15 août 2018 | International, Terrestre

Athletic trainers and greener kitchens on the way as Corps caters to ‘combat athletes’

By:

The Corps plans to hire a slew of athletic trainers, and come October Marines will likely notice a new healthier food menu and layout at their respective chow halls.

It's all part of an effort by the Corps to reduce injuries across the force and cater to combat athletes in similar fashion to division one collegiate players.

The new chow facilities or “athletic kitchens” will boast healthier options with fresh fruit and vegetables up front. There will be a cold bar option with yogurt, granola and fresh fruit in the morning and a salad bar for lunch and dinner.

“As you go through the line it's going to be the green stuff,” Col. Stephen Armes, the director of the Force Fitness Division told Marine Corps Times in an interview. “All the healthy stuff is going to be up front.”

The new chow halls are going to resemble college athletic dining facilities with fresh greens and an assortment of healthy proteins, according to Armes.

But unhealthy food is not disappearing, the Corps just plans to make it harder for you to choose that option.

“Sometimes you just need a cheeseburger, there's nothing wrong with that,” Armes said. But, a Marine is “going to have to fight to get down to that cheeseburger.”

The Corps is also on the verge of hiring new athletic trainers separate from the nearly 600 Force Fitness Instructors already fielded across the Marines.

Full Article: https://www.marinecorpstimes.com/news/your-marine-corps/2018/08/14/athletic-trainers-and-greener-kitchens-on-the-way-as-corps-caters-to-combat-athletes/

Sur le même sujet

  • Contract Awards by US Department of Defense - July 22, 2020

    23 juillet 2020 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contract Awards by US Department of Defense - July 22, 2020

    AIR FORCE AECOM Management Services Inc., Germantown, Maryland (FA3002-20-D-0012); AKIMA Logistics Services LLC, Herndon, Virginia (FA3002-20-D-0013); DynCorp International LLC, Fort Worth, Texas (FA3002-20-D0010); Jacobs Technology Inc., Fort Walton Beach, Florida (FA3022-20-D-0014); Leidos Inc., Reston, Virginia (FA3002-20-D-0011); M1 Support Services LP, Denton, Texas (FA3002-20-D-0015); PAE Services LLC, Arlington, Virginia (FA3002-20-D-0016); and Vertex Aerospace LLC, Madison, Missouri (FA3002-20-D-0017), have been awarded a maximum $14,000,000,000 multiple-award, indefinite-delivery/indefinite-quantity (IDIQ) contract for Aircraft Maintenance Enterprise Solution -- a strategic sourcing vehicle for Air Force-wide contracted aircraft maintenance. The contractors will provide all organizational-level maintenance services for all aircraft listed in each individual task order performance work statement, which can include any aircraft platform (excluding rotary wing, tiltrotor and remotely piloted aircraft). Because this is an IDIQ, the location of performance is not known at this time and will be cited on individual task orders. Generally, work will be performed at government facilities and is expected to be completed Sept. 14, 2030. This award is the result of a competitive acquisition with 19 offers received. No funds are being obligated at the time of award. The Air Force Installation Contracting Center, Joint Base San Antonio-Randolph, Texas, is the contracting activity (FA3002-19-R-A001). DynCorp International LLC, Fort Worth, Texas, has been awarded a $17,760,615 modification (P00004) to contract FA3002-19-D-A004 to increase the ceiling for the firm-fixed-price, indefinite-delivery/indefinite-quantity contract for J85 engine maintenance. This contract provides for managing the full cycle of production by planning, scheduling, directing and controlling all maintenance on jet engines and support equipment, as well as monitoring serviceable base stock levels and target serviceable requirements of each customer. Work will be performed at Laughlin Air Force Base, Texas, and is expected to be completed Sept. 30, 2020. No funds are being obligated at the time of award. This award is the result of a sole-source acquisition. The Air Force Installation Contracting Center, Joint Base San Antonio-Randolph, Texas, is the contracting activity. Northrop Grumman Systems Corp., Herndon, Virginia, has been awarded a $16,284,463 cost-plus-award-fee undefinitized task order under the ground subsystems sustainment contract (FA8214-15-D-0001) for the Minuteman III general sustainment. Work will be performed in Layton, Utah, and is expected to be completed Aug. 31, 2021. Fiscal 2020 operations and maintenance funds in the amount of $8,142,232 are being obligated at the time of award of the base period. The Air Force Nuclear Weapons Center, Hill Air Force Base, Utah, is the contracting activity (FA8214-20-F-0082). Advantor IDS Inc., Orlando, Florida, has been awarded a $9,999,999 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for intrusion detection system (IDS) supplies and ancillary services. The contractor shall provide all supplies (hardware) and complete all installation of all IDS and test operations. Work will be performed at Edwards Air Force Base, California, and is expected to be completed July 16, 2025. This award is the result of sole-source acquisition. Fiscal 2020 research, development, test and evaluation funds in the amount of $237,456 are being obligated at the time of award. The Directorate of Contracting, Edwards AFB, California, is the contracting activity. CORRECTION: The contract announced on July 20, 2020, to BAE Systems Technology Solutions & Services Inc., Rockville, Maryland, for the Instrumentation Range Support Program, has not yet been awarded. CORRECTION: The contract announced on July 20, 2020, to six firms for design-build construction efforts at Fairchild Air Force Base, Washington, included an incorrect location for RORE Inc. (FA4620-20-0009). The firm is actually located in Gig Harbor, Washington. ARMY Lockheed Martin Corp., Orlando, Florida, was awarded a $702,881,910 modification (P00042) to contract W31P4Q-18-C-0130 for procurement of Hellfire missiles. Work locations and funding will be determined with each order, with an estimated completion date of Sept. 30, 2023. Fiscal 2010, 2011, 2018, 2019 and 2020 other procurement (Army) funds in the amount of $702,754,471 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. Southwest Valley Constructors, Albuquerque, New Mexico, was awarded a $24,577,981 modification (P00016) to contract W912PL-19-C-0015 to design and construct approximately 31.65 miles of three-phase power distribution, lighting, closed-circuit television camera, linear ground detection system and shelters for the Barrier Wall Project. Work will be performed in Lukeville, Arizona, with an estimated completion date of Sept. 7, 2021. Fiscal 2020 operations and maintenance (Army) funds in the amount of $24,577,981 were obligated at the time of the award. U.S. Army Corps of Engineers, Albuquerque, New Mexico, is the contracting activity. Agile Infrastructure Services LLC,* Pinehurst, Idaho, was awarded a $13,000,000 modification (P00010) to contract W9124C-15-D-0005 for construction, repair and maintenance of installation facilities on Fort Jackson, South Carolina. Bids were solicited via the internet with nine received. Work locations and funding will be determined with each order, with an estimated completion date of Dec. 17, 2020. U.S. Army 419th Contracting Support Brigade, Fort Jackson, South Carolina, is the contracting activity. (Awarded July 15, 2020) Joseph B. Fay Co., Pittsburgh, Pennsylvania, was awarded a $12,938,950 firm-fixed-price contract for the repair and rehabilitation of the gate hoist machinery and the performance of control-system upgrades at the Montgomery Locks and Dam. Bids were solicited via the internet with three received. Work will be performed in Monaca, Pennsylvania, with an estimated completion date of Oct. 10, 2022. Fiscal 2019 and 2020 civil operations and maintenance funds in the amount of $12,938,950 were obligated at the time of the award. U.S. Army Corps of Engineers, Pittsburgh, Pennsylvania, is the contracting activity (W911WN-20-C-8002). DEFENSE THREAT REDUCTION AGENCY L3 Applied Technologies Inc., a subsidiary of L3Harris Technologies Inc., San Leandro, California, will be awarded a $73,752,927 cost-plus-fixed-fee contract (with one firm-fixed-price line item for long lead time materials) for X-ray simulators for test and evaluation of nuclear survivability. Work will be performed at the contractor's location in San Leandro, California, and is expected to be completed by May 2025. This award is the result of a sole-source acquisition. Fiscal 2020 research, development, test and evaluation funds in the amount of $3,827,342 will be obligated at the time of award. The Defense Threat Reduction Agency, Fort Belvoir, Virginia, is the contracting activity (HDTRA1-20-C-0038). NAVY Crowley Government Services, Jacksonville, Florida, is awarded a $24,070,898 firm-fixed-price contract with reimbursable elements extension to continue the operation and maintenance of five T-AGOS ocean surveillance ships and two T-AGM missile range instrumentation ships. This extension includes one six-month base and two six-month option periods which, if exercised, will bring the cumulative value of this contract to $450,127,044. Work will be performed at sea worldwide. The following ships will be worked on: USNS Victorious T-AGOS 19; USNS Able T-AGOS 20; USNS Effective T-AGOS 21; USNS Loyal T-AGOS 22; USNS Impeccable T-AGOS 23; USNS Invincible T-AGM 24; and the USNS Howard T-AGM 25. Work is expected to be completed by January 2021. Navy working capital funds in the amount of $24,070,898 are obligated for fiscal 2020 and fiscal 2021 and will not expire at the end of the fiscal year. This contract extension was not competitively procured. The contract was prepared under the provisions of 10 U.S. Code §2304(c)(1), as implemented by Federal Acquisition Regulation 6.302-1(a)(2)(iii). There is only one responsible source and no other supplies or services will satisfy agency requirements. The Military Sealift Command, Norfolk, Virginia, is the contracting activity (N62387-15-C-2505). S&S Concrete Construction,* Leesburg, Georgia, is awarded a $10,000,000 maximum amount, indefinite-delivery/indefinite-quantity construction contract for asphalt paving and minor concrete work at Marine Corps Logistics Base, Albany, Georgia. No task orders are being issued at this time. The work will be performed in Albany, Georgia. The term of the contract is not to exceed 60 months and work is expected to be completed by September 2025. Fiscal 2020 operations and maintenance (Navy) (O&M, N) contract funds in the amount of $5,000 are obligated on this award and will expire at the end of the current fiscal year. Future task orders will be primarily funded by O&M, N. This contract was competitively procured via the Navy Electronic Commerce Online website and eight bids were received. The Naval Facilities Engineering Command Mid-Atlantic, Norfolk, Virginia, is the contracting activity (N40085-20-D-0101). National Steel and Shipbuilding Co., San Diego, California, is awarded a $10,000,000 cost-plus-fixed-fee modification to previously awarded contract N00024-18-C-4404 for USS Bonhomme Richard (LHD-6) emergency firefighting support, dewatering, safety and initial clean-up efforts. Work will be performed in San Diego, California, and is expected to be completed by November 2020. Fiscal 2020 operations and maintenance (Navy) funds in the amount of $7,700,000 was obligated at time of award and will expire at the end of the current fiscal year. The Naval Sea Systems Command, Southwest Regional Maintenance Center, San Diego, California, is the contracting activity. Lockheed Martin Rotary and Mission Systems, Moorestown, New Jersey, is awarded a $7,634,002 firm-fixed-price modification to previously awarded contract N00024-14-C-5106 for the production and delivery of AEGIS weapon system MK 6 MOD 1 spares for new construction and AEGIS modernization guided missile destroyers. Work will be performed in Clearwater, Florida (90%); and Moorestown, New Jersey (10%), and is expected to be completed by April 2022. Fiscal 2020 other procurement (Navy); and 2018 shipbuilding and conversion (Navy) funding in the amount of $7,634,002 will be obligated at the time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, D.C., is the contracting activity. Patriot Construction Co., Dunkirk, Maryland, is awarded a $7,173,707 firm-fixed-price contract for construction of training facilities at Marine Corps Base (MCB), Camp Lejeune, North Carolina. Work will be performed in Camp Lejeune, North Carolina. The work to be performed is for the construction of Special Operations Forces Human Performance Training Facilities, miscellaneous supporting structures, modifications to buildings RR-136 and RR-136A, utilities, parking, roadways and site work. The structures will be single-story steel frame buildings with brick veneer over metal studs, standing seam metal roofs, metal soffits, translucent wall panels and mezzanines. Special construction features include soil surcharge loads and storm water best management practices. Electrical systems include primary power distribution; lighting; energy monitoring/control systems; intrusion detection system; telephone/data and switch/server rooms; electrical switch gear; transformers; circuits; and fire alarms. Mechanical systems include plumbing; fire protection; compressed air; dehumidification; air conditioning systems; a chiller yard; and digital controls. Information systems include telephone, data, local area network, mass notification and intercom. Site work will include building utility systems; traffic control; parking; domestic water; fire protection water; sanitary sewer; sewage conveyance; propane gas networks; perimeter security fencing; gates; storm water; management; fiber/copper communications; cable television; and area lighting. Construction includes sustainable features complying with high performance sustainable building guiding principles. Work is expected to be completed by February 2022. Fiscal 2019 military construction (Navy) contract funds in the amount of $7,173,707 are obligated on this award and will not expire at the end of the current fiscal year. This contract was competitively procured via the Navy Electronic Commerce Online website and three proposals were received. The Naval Facilities Engineering Command, Mid-Atlantic, Norfolk, Virginia, is the contracting activity (N40085-20-C-0142). *Small Business https://www.defense.gov/Newsroom/Contracts/Contract/Article/2283344/source/GovDelivery/

  • Special Operators Predict AC-130J Will Be 'Most Requested' Aircraft

    14 mai 2018 | International, Aérospatial

    Special Operators Predict AC-130J Will Be 'Most Requested' Aircraft

    Military.com 9 May 2018 By Oriana Pawlyk HURLBURT FIELD, Fla. -- "That's the sound America makes when she's angry." That's how Col. Tom Palenske, commander of the 1st Special Operations Wing, characterized the AC-130 gunship after two aircraft fired hundreds of rounds from their 40mm and 105mm cannons and 25mm Gatling gun in the skies above A-77, a range specially made for target practice. Palenske, also the installation commander here, says crews can't wait for the next best thing: the AC-130J Ghostrider. "It's going to be awesome. It's our big gun truck. It's going to have more powerful engines, a more efficient fuel rate, and also has a more precise fuel capability so you know exactly how much gas you've got on board," he said. Palenske caught up with Military.com during a tour of Air Force Special Operations Command aircraft and a live-fire training exercise on ranges used by Hurlburt and neighboring Eglin Air Force Base as part of Air Force Secretary Heather Wilson's recent trip to AFSOC. "You can keep the sensors on the bad guys longer," Palenske said, referring to the J-model's ability to stay airborne longer due to better fuel management. Along with the 105mm cannon the U-models sport, the AC-130J will be equipped with a 30mm cannon "almost like a sniper rifle ... it's that precise, it can pretty much hit first shot, first kill," he said. "It's also going to have AGM-176 [Griffin] missiles on the back, so you can put 10 missiles on the back of them. And two of the tubes are reloadable, so those missiles, they're sitting in the tube backward so the tail's pointing out, [and] they eject out of the airplane, right-side themselves and shoot like a forward-fired missile," Palenske said. The J-model will have the ability to launch 250-pound small-diameter bombs (SDB), GPS- or laser-guided, he added. The aircraft is expected to carry AGM-114 Hellfire missiles, interchangeable with the SDBs on its wing pylons. The model achieved initial operational capability in September. The fourth-generation J is slated to replace the AC-130H/U/W models, with delivery of the final J- model sometime in 2021, according to the Air Force. The service plans to buy 32 of the aircraft. Crews here expect the J to be deployed in late 2019 or early 2020 and are optimistic about its progress. In January, the Pentagon's Office of the Director of Operational Test and Evaluation said fire control systems associated with the plane's left-hand-side 30mm GAU-23/A cannon had issues, including being knocked out of alignment when fired and needing to be re-centered repeatedly by an operator. The AC-130W Stinger II and J-model are the only variants of the gunship to use the Orbital ATK-made cannon. "That was drastically exaggerated," Palenske said in response to the problems cited in the report. Officials said some of the issues were already being fixed by the time the report was made public. Now, "all of the gun actuating systems are electric as opposed to hydraulic. Hydraulic's sloppy," Palenske said, referring to the gun mounts that previously used hydraulics to aim the weapons. "And remember, we're just bringing this thing online. You can't expect to slap this thing together ... and have that thing come out perfect," he said. "From soup to nuts, it's all run by computers and computer programs. But it's going to [be] the most lethal, with the most loiter time, probably the most requested weapons system from ground forces in the history of warfare. That's my prediction," Palenske said. There are two electro-optical/infrared sensor/laser designator pods on the gunship, a significant upgrade from the U-model. The U-model "has an older Raytheon ALQ-39 and a L3/Wescam MX-15," Lt. Col. Pete Hughes, an AFSOC spokesman, said in a follow-up email. The J-model has two L3/Wescam MX-20 electro-optical/infrared sensor/laser designator pods. "The upgraded sensors provide greater resolution at longer distances," he said. The new sensors can zoom in well enough to identify a shoe on the ground and will be able to share information with fifth-generation aircraft such as the F-35 Joint Strike Fighter, officials said. In the future, AC-130 crews also hope to incorporate a high-energy laser aboard the gunship. Palenske said the laser will be the ultimate ace in the hole, making disabling other weapons systems easier. "If you're flying along and your mission is to disable an airplane or a car, like when we took down Noriega back in the day, now as opposed to sending a Navy SEAL team to go disable [aircraft] on the ground, you make a pass over that thing with an airborne laser, and burn a hole through its engine," he said. Palenske was referring to Operation Nifty Package to capture and remove Panamanian leader Manuel Noriega from power in 1989, during which a SEAL team "disable[d] his aircraft so he couldn't escape." With a laser, "it's just like that. And you just keep going on, and there's no noise, no fuss, nobody knows it happened. They don't know the thing's broken until they go and try to fire it up," he said. The transition to the J-model will happen simultaneously in the AC gunship community and the MC-130 Combat Talon special mission community, as older C-130 models are divested "in an elegant ballet" to make sure commandos and ground forces are covered, Palenske said. The Air Force is procuring more MC-130J models -- used for clandestine missions; low-level air refueling for helicopter and tiltrotor aircraft; and infiltration, exfiltration, and resupply of special operations forces -- but is still using H-models in deployed locations. Palenske said having a standard aircraft in not only the gunship community but also the MC community will be less of a strain on maintainers. "Imagine the efficiency in the parts supply [for] the maintainers. You can keep less people in harm's way because the people that are going to maintain the systems on [both of] those, they can do it," he said. https://www.military.com/dodbuzz/2018/05/09/special-operators-predict-ac-130j-will-be-most-requested-aircraft.html

  • Army Rebuilds Artillery Arm For Large-Scale War

    28 avril 2020 | International, Aérospatial, Naval, Terrestre, C4ISR

    Army Rebuilds Artillery Arm For Large-Scale War

    The service's new AimPoint plan builds very different forces for Europe and the Pacific – but new high-level artillery HQs are central to both. By SYDNEY J. FREEDBERG JR WASHINGTON: Call it the once and future king of battle. The Army's artillery branch, neglected over 20 years of hunting guerrillas, is being revived as the long-range striking arm for multi-domain warfare against Russia and China. That will affect everything from what missiles the service buys, to which officers get promoted, to how the service organizes itself for battle – a force structure outlined in a new Army Futures Command study called AimPoint. The biggest change? Having already created two experimental Multi-Domain Task Forces built around artillery brigades, the Army now plans to build new high-level headquarters called Theater Fires Commands to coordinate long-range missile warfare on a continent-wide scale. “That is a direct output of AimPoint,” said Lt. Gen. Eric Wesley, whose Futures & Concepts Center developed the force structure plan. While the Theater Fires Commands do not exist yet, he said, the service has already begun setting aside manpower in its Total Army Analysis process to staff them. In AimPoint's vision of the future, “the brigades largely look very similar to what you might see right now... except for your [increased] ability to connect to national assets” in space and cyberspace, Lt. Gen. Wesley told reporters last week in a wide-ranging discussion. (Read more here). The big changes, he said, will come at higher levels – division, corps, and theater command – that have largely played a supporting role in highly localized counterinsurgency operations, but which must take the lead in coordinating large-scale campaigns against well-armed nation-states. “If you look at echelons above brigade, what we're having to do is build out our capacity to fight large-scale, campaign-quality combat,” he said. “Those echelons we have mortgaged a bit in the last 20 or 30 years because our BCTs [Brigade Combat Teams] were so powerful relative to our opponent. [Today], because we are being contested in all domains and our two peer competitors are investing in their militaries, we have to build back some of that campaign quality at echelon, with the distinction being you've got to have information warfare, you've got to have cyber, you've got to have space access.” Once the shooting starts, however – and even before, when you're trying to deter the other side from shooting at all – you still need old-fashioned firepower, with a 21st century twist. Artillery has been a US Army strength since World War II, when its ability to quickly coordinate far-flung howitzer batteries to pour overwhelming fire on a chosen target was one of the few things the German Wehrmacht feared. But back then, and even throughout the Cold War, the limits of radio networks, artillery range and precision targeting meant artillery could only be decisive on the tactical level, supporting the face-to-face battle of infantry and tanks. Today, however, the precision-guided missiles that the US, Russia, and China are developing have such long ranges – hundreds or thousands of miles – that you need satellites to spot suitable targets and send back targeting data, plus superior cyber warriors to protect that communications network from hostile hackers. Bringing all those technologies together in the right organization with well-trained personnel, and artillery can make a decisive impact on theater-wide operations or even the strategic level. Dead Branch Resurrecting? But there's a problem. Over the three decades between the end of the Cold War and the reawakening to Russian and Chinese threats, the Army neglected its artillery branch. In 2002, the Army actually disbanded the artillery brigades in its divisions and dispersed their component battalions across its armor and infantry brigades. Then, in Afghanistan and Iraq, US firepower was so overwhelmingly superior, and air support was so readily available for even small patrols, that artillery troops rarely got to fire their guns, even in training, and were routinely retasked for other duties. By 2008, three artillery colonels co-wrote a paper that called their arm of service a “dead branch walking.” Meanwhile, Russian and Chinese howitzers, rocket launchers and surface-to-surface missiles came to not only outnumber but also outperform their aging US counterparts. That led Lt. Gen. Wesley's predecessor as the Army's chief futurist, Lt. Gen. H.R. McMaster, to tell Congress in 2016 that “we are outranged and outgunned.” The next year, in October 2017, the Army officially made Long-Range Precision Fires its No. 1 modernization priority. Now the Army is urgently developed new artillery systems, from rocket-boosted, precision-guided howitzer shells with a range of 40 miles, to 300-plus-mile tactical missiles, to hypersonic weapons that can fly thousands of miles at more than Mach 10. But technology alone is not enough. After two decades of its soldiers rarely getting to use artillery, the Army now needs experienced gunners to run its new high-level Fires Commands and make the most of its new long-range missiles. Sure, infantry and tank brigade commanders can call in strikes on the targets they see in front of them in a tactical fight. But it takes senior artillery officers and experienced, specialist staff to choose the most critical targets for an entire theater of war and to coordinate long-range strikes over hundreds of miles. While the Army recreated division-level artillery headquarters in 2014, it is now studying long-range fires commands at the corps and theater levels. What's more, the different theaters will require a different mix, not only of artillery systems, but of all the supporting players being developed as part of the Army's “Big Six”: Long-Range Precision Fires, Next Generation Combat Vehicles, Future Vertical Lift, Networks, , Air & Missile Defense (also an artillery branch mission), and Soldier Lethality gear. For Indo-Pacific Command, focused on the Chinese threat, the vast expanse of ocean means the Army must support the Navy. That means long-range artillery batteries – very long range, given the distances involved – based on friendly islands to control the surrounding sea lanes, forming unsinkable anvils for the Navy's highly mobile hammer. But, Wesley said, that also requires advanced air and missile defense systems to blunt the enemy's own long-range salvos, long-range high-speed aircraft to move ground forces from island to island and a sophisticated, secure network to coordinate it all. In Europe, by contrast, the distances are shorter – requiring a different mix of missiles – and ground combat is the central front, with small and largely landlocked seas on either flank. That makes armored ground vehicles and soldier gear, from new rifles to targeting goggles, much more important than in the Pacific. Those profound differences mean the Army cannot create a single universal unit with one set of equipment that can adapt to every situation, as the cancelled Future Combat Systems program once attempted. Even if a one-size-fits-all Army somehow made sense tactically, Wesley said, it wouldn't work out technologically. With rapid advances in computing affecting everything from targeting to logistics, there's no way to develop a new piece of equipment, mass-produce it and issue it to every brigade across the Army before something new and better comes along. Instead of “pure fleets” where every brigade has the same software, trucks, missiles, etc., organized in the same way, the Army must tailor its forces to the theater. For more from Lt. Gen. Wesley in his own words (edited for brevity and clarity), read on: Q: Historically, the Army has always wanted to standardize equipment, training, and organization as much as possible – after all, “G.I.” stands for “General Issue.” But Europe and the Pacific are very different. Do you need more of a mix of forces across the Army? A: The world and technology are moving too fast to believe I'm going to get Technology One in every single brigade [before Technology Two makes it obsolete]. We have to be more agile than that. Pure fleeting and even pure structuring is probably not an acceptable approach. Second, the reality is there are two pacing threats that we're looking at, and they're distinctly different, the geography is different, and so we have to consider different ways to approach those problems. You can expect that the force package we build for INDOPACOM will be distinct from the force package we build in Europe. Where there's commonality is in Multi-Domain Operations. MDO is a way of fighting, and I think you're going to see that way of fighting be consistent in both theaters, but the application of it will be different. What are those distinctions? In INDOPACOM, fires to help the Navy control sea lanes are indispensable. In Europe, the essence of the problem is the ability to conduct a very advanced ground maneuver effort. Those [Big Six] priorities that we identified are pretty consistent with what most of the data and analytics and the rigor of the experimentation we look at – those priorities are priorities for a reason. But if you look at the theaters, those priorities might look a little different. So in INDOPACOM, fires, air and missile defense, and the network are some of the really critical pieces, and Future Vertical Lift, I would argue. If you look to Europe, it's going to be long range fires, the network, next generation combat vehicles, and soldier lethality. Q: How are you designing that future force? A: Gen. Milley [the 39th Army Chief of Staff, from 2015 to 2019], asked us, in a perfect world, what that force looks like. [He] asked us to build a resource-unconstrained design that reflects the precepts and principles of multi-domain operations. That was affectionately called the White Board Force. CSA 40 [the new Chief of Staff, Gen. James McConville] and Gen. Murray, the AFC commander, asked us to do a resource-informed design. That's what is called the AimPoint. It tightens the shot group and it allows us to define our experimentation, analysis, and programming better. When you're resource-unconstrained, you can go out and buy a Maserati. When you're resource-informed, you might buy a Corvette. We just had to throttle back on some of the ambitious desires we were looking for. We're on a [trajectory] to 492,000 [active duty soldiers]: How would you organize that in order to achieve MDO? AimPoint is not a locked down design that everybody has to invest in and build towards now. It's really an architect's design, and now we have to get into the detailed engineering and blueprint of it. We need an enhanced posture forward in both INDOPACOM and in Europe – nothing like the 1980s, but larger than what we have now. That's obviously going to be informed by resource decisions, but already the Army [is reactivating] an additional corps headquarters with an operational command post forward [in Europe]. Q: How will the AimPoint Army be organized differently to fight? A: The brigades largely look very similar to what you might see right now, because you still have to shoot, move, and communicate. BCT [Brigade Combat Team] and below, what you see won't change a lot — except for your ability to connect to national assets. Why is that? Well, we're fighting multi-domain, which means access to cyber, access to space assets, in certain instances at the tactical level. You have to have the plugs to get connect to national assets. If you look at echelons above brigade, what we're having to do is build out our capacity to fight large-scale, campaign-quality combat. Those echelons we have mortgaged a bit in the last 20 or 30 years because our BCTs were so powerful relative to our opponent. [Today], because we are being contested in all domains and our two peer competitors are investing in their militaries, we have to build back some of that campaign quality at echelon, with the distinction being you've got to have information warfare, you've got to have cyber, you've got to have space access. So in each echelon you would have that capacity to fight all domains and integrate them. Each echelon has distinct problems that has to be solved in order to enable the force to get to a position of advantage. Sometimes that requires each echelon to have distinct capabilities. Competition [short of war] is the first joint problem that has to be solved. Frankly, a brigade commander cannot provide the resources, the solutions, and the decisions made, to compete with a peer competitor. That's got to be retained at the three- and four- star level. In the event of conflict, it requires long range fire to strike the Russian combined arms army or Chinese equivalent. Again, that BCT commander would not necessarily have either the assets or the authority to strike the targets we're talking about with long range fire. So you have to do that at a different echelon. There are problems that the BCT commander does not solve for the theater, and some of that needs to be done at echelon. Q: What kinds of higher-echelon capabilities from the Cold War era are being recreated, like corps level artillery formations? A: Building out the ability to integrate fires at echelon is really important to being able to fight at scale. When we went to modularity, with the BCT being the coin of the realm, we moved the artillery fires battalion [out of the division-level artillery brigade] into the BCT. Now what you're going to see is the need to return to some aspects of centralization of fires, with the ability to decentralize [as needed], which makes the problem even harder. So, how have we done that? Well, for example, you saw a couple of years ago that we went back into the [division-level] fires brigade. That might be further reinforced as we go forward. Then the theater fires command, as an example, that is a direct output of AimPoint. In the last TAA [Total Army Analysis] cycle, we started to [set aside] a wedge of structure that we can design against. So that does not exist [yet]. Q: What are you able to do in the near term? You already have one experimental Multi-Domain Task Force in the Pacific and another being stood up in Europe. A: We've got AimPoint, we've got this orientation to the future, but General McConville said, ‘hey, I want to get stuff out there now, because the customer needs it, and that is the capacity to penetrate with long range fires, with the ability to integrate all domains.' That is what a MDTF is, and we're building them right now, and we want to get them into each theater. As we deploy those, we're going to learn lessons on how they best connect with the joint force. You may see, for example, an MDTF subordinate to a theater fires command or subordinate to a corps fires element. Right now, they're individual [units] that are being built; we will experiment with them and learn how they plug in, but ultimately you're going to see that capability migrate to the [higher] echelons. Topics: army, Army AimPoint, army future, Army Futures Command, Army strategic fires, artillery, Big Six, China, europe, Gen. Eric Wesley, INDOPACOM, Long-Range Precision Fires, LRPF, Missiles, Pacific, Russia, strategy, Theater Fires Command https://breakingdefense.com/2020/04/army-rebuilds-artillery-arm-for-large-scale-war/

Toutes les nouvelles