30 juillet 2024 | International, Aérospatial

Boeing’s KC-46 has a new top-tier deficiency

The latest Category 1 deficiency, discovered this spring, involves a faulty fuel pump.

https://www.defensenews.com/air/2024/07/30/boeings-kc-46-has-a-new-top-tier-deficiency/

Sur le même sujet

  • US Army discloses timelines for Block 3 Chinook

    2 août 2018 | International, Aérospatial

    US Army discloses timelines for Block 3 Chinook

    Gareth Jennings, London Boeing is to begin development of a Block 3-standard Boeing CH/MH-47 Chinook transport and assault helicopter toward the end of the 2020s, ahead of fielding by the US Army in the late 2030s/early 2040s. The timeline was disclosed by the army's MH-47G programme manager, Lieutenant Colonel Robert Klarenbach, in a briefing presented earlier in 2018 and seen by Jane'son 1 August. According to the briefing, Block 3 technology development for both the CH-47F and MH-47G will run from about 2027 to 2040, with production immediately following. With Boeing currently engaged in the early stages of the Block 2 upgrade for the US Army's Chinook fleet (the first of three prototypes is now in final assembly, ahead of the first low-rate initial production delivery in fiscal year 2023), in May 2017 the company first touted the notion of a Block 3 upgrade to take the Chinook out to the 2060s. No details as to what a Block 3 upgrade might include were released, but Boeing at that time noted it could feature the new Future Affordable Turbine Engine (FATE), which is being provisioned for inclusion in Block 2, as well as active parallel actuator systems and torque management systems. It could also see the Chinook become optionally-piloted. “[Optionally piloted] is not a huge technology challenge with the flights controls the Chinook has – it is more a tactics, techniques, and procedures [TTP] challenge,” said Randy Rotte, Boeing's director of cargo helicopter sales and marketing. “Unlike the [US Marine Corps'] K-MAX, which carried its cargo sling-loaded, someone would need to get inside [of the unmanned Chinook] to load and unload it.” While the US Army has yet to comment on what a Block 3 Chinook might entail, Col Klarenbach's briefing slides showed two possible configurations. Full article: https://www.janes.com/article/82113/us-army-discloses-timelines-for-block-3-chinook

  • Finland issues revised request for tenders for HX programme

    5 novembre 2019 | International, Aérospatial

    Finland issues revised request for tenders for HX programme

    The Finnish Ministry of Defence (MoD) has issued a revised call for tenders to five companies for the country's programme to replace its ageing fighter aircraft fleet. The MoD has issued a Revised Request for Quotation and the five companies have time to respond until 31 January 2020. The programme for the replacement of the Finnish Air Force's Boeing F-18 Hornet fighter jets is called HX. Contenders to replace the aircraft include Lockheed Martin F-35, Boeing F/A-18 Super Hornet, Eurofighter Typhoon, Dassault Rafale and Saab Gripen. The HX programme is crucial for Finland's defence capability as the current fighters will reach the end of their service life by 2030. The Finnish Government has capped the budget for the acquisition of the new aircraft at €10bn. In a statement, the MoD said: “Within the budget set for the project, the tenderers must prepare a performance package that meets the set requirements and includes not only the aircraft but also other technical systems, training systems, necessary maintenance equipment, test equipment and spare parts, along with weapons, sensors and other required type-specific support functions. “The package must also include the changes in management and information systems required for its integration into the defence system, as well as the construction of security-critical infrastructure.” Tendering phase for the HX programme started last year when the MoD issued an initial invitation to negotiate and a request for quotations. The government then started the first phase of the programme negotiations. The revised call for tenders provides contenders with an opportunity to gather the information and present a ‘clear, updated and improved package'. Following the second phase of negotiations, the MoD will release the request for the final offer next year. A final decision on the procurement of the replacement fighters is expected in 2021. https://www.airforce-technology.com/news/finland-revised-request-tenders-hx-fighter-programme/

  • BAE Systems awarded £2.4 billion munitions contract to equip UK Armed Forces

    2 décembre 2020 | International, Terrestre

    BAE Systems awarded £2.4 billion munitions contract to equip UK Armed Forces

    November 30, 2020 - BAE Systems has been awarded a new 15-year contract for the supply of munitions to the UK Ministry of Defence (MOD). The contract, worth £2.4bn, will sustain approximately 4,000 jobs across the UK. This new agreement, which will supersede the current contract due to conclude at the end of 2022, will guarantee the delivery of munitions products and engineering support to the UK Armed Forces. BAE Systems directly employs 1,260 people who are involved in either munitions manufacturing or test and evaluation at five sites across the UK; Glascoed in Monmouthshire, Radway Green in Cheshire, Washington in Tyne & Wear, Bishopton near Glasgow, and Ridsdale in Northumberland. It is anticipated that the contract will also help sustain a further 1,500 jobs in the UK supply chain and support a further 1,300 jobs induced by consumer spending in economies local to sites. The agreement enables BAE Systems to invest £70 million on the refurbishment and upgrade of manufacturing lines, with 75% of this value being invested by 2026. The Company will also spend up to £350m with UK-based companies on raw materials and machine components. Charles Woodburn, Chief Executive, BAE Systems, said: “This contract secures the future of a highly technical and critical industry which supports thousands of manufacturing jobs in several areas throughout the UK. By investing in new technology and skills to further develop our expertise, we can continue to deliver essential sovereign capability to the Armed Forces at competitive prices.” Defence Minister Jeremy Quin said: “This vital multi-billion pound contract will provide our service men and women with fire power on the front line for years to come whilst investing in British industry, British jobs and British infrastructure. Defence underpins hundreds of thousands of jobs across all four corners of the nation, and ongoing investment is crucial as we work together to build back better and stronger from the Covid-19 pandemic.” The contract, called the ‘Next Generation Munitions Solution' (NGMS), is due to commence in January 2023 and will succeed the current ‘Munitions Acquisition, the Supply Solution' (MASS) contract, which commenced in 2008. It represents the enduring partnership between BAE Systems and the UK Armed Forces, particularly the British Army. Contact Default Profile ImagePhilippa Mason Media Manager Head Office Corporate Communications +44 (0)7384 249518 View source version on BAE Systems: https://www.baesystems.com/en/article/bae-systems-awarded-gbp-2-4-billion-munitions-contract-to-equip-uk-armed-forces

Toutes les nouvelles