13 février 2019 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité, Autre défense

Contract Awards by US Department of Defense - February 12, 2019

AIR FORCE

Tecolote Research Inc., El Segundo, California, has been awarded a $36,668,258 firm-fixed-price contract for Space and Missile Systems Center acquisition and financial support services. This contract provides the Remote Sensing Systems Directorate with a broad range of acquisition, strategic communication, and administrative capabilities to execute effective and responsive integrated program management of space-related research, development, production, sustainment, and lifecycle acquisition activities. Work will be performed in El Segundo, California, and is expected to be completed by Aug. 17, 2024. This award is the result of a competitive acquisition and six offers were received. Fiscal 2019 space procurement in the amount of $974,326; and research, development, test and evaluation funds in the amount of $5,137,759 are being obligated at the time of award. Space and Missile Systems Center Remote Sensing Systems Contracting Division, Los Angeles Air Force Base, California, is the contracting activity (FA8810-19-F-0002).

Lockheed Martin Corp., Fort Worth, Texas, has been awarded a not-to-exceed $19,900,000 indefinite-delivery/indefinite-quantity contract for Advanced Turbine Technologies for Affordable Mission-Capability (ATTAM) Phase I. The mission of the ATTAM Phase I program is to develop, demonstrate and transition advanced turbine propulsion power and thermal technologies that provides improvement in affordable mission capability. Work will be performed in Fort Worth, Texas, and is expected to be completed by Feb. 12, 2027. This award is the result of a competitive acquisition and 54 offers were received. The first task order will be initially funded with fiscal 2018 research, development, test and evaluation (RDT&E) funds in the amount of $45,000; and fiscal 2019 RDT&E funds in the amount of $315,000 at the time award. Air Force Research Laboratory, Wright-Patterson Air Force Base, Ohio, is the contracting activity (FA8650-19-D-2059).

AAR Manufacturing Inc., Cadillac, Michigan, has been awarded a $10,864,605 delivery order (FA8534-19-F-0023) to contract FA8519-14-D-0002 for the production of 463L cargo pallets. Work will be performed in Cadillac, Michigan, and is expected to be completed by Dec. 31, 2020. Fiscal 2017 other procurement funds in the amount of $6,345,157; and fiscal 2019 other procurement funds in the amount of $4,519,448 are being obligated at time of award. Total face value of the delivery order is $10,864,605. This delivery order brings the total cumulative face value of the contract to $181,551,615. Air Force Life Cycle Management Center, Robins Air Force Base, Georgia, is the contracting activity.

22nd Century Technologies Inc., Somerset, New Jersey, has been awarded a $8,344,625 firm-fixed-price contract to exercise Option III to support the 33rd Network Warfare Squadron (NWS) at Joint Base San Antonio, Texas, in conducting its mission of Defense Cyber Operations (DCO). The contractor will provide plans and implantation in executing the 33rd NWS managed DCO mission. Work will be performed on Joint Base San Antonio, Texas, and is expected to be completed Feb. 28, 2020. This contract is the result of a competitive acquisition and eight offers were received. Fiscal 2019 operations and maintenance funds in the amount of $8,344,625 will be obligated at the time of award. The 38th Cyberspace Engineering Installation Group, Tinker Air Force Base, Oklahoma, is the contracting activity (FA8773-15-C-0067).

ARMY

Tiber Creek Consulting Inc.,* Fairfax, Virginia, was awarded a $33,549,985 firm-fixed-price contract for mission essential core information system for operations and sustainment with periodic modernization life cycle phases. Bids were solicited via the internet with eight received. Work locations and funding will be determined with each order, with an estimated completion date of Feb. 7, 2024. U.S. Army Health Contracting Activity, San Antonio, Texas, is the contracting activity (W81K04-19-D-0007).

Osborn Consulting / MGE Engineering / Natural System,* Bellevue, Washington, was awarded a $10,000,000 firm-fixed-price contract for miscellaneous water resource civil works engineering, design, and engineering. Bids were solicited via the internet with three received. Work locations and funding will be determined with each order, with an estimated completion date of Feb. 10, 2021. U.S. Army Corps of Engineers, Seattle, Washington, is the contracting activity (W912DW-19-D-1011).

Fortis Nova A Joint Venture LLC,* Phoenix, Arizona, was awarded a $9,050,000 firm-fixed-price contract for construction of two new truck fill stands. Bids were solicited via the internet with one received. Work will be performed in Las Vegas, Nevada, with an estimated completion date of Nov. 3, 2020. Fiscal 2019 military construction funds in the amount of $9,050,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Los Angeles, California, is the contracting activity (W912PL-19-C-0006).

NAVY

Northrop Grumman Systems Corp., Rolling Meadows, Illinois, is awarded a $27,291,319 fixed-price indefinite-delivery/indefinite-quantity contract for integration, testing, delivery, and performance as the lead systems integrator for the AN/AAQ-24 Large Aircraft Infrared Countermeasures System and the ALQ-213 Electronic Warfare Management System. These services are in support of Lot 9 and 10 P-8A production aircraft for the Navy and various Foreign Military Sales (FMS) customers, including the governments of Australia and the U.K. Work will be performed in Rolling Meadows, Illinois, and is expected to be completed in February 2021. Fiscal 2018 aircraft procurement (Navy), and FMS funds in the amount of $11,751,506 are obligated at time of award, none of which will expire at the end of the fiscal year. This contract was not competitively procured pursuant to Federal Acquisition Regulation 6.302-1. The Naval Air Warfare Center Aircraft Division, Lakehurst, New Jersey, is the contracting activity (N68335-19-D-0023).

Northrop Grumman Systems Corp., St. Augustine, Florida, is awarded $16,883,718 for modification P00012 to a previously awarded firm-fixed-price, cost-plus-fixed-fee, cost-reimbursable indefinite-delivery/indefinite-quantity contract (N00019-14-D-0022). This contract modification extends the period of performance and provides depot maintenance for 44 Navy and Marine Corps Reserve F-5N/F aircraft. In addition to depot maintenance, this modification provides for aircraft inspections, repairs, overhauls, emergency repairs, modifications, engineering support and procurement of structural components required for the operation and sustainment of the F-5N/F aircraft. Work will be performed in St. Augustine, Florida (96 percent); Springville, Utah (3 percent); and Emmen, Switzerland (1 percent), and is expected to be completed in September 2019. No funds will be obligated at the time of award. Funds will be obligated on individual orders as they are issued. The Naval Air Warfare Systems Command, Patuxent River, Maryland, is the contracting activity.

Moran Towing Corp., New Canaan, Connecticut, is awarded a $14,350,538 firm-fixed-price contract with reimbursable elements to support PM4 service support program for the time charter services of eight tugboats. The tugboats will be capable of ship handling, docking and undocking in the Norfolk, Virginia, harbor and surrounding waters. The contract includes a 12-month base period, three 12-month option periods, and one 11-month option which, if exercised, would bring the cumulative value of this contract to $74,005,396. Work will be in Norfolk, Virginia, and surrounding waters, and is expected to be completed by February 2020. If all options are exercised, work will continue through Jan. 31, 2024. Fiscal 2019 operations and maintenance (Navy) funds in the amount of $8,371,147 will be obligated at time of award and will expire at the end of the current fiscal year. This contract was competitively procured via the Federal Business Opportunities website, with one offer received. The United States Navy's Military Sealift Command, Norfolk, Virginia, is the contracting activity (N3220519C3503).

Cardno-Amec Foster Wheeler Joint Venture, Charlottesville, Virginia, is awarded $8,440,405 for firm-fixed-price task order N6247319F4047 under an indefinite-delivery indefinite-quantity architect-engineering contract for building condition assessments at Marine Corps Base (MCB) Camp Pendleton, California; Marine Corps Air Station (MCAS) Camp Pendleton, California; Marine Corps Air Ground Combat Center Twentynine Palms, California; MCAS Miramar, California; Marine Corps Logistics Base Barstow, California; Marine Corps Recruit Depot San Diego, California; MCAS Yuma, Arizona, and MCB Camp Butler, Okinawa, Japan. Work will be performed in Oceanside, California (47 percent); Twentynine Palms, California (16 percent); Miramar, California (13 percent); Barstow, California (8 percent); San Diego, California (7 percent); Yuma, Arizona (7 percent); and Okinawa, Japan (1 percent), and is expected to be completed by February 2020. Fiscal 2019 operations and maintenance (Marine Corps) contract funds in the amount of $8,440,405 are obligated on this award and will expire at the end of the current fiscal year. One proposal was received for this task order. The Naval Facilities Engineering Command, Southwest, San Diego, California, is the contracting activity (N62473-16-D-1866).

U.S. SPECIAL OPERATIONS COMMAND

Raytheon Company Space and Airborne Systems, McKinney, Texas, was awarded a $15,000,000 modification (P00002) to an existing indefinite-delivery/indefinite-quantity contract (H92222-18-D-0003) with cost-plus-fixed-fee contract line items. This action increases the ceiling from $30,000,000 to $45,000,000 for Silent Knight Radar Operational Flight Program (OFP) development, field service representative support and engineering services in support of U.S. Special Operations Command (USSOCOM) fixed wing aircraft. This action completes OFP software delivery for the CV-22. Development work will continue to take place at the Raytheon facility in McKinney, Texas, and is expected to be complete by December 2021. Fiscal 2019 research, development, test and evaluation funds in the amount of $5,450,390 are being obligated at the time of award. USSOCOM Headquarters, Tampa, Florida, is the contacting activity.

DEFENSE INFORMATION SYSTEMS AGENCY

Artel, LLC, Herndon, Virginia, was awarded a firm-fixed-price contract modification (P00019) to exercise Option Period Four on task order GS-35F-5151H / HC101315F0009 for commercial satellite communications service. The face value of this action is $12,560,172 funded by fiscal 2019 operations and maintenance funds. The total cumulative face value of the task order is $71,314,976. Performance directly supports the U.S. Central Command Southwest Asia area of responsibility and Europe Communications Network Architecture and Contingency Support. Quotations were solicited via the General Services Administration's Federal Supply Schedule, Information Technology Schedule 70, and two quotations were received from 22 offers solicited. The period of performance for Option Period Four is Feb. 16, 2019, through Feb. 15, 2020, and there are no remaining option periods for this task order. The Defense Information Technology Organization, Scott Air Force Base, Illinois, is the contracting activity.

*Small Business

https://dod.defense.gov/News/Contracts/Contract-View/Article/1755709/

Sur le même sujet

  • Did the US Marine Corps give up on a big ship-based surveillance drone too soon?

    23 septembre 2020 | International, Aérospatial, Naval, Terrestre, C4ISR

    Did the US Marine Corps give up on a big ship-based surveillance drone too soon?

    David B. Larter WASHINGTON — The U.S. Navy and Marine Corps both say they need expanded surveillance capabilities for a potential fight with China, but the Marines have cut bait on a big, ship-based system that some analysts say would make a big difference for both services. The Chief of Naval Operations' air warfare lead said earlier this month that every carrier strike group commander needs more surveillance, and he wants to find a way to get more pure intelligence, surveillance and reconnaissance drones flying off the flight decks of Navy ships as soon as possible. That aligns with the Marine Corps' goals of having more ISR and network connectivity resident in the amphibious ready group/Marine expeditionary unit construct, as it is in the carrier strike group with the E-2D Advanced Hawkeye. But with the Marine Corps moving away from a large unmanned platform known as the “Marine Air-Ground Task Force (MAGTF) Unmanned Aerial System (UAS) Expeditionary,” it's unclear if the Navy and Marine Corps will be able to find common ground on the way forward. When asked if the Navy was moving toward more organic ISR on Navy flight decks, Air Warfare Director Rear Adm. Gregory Harris told the virtual audience at the annual Tailhook symposium that he was trying to find alignment with the Marine Corps' need for a medium-altitude, long endurance drone system. “Every strike group wants to know more and more and more about his battlespace,” Harris said. "As we look at future vertical lift and the Marine Corps looks at their MUX or Medium Altitude Long Endurance system, [we're talking] about how we can find synergy between the Marine Corps and the Navy's pieces of the MUX/MALE program and our future vertical life (unmanned portion) — we want to bring that as far left as we possibly can in terms of synergy between the Navy and Marine Corps. “But I promise you there is not a strike group commander or fleet commander that can get enough ISR out there. And that aspect, from a distributed maritime operations standpoint, what we can bring from the strike group whether it comes off a carrier, a DDG or the future frigate or comes off Triton, that is fantastic.” The Marines were examining a tilt-rotor drone that could take off from from a DDG or a big-deck amphibious ship, but Deputy Commandant of the Marine Corps for Aviation Lt. Gen. Steven Rudder told USNI News in March that the Marines couldn't get the kind of range and endurance they wanted from a tilt-rotor done while packing all the power and cooling it needed for high-end communications and early warning systems. “What we discovered with the MUX program is that it's going to require a family of systems. The initial requirement had a long list of very critical requirements, but when we did the analysis and tried to fit it inside one air vehicle,” they realized they had competing needs, Rudder told USNI. Analysts are divided on whether that's the right idea. Bryan McGrath, a retired destroyer skipper and consultant with The FerryBridge Group, said the Marines gave up too early on the concept, and that it works against the Marine's stated goal of becoming an arm of naval power. “The Marine Corps wishes to go forward fast, and that is a land-based, medium-altitude, long-endurance UAV solution,” McGrath said. “I think it's suboptimal. I think it is a blow to this whole concept of integrated American naval power.” Packing all that capability into a land-based system tethers the capability to basing rights agreements. But another consideration is that capability will be at the mercy of the theater commander, which means the Marines may get less use out of them than they anticipate. “I believe the Marines will find that those assets will be a lot more difficult to keep control of than they think they will be with respect to tasking once they are in theater.” McGrath said. "There will be customers for those ISR assets that will greatly exceed the tactical level of the requirement. “I think the Marines are making a mistake not working closely with the Navy to come up with an organic, ship-based MALE solution. All this does is push the horizon for such a necessary component of the ISR-T grid for the Western Pacific even further into the future. And all for a suboptimal, short-term approach to trying to solve its problems, and I think they are going to find that it will not solve their problems.” But the Marines are nothing if not aggressive, and Marine Corps Commandant Gen. David Berger has clearly prioritized speed in his quest to reshape the service. Dakota Wood, a retired Marine officer and analyst with The Heritage Foundation thinks that's the right approach. “I think they have to go separate paths,” Wood said when asked about the Marines' embrace of land-based air. "I think the more you combine multi-service efforts into a single program, it gets bogged down by all the competing requirements. “The expense goes up, the ability to deliver capability ends up being less than was originally hoped for. And then these competing, or even conflicting requirements clash and it mucks up the whole thing.” Breaking the MUX program into multiple systems has the advantage of spreading out capabilities, and relying on platforms already in production will speed everything along, Wood said. “I'm a huge advocate of prototyping and trying multiple paths, and that costs a bit of money to do that, but you end up with a variety of platforms, all with unique contributions to the overall capability set,” he said. “The Navy has a habit of loading on additional requirements. They look for very robust, long-lifespan capabilities. And of course, the expense and complexity go up. Manufacturing time goes up. There is a delay in getting a capability in the fleet. I like the Marine Corps' aggressive posture: There is a sense of urgency.” https://www.defensenews.com/naval/2020/09/21/did-the-us-marine-corps-give-up-on-a-big-ship-based-surveillance-drone-too-soon/

  • Finland to purchase more Patria 6x6 armoured vehicles

    6 janvier 2024 | International, Terrestre

    Finland to purchase more Patria 6x6 armoured vehicles

    The agreement also included a purchase option up to 70 vehicles of which the Finnish Defence Forces now redeems 40 vehicles.

  • US Navy's supply chain chief wants to transform dollars into readiness

    12 octobre 2021 | International, Naval

    US Navy's supply chain chief wants to transform dollars into readiness

    The U.S. Navy is trying to improve its readiness while reining in the rising costs of maintenance and modernization. While these goals can seem at odds, the service's first stab at this effort allowed it to boost its fighter jet mission-capable rates.

Toutes les nouvelles