and engines for the Navy and other government and commercial customers. Work will be performed at Patuxent River, Maryland (74 percent); China Lake, California (13.5 percent); and Point Mugu, California (12.5 percent), and is expected to be completed in November 2020. Working capital (Navy) funds in the amount of $8,000 will be obligated at time of award, none of which will expire at the end of the current fiscal year. This contract was competitively procured via the Federal Business Opportunities website, with four offers received. The Naval Air Warfare Center Aircraft Division, Patuxent River, Maryland, is the contracting activity (N00421-19-C-0023). *Small business https://dod.defense.gov/News/Contracts/Contract-View/Article/1831787/source/GovDelivery/

Toutes les nouvelles