18 octobre 2022 | Local, Autre défense

Canada's 'tenuous hold' in Arctic could be challenged by Russia, China, says top soldier | CBC News

Canada’s hold on the outer reaches of its Arctic territory is “tenuous” and will face significant challenges from both Russia and China in the future, the country’s top military commander warned a parliamentary committee on Tuesday.

https://www.cbc.ca/news/politics/wayne-eyre-arctic-russia-china-defence-1.6621040

Sur le même sujet

  • Canada’s defense minister: Our investment in defense is an investment in North American security

    11 janvier 2021 | Local, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Canada’s defense minister: Our investment in defense is an investment in North American security

    By: Harjit Sajjan For any military force, maintaining an advantage requires innovation and investment. It is why Canada is modernizing our Army, Navy and Air Force while putting our serving members in the Canadian Armed Forces at its core. To ensure our people have the most advanced capabilities and tools for the future, Canada is putting a greater focus on research and development, supporting innovators in industry and in government, and building a closer relationship between these two worlds. Since 2017, when we published our fully funded 20-year defense policy “Strong, Secure, Engaged,” we have seen significant changes in the global security environment. These new challenges underscore the need to invest in defense as a matter of national security and economic vitality. “Strong, Secure, Engaged” was released at a time when the dominant forces of the current security environment were just beginning to take shape. Today, Canada faces a world defined by great power conflict, rapid military modernization by states set on upending the international rules-based order, and advances against disruptive technologies in which North American geography no longer affords the protection it once did. While we have traditionally been able to address threats abroad before they reach our shores, our security requires reinforcement. While this new space has many unknowns, we know that multilateralism and supporting the rules-based international order is critical to our success and our safety. Since 2017, Canada has increased our support to NATO partners through Operation Reassurance — which has seen Royal Canadian Navy ships deployed in the Black Sea region, the Royal Canadian Air Force supporting air policing in Romania, and Canadian Armed Forces members leading the Enhanced Forward Presence Battlegroup in Latvia — as well as through our work leading NATO Mission Iraq and our support for the coalition. We also know that this changing security landscape means we need to take a thorough look at how we can secure North America against the threats of today and the future. It is why Canada continues to work with our American partners on the modernization of North American Aerospace Defense Command to build continental resiliency. This critical work will ensure that Canada and the United States of America have the ability to detect, deter and respond to threats, and that the only binational command in the world can meet the challenges of the 21st century. For many years now, the Department of National Defence has worked hard to keep defense industries informed of future investment opportunities that will continue generating jobs and improving Canada's capacity for innovation. It is one reason that we have a forward-looking, 10-year defense investment plan that is updated every three years. This engagement with industry has become an integral part of the procurement process, providing critical insights while showing industry that we are a predicable partner. Despite the unexpected challenges during 2020, Canada reached important milestones for key defense projects. In July 2020, the first Arctic and offshore patrol ship was delivered to the Royal Canadian Navy, followed in the fall by delivery of the first new fixed-wing search and rescue aircraft to the Royal Canadian Air Force. Construction of armored combat support vehicles for the Canadian Army began in May 2020, with the first vehicle delivered to the Armed Forces in December 2020. We also continue to invest hundreds of millions of dollars into equipping members of our armed forces. We now see unprecedented innovation in all corners of the world, which militaries can harness to quickly understand and respond to potential threats before they cause harm. It is why new and emerging technologies in cyber and artificial intelligence are becoming an integral part of defense projects. Canada is growing its defense industry by leveraging research and development from both industry and government to achieve the best results. By working together, we can come up with innovative solutions to increase Canada's operational effectiveness while showing that defense is forging a path to the future. In addition to embracing innovation within defense institutions and industry, more work is needed to support our people. The Canadian Armed Forces is a diverse institution, and our equipment needs to recognize that. It is why the Gender-based Analysis Plus process looks at factors such as gender, race, religion and ethnicity so that our defense projects better meet the needs of armed forces members. These changes help get the best out of our people, producing meaningful results. For example, changes made to the brake pedal assembly in the new armor-protected cab of the Standard Military Pattern vehicle ensure all soldiers, no matter their size, can safely operate these vehicles. By building an agile, well-educated, flexible, diverse, combat-ready military, we will be able to deal with threats abroad to protect stability at home. This historic investment through “Strong, Secure, Engaged” allows Canada to modernize our military by putting our people at its core as we continue to step up our contribution to North American and global security. When our partners and allies call upon Canada, we will be there for them. Harjit Sajjan is Canada's minister of national defense. https://www.defensenews.com/outlook/2021/01/11/canadas-defense-minister-our-investment-in-defense-is-an-investment-in-north-american-security/

  • $1 billion and counting: Inside Canada's troubled efforts to build new warships

    25 février 2020 | Local, Naval

    $1 billion and counting: Inside Canada's troubled efforts to build new warships

    Federal government tables figures showing what it's spent on the projects to date Murray Brewster The federal government has spent slightly more than $1.01 billion over the last seven years on design and preparatory contracts for the navy's new frigates and supply ships — and the projects still haven't bought anything that floats. The figures, tabled recently in Parliament, represent the first comprehensive snapshot of what has been spent thus far on the frequently-delayed project to build replacement warships. It's an enormous amount of money for two programs that have been operating for more than a decade with little to show for their efforts to date. It will be years before the Canadian Surface Combatant project — which aims to replace the navy's frontline frigates with 15 state-of-the-art vessels — and the Joint Support Ship program for two replenishment vessels actually deliver warships. The numbers and details for each advance contract were produced in the House of Commons in response to written questions from the Conservative opposition. The money was divided almost evenly between the federal government's two go-to shipyards: Irving Shipbuilding in Halifax, the prime contractor for the new frigates, and Seaspan of Vancouver, the builder of the supply ships. The breakdown raises critical questions about at least one of the programs, said a defence analyst, but it also shines a light on promises made by both Liberal and Conservative governments to keep spending under control for both of these projects — which could end up costing more than $64 billion. "I think there should be a level of concern [among the public] about whether or not what's being delivered in practice is what was advertised at the outset," said Dave Perry, a procurement expert and vice president of the Canadian Global Affairs Institute. A design still in flux Most of his concerns revolve around the new support ships, which the Liberal government says are in the process of being built now. The written responses, tabled in Parliament, note that the projected cost for the two supply ships — $3.4 billion — remains under review "as the design effort finalizes." Perry said he was astonished to learn that, "seven years and half-a-billion dollars into design work on an off-the-shelf design," the navy doesn't have the support ships, even though "the middle third of the ship is built" — and officials now say "the design effort isn't finished." Usually, he said, ships are designed before they're built. The head of the Department of National Defence's materiel branch said most of the preparatory contracts were needed to re-establish a Canadian shipbuilding industry that had been allowed to wither. 'A lot of patience' "I think we have to look at the totality of everything that's being accomplished under" the national shipbuilding strategy, said Troy Crosby, assistant deputy minister of materiel at DND. "Over that period of time, and with these expenditures, we've built a shipbuilding capability on two coasts, not just through National Defence but also through the coast guard, offshore fisheries science vessels. I understand it has taken a lot of patience, I suppose, and probably some uncertainty, but we're really getting to the point now where we can see delivering these capabilities to the navy." The largest cash outlays involve what's known as definition contracts, which went individually to both shipyards and were in excess of $330 million each. They're meant to cover the supervision of the projects and — more importantly — to help convert pre-existing warship designs purchased by the federal government to Canadian standards. The choices on each project were made at different times by different governments, but ministers serving both Liberal and Conservative governments decided that going with proven, off-the-shelf designs would be faster and less expensive than building from scratch. Now, after all the delays, it's still not clear that choosing off-the-shelf designs has saved any money. "I would be completely speculating on what it would cost to invest to develop the kind of expertise and capacity inside the government, inside National Defence and everybody involved, to be able to do something like that in-house," said Crosby. "The approach we've taken at this point, by basing both the Joint Support Ship and the Canadian Surface Combatant on pre-existing designs, allows us to retire a lot of risk in the way forward." When Crosby talks about "retiring risk," he's talking about the potential for further delays and cost overruns. Among the contracts, Irving Shipbuilding was given $136 million to support the drawing up of the design tender for the new frigates and to pay for the shipbuilding advice Irving was giving the federal government throughout the bidding process. Years ago, the federal government had enough in-house expertise to dispense with private sector guidance — but almost all of that expertise was lost over the past two decades as successive federal governments cut the defence and public works branches that would have done that work. The last time Canada built major warships was in the 1990s, when the current fleet of 12 patrol frigates was inaugurated. The federal government has chosen to base its new warships on the BAE Systems Type-26 design, which has been selected by the Royal Navy and the Royal Australian Navy. The hull and propulsion system on the new frigates will be "largely unchanged" from the British design, but the combat system will be different and uniquely Canadian, said Crosby. The project is still on track to start cutting steel for the new combat ships in 2023. Crosby said he would not speculate on when the navy will take delivery of the first one. Delivery of the joint support ships is expected to be staggered, with the first one due in 2024. There will be a two-year gap between ships, said Crosby, as the navy and the yard work through any technical issues arising with the first ship. If that timeline holds, the first support ship will arrive two decades after it was first proposed and announced by the Liberal government of former prime minister Paul Martin. https://www.cbc.ca/news/politics/frigates-joint-supply-ships-navy-procurement-canada-1.5474312

  • Irving Shipbuilding and Acadia University Announce Certificate in Maritime Security at CANSEC Canada's Global Defence and Security Trade Show

    2 juin 2022 | Local, Naval

    Irving Shipbuilding and Acadia University Announce Certificate in Maritime Security at CANSEC Canada's Global Defence and Security Trade Show

    Acadia University Acadia University OTTAWA, June 01, 2022 (GLOBE NEWSWIRE) -- Acadia University and Irving Shipbuilding Inc. (ISI), in partnership with the International Association of Maritime Security Professionals (IAMSP), are pleased to announce the creation of a new Professional Certificate in Maritime Security (PCMS) to be offered through Open Acadia starting in the fall of 2022. Announced at CANSEC, Canada's Global Defence and Security Trade show on June 1, the PCMS consists of two compon

Toutes les nouvelles