24 février 2024 | Local, Terrestre

ANALYSIS | Ravaged by war, Russia's army is rebuilding with surprising speed | CBC News

Russia's military has suffered enormous losses in the two years since it invaded Ukraine. Multiple experts and top military commanders are warning that Moscow is finding innovative ways to rebuild, despite sanctions. It's an effort that could tip the balance on the battlefield in Ukraine and throughout Europe.

https://www.cbc.ca/news/politics/russia-army-ukraine-war-1.7122808

Sur le même sujet

  • The Canadian Space Agency Announces the FAST 2019 Opportunity

    6 août 2019 | Local, Aérospatial

    The Canadian Space Agency Announces the FAST 2019 Opportunity

    CSA FAST Program. Credit: Canadian Space Agency. Facebook Twitter Stumbleupon LinkedIn Today the Canadian Space Agency announced the Flights and Fieldwork for the Advancement of Science and Technology (FAST) 2019 opportunity. According to the Canadian Space Agency the FAST program supports “research projects of Canadian universities and post-secondary institutions that will contribute to the development of new scientific knowledge and space technologies, while making it possible for students to acquire hands-on experience in space-like missions.” The last FAST program awards were in 2017 where $6.2 million was awarded for 31 projects. In this FAST program announcement the expected budget is $3.5 million going to approximately 19 awards. The maximum duration for the grants is three years. For FAST 2019 the grants will be awarded in two categories; Category A: Maximum grant of $300,000 for a maximum duration of three years for an end-to-end space-like mission project that includes the development or improvement of a technology, use of the technology during a flight or field or research site deployment, and data collection and analysis; the maximum amount available per year is $150,000. Those familiar with the program and interested in applying for Category A should be aware that FAST 2019 appears to be a merging of FAST 2017 Category A and B with the resulting median award of $300,000 being the new ceiling for grants. Category B: Maximum grant of $100,000 for two or three years, for a small space-related research project; the maximum amount available per year is $50,000. Category B is what Category C was in FAST 2017. The application deadline is October 18, 2019, 1:00 pm ET. http://spaceq.ca/the-canadian-space-agency-announces-the-fast-2019-opportunity/

  • Registration is now open for Canada Army Run 2024

    24 février 2024 | Local, Terrestre

    Registration is now open for Canada Army Run 2024

    Looking to challenge yourself while making a difference for Canada’s Military community? Look no further than Canada Army Run 2024, presented by BMO.

  • Avions militaires: retombées possibles de 5,2 G$, estime Bombardier

    10 juillet 2023 | Local, Aérospatial

    Avions militaires: retombées possibles de 5,2 G$, estime Bombardier

    Le Canada pourrait profiter de retombées économiques de 5,2 G$ si Bombardier obtenait un contrat de la Défense.

Toutes les nouvelles