13 novembre 2023 | International, Aérospatial

Bombardier Defense Delivers Seventh Global Aircraft for Saab’s GlobalEye Airborne Surveillance Solution

The 7 aircraft delivered by Bombardier to the GlobalEye program highlight a successful collaboration and echo Bombardier’s thriving, long-standing reputation manufacturing specialized aircraft for the defense industry.

https://www.epicos.com/article/780615/bombardier-defense-delivers-seventh-global-aircraft-saabs-globaleye-airborne

Sur le même sujet

  • Airbus hopes its $6.5 billion German Eurofighter sale will shine for Switzerland, Finland

    13 novembre 2020 | International, Aérospatial

    Airbus hopes its $6.5 billion German Eurofighter sale will shine for Switzerland, Finland

    By: Sebastian Sprenger COLOGNE, Germany — Airbus is trying to make hay out of its $6.5 billion sale of 38 Eurofighter aircraft to Germany for other procurement competitions in Switzerland and Finland. The European defense giant inked a deal with the German Luftwaffe, or Air Force, this week after the country's parliament, the Bundestag, approved the budget earlier this month. The Luftwaffe stands to get 30 single-seater and eight twin-seater planes, Airbus said in a statement. Four of those aircraft will serve as test beds for future technology, as the company positions the Eurofighter as the bridge to the next-generation Future Combat Air System, a German-French-Spanish collaboration, according to the service. “The renewed order from Germany secures production until 2030 and comes at a strategically important time for the program,” the company statement read. “In addition to an expected Eurofighter order from Spain to replace its legacy F-18s, procurement decisions in Switzerland and Finland are imminent in 2021.” Switzerland wants to buy up to 40 aircraft for a maximum of $6.5 billion, and the Eurofighter is one of the aircraft in the running. Similarly, Finland is considering the plane as a replacement for its F-18 fleet. “The variant offered in Switzerland corresponds to the configuration of the German Quadriga order,” Airbus officials wrote in the statement, referring to the name of a new, fourth tranche of aircraft. The new batch, to be delivered by 2030, will replace the first tranche, bought between 2003 and 2008, which can only do air-to-air combat and boasts an obsolete radar, according to the German Defence Ministry. Voters in Switzerland approved a new air defense package in September, including a ground-based weapon system and a fleet of combat aircraft. A second offer from the four competing companies is expected this month. Besides the Eurofighter, Dassault's Rafale, Boeing's F-18 Super Hornet and Lockheed Martin's F-35 also are under consideration. The Finnish government over the summer upped the budget for its “HX” fighter program to $5.8 billion, eyeing a procurement decision in 2021. “The new Tranche 4 Eurofighter is currently the most modern European-built combat aircraft with a service life well beyond 2060,” Airbus Defence and Space CEO Dirk Hoke said in a statement following the contract signature with the German government. “Its technical capabilities will allow full integration into the European Future Combat Air System, FCAS.” https://www.defensenews.com/global/europe/2020/11/12/airbus-hopes-its-65-billion-german-eurofighter-sale-will-shine-for-switzerland-finland

  • B-21 Development Applying Tough Lessons From B-2

    22 août 2019 | International, Aérospatial

    B-21 Development Applying Tough Lessons From B-2

    By Lee Hudson PALMDALE, California— The U.S. Air Force is taking lessons learned from the plagued B-2 Spirit bomber development program and applying them to the next-generation B-21 Raider. While it is unknown when the B-2 will retire, the aging stealth bomber may end up flying alongside the B-21. The B-2 bomber flew its inaugural flight 30 years ago from the Plant 42 runway here. Today, the Northrop Grummansite is preparing for development of the Raider and two newly erected beige buildings have popped up, likely tied to the next-generation bomber. Although technical and acquisition problems inundated B-2 development, the classified B-21 is taking a different approach. Many details remain classified, but the company and service officials acknowledge the team is being run by the Rapid Capabilities Office instead of a traditional program office. B-21 development appears to be progressing; the Air Force's No. 2 officer—Air Force Vice Chief of Staff Gen. Stephen Wilson—has said first flight is slated for December 2021. But House Armed Services seapower and projection forces subcommittee Ranking Member Rep. Rob Wittman (R-Va.) alerted the public last year that there was a problem with the inlet design for the B-21's Pratt & Whitney-manufactured engines. Wittman says those issues were fully addressed and the program has made tremendous progress. “I've been pretty impressed by what both the Air Force and what Northrop Grumman have done in addressing these particular issues and I think we're on the right course,” he says. “Getting those things right to begin with and setting the tone and path I think is critically important.” An Air Force illustration issued in 2016 of the B-21 design suggests it may closely resemble the B-2. “The B-2 will be setting the path course for the B-21,” says Janis Pamiljans, aerospace systems sector president at Northrop Grumman. “What we've learned on B-2 are finding themselves baselined in the design for B-21 for supportability, sustainability, [and] mission capable rate.” The aging B-2s must be overhauled every nine years and are taken off the flight line for up to 12 months. Maintenance includes modifications and upgrades to antenna technology, avionics and software systems, costing U.S. taxpayers an average of $60 million for each aircraft, says Richard Sullivan, vice president and B-2 program manager at Northrop Grumman. Separately, the Air Force is funding the $3 billion B-2 Defensive Management System Modernization (DMS-M) program to enhance the aircraft's direct attack capability and upgrade its integrated air defense systems. The current DMS was designed in the 1980s and has not received any upgrades. “By leveraging ‘state-of-the-art' electronic warfare antennae, processors, controller and displays, B-2 aircrews will realize unprecedented situational battlespace awareness and dynamic, real-time threat avoidance in the most complex radio frequency emitter environments,” the Air Force says. “The inherent increased sensitivity of the modernized DMS over the legacy system, with increased processing power, will build a battlespace picture that could be shared with joint force platforms by onboard communication systems.” DMS-M is facing a possible eight-month delay as the service works with Northrop Grumman to implement an agile software development framework, Air Force acquisition executive Will Roper told lawmakers in March. Engineering and manufacturing development for the effort goes through July 2022, according to fiscal 2020 budget documents. Lawmakers acknowledge it is important that the nation's only operational stealth bomber remain relevant. But the House Armed Services Committee is concerned about DMS-M schedule delays, according to a report accompanying the lower chamber's mark of the fiscal 2020 defense policy bill. “Unless the B-2 DMS-M program makes significant changes, there may continue to be delays that will impact the success of the program,” the report says. The committee directs the Air Force to brief members on sufficient government software development expertise; contract definitization schedule; delivery schedule; determination of software baseline; and an assessment of related DMS-M-related program support. The Senate Armed Services Committee also is asking for answers regarding the U.S. bomber force. The upper chamber is requesting a brief on an updated bomber road map and plans for B-2 life cycle sustainment, among other items, according to a report accompanying the Senate's mark of the fiscal 2020 defense authorization bill. The upper chamber also would require details on Raider basing. To date, the service has been “real[ly] happy with the way Northrop has approached” the B-21 program, says Maj. Gen. James Dawkins, Eighth Air Force commander and overseer of the Joint-Global Strike Operations Center. The next-generation bomber completed a successful critical design review in December. “Everything I hear is that cost, schedule and performance is right on expectations,” Dawkins says. https://aviationweek.com/defense/b-21-development-applying-tough-lessons-b-2

  • Army heads into competitive flight demos for future tactical drone

    28 avril 2024 | International, Aérospatial

    Army heads into competitive flight demos for future tactical drone

    The Army has awarded contracts to two companies to continue on in a competition to provide a Future Tactical Unmanned Aircraft System.

Toutes les nouvelles