30 juillet 2024 | International, Aérospatial

Boeing’s KC-46 has a new top-tier deficiency

The latest Category 1 deficiency, discovered this spring, involves a faulty fuel pump.

https://www.defensenews.com/air/2024/07/30/boeings-kc-46-has-a-new-top-tier-deficiency/

Sur le même sujet

  • Can Army Futures Command Overcome Decades Of Dysfunction?

    28 août 2018 | International, Aérospatial, Terrestre

    Can Army Futures Command Overcome Decades Of Dysfunction?

    By SYDNEY J. FREEDBERG JR. ARMY S&T CONFERENCE: How broken is the procurement system the new Army Futures Command was created to fix? It's not just the billions wasted on cancelled weapons programs. It's also the months wasted because, until now, there has not been one commander who can crack feuding bureaucrats' heads together and make them stop bickering over, literally, inches. “I have not always been an Army Futures Command fan,” retired Lt. Gen. Tom Spoehr told the National Defense Industrial Association conference here. But as he thought about his own decades in Army acquisition, he's come around. How bad could things get? When he was working in the Army resourcing office (staff section G-8), Spoehr recalled, the Army signals school at Fort Gordon wanted a new radio test kit that could fit in a six-inch cargo pocket. The radio procurement programmanager, part of an entirely separate organization, reported back there was nothing on the market under eight inches. The requirements office insisted on sixinches, the acquisition office insisted they had no money to develop something smaller than the existing eight-inchers, and memos shot back and forth for months. At last, Spoehr warned both sides that if they didn't come to some agreement, he'd kill the funding. Suddenly Fort Gordon rewrote the requirement from “fit in a cargo pocket” to “cargo pouch” and the procurement people could go buy an eight-inch kit. That kind of disconnected dithering is what Army Futures Command is intended to prevent. “I had the money, but nobody really had control of all of this,” Spoehr said. As a result, he said, “we probably spent six months trading memos back and forth on the size of the radio frequency test kit.” Multiplying that by thousands of requirements over hundreds of systems, and the wasted time and money gets pretty bad. But what's often worse is when the requirements are unrealistic and no one pushes back. Most notoriously ,Chief of Staff Eric Shinseki demanded easily airlifted Future Combat Systems vehicles that weighed less than 20 tons but had the combat power of a 60-ton M1 Abrams tank. The designs eventually grew to 26 tons, and the performance requirements came down, but by then FCS had lost the confidence of both Congress and Defense Secretary Bob Gates, who canceled it in 2009. It was another casualty of overly ambitious requirements drawn up by staff officers in isolation from the people who'd actually have to build them. Army Futures Command is structured to force those two groups to talk to each other from the start. Full article: https://breakingdefense.com/2018/08/can-army-futures-command-overcome-decades-of-dysfunction

  • German government asks Lockheed, MBDA to rebid on missile defense system

    7 mai 2020 | International, Aérospatial

    German government asks Lockheed, MBDA to rebid on missile defense system

    By: Sebastian Sprenger COLOGNE, Germany — The German government has given Lockheed Martin and MBDA the go-ahead to bid anew on the TLVS air defense program. The latest request for a proposal, transmitted Wednesday, is the third iteration after previous attempts to draft a contract failed. If the vendor team decides to pursue the business, a new offer is expected by the summer. A Lockheed spokesman confirmed receipt of the solicitation but said the company could not comment further. The program, short for Taktisches Luftverteidigungssystem, is meant to wean Germany off the venerable Patriot air defense weapon. Formerly developed in concert with the United States and Italy, TLVS boasts a 360-degree sensing and shooting capability meant to lower its footprint in the field and allow for intercepts against threats from all directions. The Germans want a system that grants its military operators maximum national autonomy, meaning the government wants to own the rights to relevant software and hardware without having to consult with Washington to employ or modify the weapon. That requirement previously turned out to be a major headache in the negotiations with industry, especially relating to the Lockheed-made interceptor known as the Patriot Advanced Capability-3 Missile Segment Enhancement. It also remains to be seen how firmly Berlin sticks to its guns on the issue in the upcoming round of talks. News of movement in the prospective multibillion-dollar program comes as the German Defence Ministry announced another major acquisition decision last month that continues to make headlines. The government has proposed a split buy of Eurofighter and F-18 fighter jets to replace its Tornado fleet by 2030, prompting spirited debates among German lawmakers, industry advocates and analysts. https://www.defensenews.com/global/europe/2020/05/06/german-government-asks-lockheed-mbda-to-re-bid-on-missile-defense-system/

  • Contracts for June 14, 2021

    15 juin 2021 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contracts for June 14, 2021

    Today

Toutes les nouvelles