Filter Results:

All sectors

All categories

    4367 news articles

    You can refine the results using the filters above.

  • Germany cautious as France leads European defense initiative

    November 12, 2018 | International, Aerospace, Naval, Land

    Germany cautious as France leads European defense initiative

    France is leading a 10-country defense initiative in a bid to "face new threats" outside existing structures. Germany is wary that the project could entangle its military in foreign interventions and undermine the EU. Defense ministers from 10 European countries gathered in Paris on Wednesday to set the agenda for the European Intervention Initiative (EI2), a defense coalition spearheaded by French President Emmanuel Macron. "To face new threats, Europe needs a strong defense," the French Defense Ministry said in a tweet after the meeting. "With the European Intervention Initiative, 10 European countries are committed to its protection." EI2's goal is to create a results-based common strategic culture that allows for rapid response joint military operations, including in humanitarian efforts. As such, it is not aimed at establishing a supranational European army. However, as an initiative outside EU and NATO frameworks, the French Defense Ministry has tried to alleviate concerns that it would undermine defense structures in the bloc and alliance. "With the European Intervention Initiative, the whole European Union and the European pillar in NATO will also be strengthened," it added. 'Germany felt pressured' But France's efforts have done little to placate concerns in Berlin, which Paris sees as a pivotal actor in the initiative. Claudia Major, senior international security associate at the Berlin-based German Institute for International and Security Affairs (SWP), told DW that German officials are wary because "it's explicitly and deliberately organized and set up outside the European Union's structures." "For the Germans, making a deliberate attempt to setting up something meaningful outside the EU's structures — and outside NATO — is not seen as a positive move but rather as undermining the EU," Major said. "In the end, Germany felt pressured to agree and engage in the initiative, because otherwise all the talk about France and Germany being the engine of Europe and the heart of Europe, and driving European integration and cooperation forward, would look cheap, wouldn't it?" Full article: https://amp.dw.com/en/germany-cautious-as-france-leads-european-defense-initiative/a-46201409

  • Contract Awards by US Department of Defense - November 9, 2018

    November 12, 2018 | International, Aerospace, Naval, Land, C4ISR, Security

    Contract Awards by US Department of Defense - November 9, 2018

    DEFENSE LOGISTICS AGENCY Science Applications International Corp.,* Fairfield, New Jersey, has been awarded a $900,310,334 firm-fixed-price, requirements contract for supply and supply chain management of certain tires, supporting the Global Tire Program integrator contract. This was a competitive acquisition with two responses received. This is a five-year base contract with two two-year option periods, plus four two-month option periods. Locations of performance are Texas and other areas located outside the continental U.S., with a March 8, 2024, performance completion date. Using customers are Army, Navy, Air Force, Marine Corps, Coast Guard and foreign military sales. Type of appropriation is fiscal 2019 through 2024 defense working capital funds; and foreign military sales funds. The contracting activity is the Defense Logistics Agency Land and Maritime, Columbus, Ohio (SPE7LX-19-D-0029). WGL Energy Services Inc., Vienna, Virginia, has been awarded a $137,122,332 firm-fixed-price, requirements contract to supply and deliver retail electricity and ancillary/incidental services. This was a competitive acquisition with 11 offers received. This is a two-year contract with no option periods. Locations of performance are Maryland; Washington, District of Columbia; and Pennsylvania, with a Dec. 31, 2020, performance completion date. Using customers are Army, Navy, Defense Logistics Agency, Defense Intelligence Agency, Defense Information Systems Agency and other federal civilian agencies. Using customers are solely responsible to fund this requirements contract and vary in appropriation type and fiscal year. The contracting activity is the Defense Logistics Agency Energy, Fort Belvoir, Virginia (SPE604-19-D-8004). Ziehm Imaging, Orlando, Florida, has been awarded a maximum $135,000,000 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for radiology systems, accessories and training. This is a five-year base contract with one five-year option period. This was a competitive acquisition with 50 responses received. Location of performance is Florida, with a Nov. 8, 2028, performance completion date. Using customers are Army, Navy, Air Force, Marine Corps and federal civilian agencies. Type of appropriation is fiscal 2018 through 2028 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE2D1-19-D-0004). Constellation NewEnergy Inc., Baltimore, Maryland, has been awarded a $23,896,130 firm-fixed-price, requirements contract to supply and deliver retail electricity and ancillary/incidental services. This was a competitive acquisition with 11 offers received. This is a two-year contract with no option periods. Locations of performance are Maryland, New Jersey, Illinois and Pennsylvania, with a Dec. 31, 2020, performance completion date. Using customers are Army, Air Force, Defense Intelligence Agency, Defense Contract Management Agency and other federal civilian agencies. Using customers are solely responsible to fund this requirements contract and vary in appropriation type and fiscal year. The contracting activity is the Defense Logistics Agency Energy, Fort Belvoir, Virginia (SPE604-19-D-8003). Direct Energy Business LLC, Iselin, New Jersey, has been awarded a $7,082,242 firm-fixed-price, requirements contract to supply and deliver retail electricity and ancillary/incidental services. This was a competitive acquisition with 11 offers received. This is a two-year contract with no option periods. Locations of performance are Maryland; Washington, District of Columbia; and Ohio, with a Dec. 31, 2020, performance completion date. Using customers are Marine Corps, Defense Logistics Agency and the Computer Science Study Group. Using customers are solely responsible to fund this requirements contract and vary in appropriation type and fiscal year. The contracting activity is the Defense Logistics Agency Energy, Fort Belvoir, Virginia (SPE604-19-D-8004). NAVY Enterprise Services LLC, Herndon, Virginia, is awarded a potential maximum value $485,965,204 modification under a previously awarded indefinite-delivery/indefinite-quantity existing Next Generation Enterprise Network contract (N00039-13-D-0013). This modification will add a new option period that will extend the potential ordering period by eight months from Oct. 1, 2019, through May 31, 2020. Current and future work will be performed throughout the U.S., Europe, Guam, Korea and Japan. No additional funding will be placed on contract or obligated at the time of modification award. This contract modification was not competitively procured because it is a sole-source acquisition pursuant to the authority of 10 U.S. Code 2304(c)(1), One source or limited sources (Federal Acquisition Regulation subpart 6.302-1). This action is a result of a justification and approval that authorizes extending the ordering period. The Space and Naval Warfare Systems Command, San Diego, California, is the contracting activity. The Charles Stark Draper Laboratory, Cambridge, Massachusetts, is awarded $109,531,179 for modification P00001 to a previously awarded cost-plus-incentive-fee contract (N00030-19-C-0001) to provide research into the applications of technologies to meet guidance requirements for operations on the common missile compartment for the U.S. Columbia-class program and the United Kingdom Dreadnought-class program; provide specialized technical knowledge and support for the hypersonic guidance, navigation and control application; provide technical and engineering services to support the guidance, navigation and control system that will support the Navy's hypersonic flight experiments. Work will be performed in Cambridge, Massachusetts (81 percent); and El Segundo, California (19 percent), with an expected completion date of Sept. 30, 2019. Fiscal 2019 weapons procurement (Navy) funds in the amount of $11,306,900; operations and maintenance (Navy) funds in the amount of $92,708,279; and United Kingdom funds in the amount of $5,516,000 will be obligated. Funds in the amount of $92,708,279 will expire at the end of the current fiscal year. This contract was a sole-source acquisition pursuant to 10 U.S. Code 2304(c)(1)&(4). Strategic Systems Programs, Washington, District of Columbia, is the contracting activity. KBR Diego Garcia LLC, Houston, Texas, is awarded a $61,979,897 modification under a previously awarded indefinite-delivery/indefinite-quantity contract (N62742-17-D-3600) to exercise Option One for base operations support services at U.S. Navy Support Facility, Diego Garcia. The work to be performed provides for general management and administration services; command and staff (information technology services, information technology support and management, telephone services, telecommunication services, antenna maintenance); public safety (fire protection and emergency services); air operations (ground electronics, airfield facilities, and passenger terminal and cargo handling); port operations; supply (supply services and petroleum, oil and lubricant management and operations, and ship's store service activities); morale, welfare and recreation support; galley; bachelor quarters; facilities support (facility management, facility investment sustainment, restoration and modernization, custodial, pest control, integrated solid waste management, grounds maintenance, and pavement clearance); utilities (electrical, compressed gases, wastewater, steam, hot water and demineralized water, and potable water); base support vehicles and equipment; and environmental to provide integrated base operating services. After award of this option, the total cumulative contract value will be $118,107,288. Work will be performed in Diego Garcia, British Indian Ocean Territory, and is expected to be completed November 2019. No funds will be obligated at time of award. Fiscal 2019 operations and maintenance (Navy and Air Force); and fiscal 2019 non-appropriated funds in the amount of $43,553,618 for recurring work will be obligated on individual task orders issued during the option period, of which $42,716,660 will expire at the end of the current fiscal year, and $836,958 is subject to the availability of funds for the next fiscal year. The Naval Facilities Engineering Command Pacific, Pearl Harbor, Hawaii, is the contracting activity. Navy Transportation Partners JV, Virginia Beach, Virginia, is awarded a maximum amount $30,000,000 firm-fixed-price, indefinite-delivery/indefinite-quantity architect-engineering contract for traffic engineering and planning services in support of projects primarily located at military installations in the Hampton Roads area of Virginia. The work to be performed provides for comprehensive architect-engineering services required for transportation planning, design, and construction services in support of new construction, repair, replacement, demolition, alteration, and/or improvement of Navy and other governmental facilities. Projects may involve single or multiple disciplines, including, but not limited to, architectural, structural, mechanical, electrical, civil, landscape design, fire protection, and interior design. Task order 0001 is being awarded at $199,921 for the design of an anti-terrorism perimeter and security entry point at Rome, New York. Work for this task order is expected to be completed by September 2019. All work on this contract will be performed at various Navy facilities and other government facilities within the Naval Facilities Engineering Command, Mid-Atlantic area of responsibility including, but not limited to the Hampton Roads area of Virginia. The term of the contract is not to exceed 60 months with an expected completion date of November 2023. Fiscal 2018 military construction, (Air Force) contract funds in the amount of $199,921 are obligated on this award and will not expire at the end of the current fiscal year. Future task orders will be primarily funded by military construction (Navy); operations and maintenance (Navy); and Navy working capital funds. This contract was competitively procured via the Navy Electronic Commerce Online website, with seven proposals received. The Naval Facilities Engineering Command, Mid-Atlantic, Norfolk, Virginia, is the contracting activity (N40085-19-D-9008). Colonna's Shipyard Inc., Norfolk, Virginia, is awarded a $10,473,071 firm-fixed-price contract for a 121-calendar day shipyard availability for the regular overhaul and dry docking of USNS Zeus (T-ARC 7). Work will include furnishing general services for the ship, inspect main propulsion motors, cable handling upgrades, heavy overboard system replacement, antenna mast modification, high precision acoustic positioning upgrade, docking and un-docking vessel, propeller shaft inspection, underwater hull cleaning and painting, freeboard cleaning and painting, and sea valve replacement. The contract includes options which, if exercised, would bring the total contract value to $13,429,595. Work will be performed in Norfolk, Virginia, and is expected to be completed by April 13, 2019. Fiscal 2019 operations and maintenance (Navy) funds in the amount of $13,429,595 are obligated at the time of award. Contract funds will not expire. This contract was competitively procured with proposals solicited via the Federal Business Opportunities website, with three offers received. The Navy's Military Sealift Command, Norfolk, Virginia, is the contracting activity (N3220519C4151). ARMY AECOM Energy & Construction Inc., Greenwood Village, Colorado, was awarded an $117,338,000 firm-fixed-price contract for major rehabilitation, demolition, temporary facilities, surveying, dewatering and protecting lock chamber, blasting, removing and replacing horizontal concrete at Illinois River Basin, LaGrange Lock and Dam. Bids were solicited via the internet with one bid received. Work will be performed in Versailles, Illinois, with an estimated completion date of July 16, 2021. Fiscal 2019 operations and maintenance, Army funds in the amount of 24,700,000 were obligated at the time of the award. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity (W912EK-19-C-0002). VERSAR Inc., Springfield, Virginia, was awarded a $25,000,000 firm-fixed-price contract for support program management, contract administration, project engineering, quality assurance, real estate, and support staff for continued operations in Iraq. Bids were solicited via the internet with six bids received. Work locations and funding will be determined with each order, with an estimated completion date of Sept. 13, 2023. U.S. Army Corps of Engineers, Winchester, Virginia, is the contracting activity (W912ER-18-D-0012). IDS International Government Services LLC, Arlington, Virginia, was awarded a $22,037,300 firm-fixed-price contract for operations and maintenance (O&M) services for critical infrastructure, facilities, and Afghan national O&M vocation training for Combined Security Transition Command-Afghanistan in the planning and construction of Afghanistan National Security Forces facilities. One bid was solicited via the internet with once bid received. Work will be performed in Afghanistan with an estimated completion date of March 11, 2019. Fiscal 2018 Afghan Security Forces Funding funds in the amount of $14,000,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Winchester, Virginia, is the contracting activity (W912ER-19-C-0003). CORRECTION: A Thursday, Nov. 8, 2018, announcement that Deloitte & Touche LLP, Arlington, Virginia, was awarded an $18,056,941 firm-fixed-price contract to provide a cyberspace analytics capability was incorrect. That contract has not yet been awarded. CORRECTION: A Thursday, Nov. 8, 2018, announcement that Parsons Government Services Inc., Pasadena, California, was awarded a $15,837,195 firm-fixed-price contract to provide the Defensive Cyberspace Operations Mission Planning program was incorrect. That contract has not yet been awarded. AIR FORCE Pride Industries, Roseville, California, has been awarded a $14,193,270 modification (P00042) awarded for civil engineering services, and is for operations and maintenance, engineering, environmental, and grounds maintenance for 61st Civil Engineer and Logistics Squadron. Work will be performed at Los Angeles Air Force Base, California; Fort MacArthur, California; and Defense Contract Management Agency, Carson, California, and is expected to be completed by Nov. 30, 2019. Fiscal 2019 operations and maintenance funds in the amount of $10,429,104 are being obligated at the time of award. Space and Missile Systems Center, Los Angeles Air Force Base, California, is the contracting activity (FA2816-17-C-0001). *Small business https://dod.defense.gov/News/Contracts/Contract-View/Article/1687755/source/GovDelivery/

  • Rust Costs the Pentagon $21 Billion Per Year

    November 12, 2018 | International, Aerospace, Naval, Land

    Rust Costs the Pentagon $21 Billion Per Year

    By Aaron Boyd, The Defense Department isn't doing a good job determining how much to spend to prevent damage from nature's basic chemical reactions. Rust costs the Pentagon more money annually than many of its most expensive weapons systems—up to $21 billion per year, according to a Defense Department-commissioned audit released in March. The report indicates the corrosion of metals that make up modern weapons systems like fighter jets, ships, ballistic missiles and nuclear weapons can sometimes approach one-third of the total operations and maintenance costs of those systems. The problem is so large, in 2002, the department established the Office of Corrosion Policy and Oversight to ensure big-dollar weapons systems weren't taken offline by oxidation and to help branches determine how much money ought to be spent on rust prevention. But the data being reported by the military branches has been inconsistent and the office has yet to issue guidance on how funding levels should be categorized, according to a related audit released Thursday by the Government Accountability Office. For example, “In fiscal year 2017, the Army and Navy used direct costs, such as salary and training costs, to identify their funding levels, but the Army also included other associated costs. The Air Force used the prior year's funding level and adjusted it for inflation,” the report states. These different methods led to funding requests based on different criteria, making it difficult for Congress to determine what an appropriate funding level should look like. It has also led to vastly different funding requests. In 2017, the Army requested $2.4 million and the Air Force $3 million, while the Navy only requested $220,000. Similarly, all three branches either failed to accurately report the supporting data or, in the Air Force's case, did not provide any data at all some years. “The Army data GAO received did not reconcile with data presented in the Corrosion Office annual reports to Congress for five of eight fiscal years,” auditors wrote. “The Navy data did not reconcile for two of eight fiscal years, and there was no supporting documentation identifying how these figures were calculated. Air Force officials did not provide any figures or supporting documentation for four fiscal years, stating that these figures were not available.” Army officials told GAO they're not able to accurately report how much is spent preventing or combating corrosion because many of those duties are performed by personnel who do many other things, as well. This includes the Army's lead corrosion executive, who also serves as the aviation logistics and safety officer for the Army G-4 logistics organization. “The corrosion-related costs of conducting the corrosion executive role are not separated from this other function,” they told GAO. The Navy had a similar issue but took a different tack. The Navy merely requested $220,000 for the corrosion executive's salary, despite the fact that “this method does not capture other costs, such as personnel assigned to other offices that provide support to the corrosion executive.” The misreported numbers don't appear to be malfeasance, according to the GAO report, but a natural consequence of a lack of direction from the Corrosion Office on how to identify funding needs and properly report that data. GAO made three recommendations to the Defense Department: Issue guidance for identifying and reviewing funding levels for performing corrosion executive duties. Ensure that the Corrosion Office develops a process to maintain documentation of its reviews of corrosion planning. Ensure that corrosion executives establish guidance on reviewing the adequacy of corrosion planning. Defense officials agreed with all three recommendations. https://www.nextgov.com/cio-briefing/2018/11/rust-costs-pentagon-21-billion-year/152709/

  • UK - MOD sets out vision to diversify supply base

    November 9, 2018 | International, Aerospace, Naval, Land, C4ISR, Security

    UK - MOD sets out vision to diversify supply base

    The Ministry of Defence has today announced plans for modernising its estate and establishing a broader and more diverse supply base. The Defence Infrastructure Organisation's (DIO) new procurement plan outlines a programme of major projects and contacts for the next five financial years. This includes work to construct new buildings, such as housing and accommodation, the refurbishment of current facilities; as well as services such as catering, waste management and cleaning. The plan also sets out ambitions to establish a broader and more diverse supply base, including doing more business with small and medium size enterprises (SMEs). Currently, around 75% of spending on maintenance at defence sites goes directly or indirectly to SMEs, and further diversifying the supply base will help build resilience into projects and provide more opportunities for smaller companies to work on key defence projects. By listing all the major projects and contracts, the procurement plan will make it easier for existing and potential suppliers to plan ahead, by offering advice on bidding for this work and greater transparency on working with the MOD. These measures will help in particular small businesses, who don't always have the skills and prior experience of working with the MOD in such areas. Minister for Defence People and Veterans Tobias Ellwood said: The defence estate is where our brave armed forces live, work and train and so it's crucial we give them the best supplies and facilities possible. Working with industry is critical to delivering this, and our new Procurement Plan ensures the private sector has a head start in bidding for this crucial work. Opportunities outlined in the Procurement Plan include the £4billion Defence Estate Optimisation Programme, the Future Defence Infrastructure Services contracts - which will provide facilities management across the UK's military bases- and the £1.3bn Clyde Infrastructure Programme. The plan also details several prominent works that demonstrate DIO's key role in supporting defence throughout the UK. These include essential maintenance work worth £568 million to support nuclear infrastructure capability at HMNB Clyde, as well as a £58m investment in a modern submarine training facility at the base. Alongside this, there are plans for an £8m investment in Bovington Camp to support the AJAX armoured vehicles which will enter service in 2020. Jacqui Rock, DIO Commercial Director, said: As DIO we recognise that our current and future suppliers are key to our success. We have worked with industry to produce the Procurement Plan and we are committed to building a broader, more diverse supplier base. We believe in being as transparent as possible in our procurements and through this new approach we are encouraging new entrants, including small and medium sized enterprises, to consider the benefits and opportunities that working with DIO can deliver. The Procurement Plan will help achieve the goals set out in our first ever Commercial Strategy. This set out our vision for how we do business and how we will work effectively with our suppliers. The Procurement Plan also sets out how DIO can deliver social and economic benefits throughout its supply chain by working to contribute to the government's aim of recruiting 20,000 apprentices through construction procurement and promoting sustainability through its supply chain. By 2020, DIO has committed to a reduction of greenhouse gas emissions by 30%, a 30% reduction in domestic business flights, a 50% reduction in paper usage and reducing waste going to the landfill to less than 10%. The full DIO Procurement Plan can be found here The DIO Commercial Strategy sets the direction for future DIO Procurement Plans. The full DIO Commercial Strategy can be found here https://www.gov.uk/government/news/mod-sets-out-vision-to-diversify-supply-base--2

  • US defense industry pushes back on White House’s proposed $33B budget cut

    November 9, 2018 | International, Aerospace, Naval, Land, C4ISR, Security

    US defense industry pushes back on White House’s proposed $33B budget cut

    By: Joe Gould and Aaron Mehta WASHINGTON — The American defense industry is warning that defense cuts proposed by the Trump administration could undermine the Pentagon's efforts to modernize the military and address threats from Russia, China, Iran, North Korea and transnational terrorism. The Aerospace Industries Association, with the weight of the country's large and small defense firms behind it, issued a statement Thursday warning President Donald Trump and Congress “to provide steady and stable growth in defense spending in the fiscal year 2020 budget request and beyond” if they want to be able to meet those threats. The message comes as Democrats — expected to prioritize domestic spending and question record defense increases — won the House this week, and after White House budget director Mick Mulvaney ordered the Pentagon to prepare for a $700 billion national defense budget proposal for fiscal 2020. (For comparison's sake, the Pentagon is also continuing to prep the $733 billion budget it was expecting.) AIA argued in its statement that the last two years of budget growth have helped the Department of Defense and industry turn things around after years of war and budget instability, but not entirely. “As a result, military readiness is improving, and our industry is responding with more innovation and advanced capabilities,” the statement reads. “But the shortfalls of the last decade cannot be erased in the space of two years, and now the Administration has announced potential reductions in defense investment that could undermine the improvements that are just now materializing.” Last year, Defense Secretary Jim Mattis testified that the Pentagon needed 3 to 5 percent annual growth above inflation through 2023 to stay ahead of near-peer adversaries Russia and China. Congress responded with a $700 billion national defense budget for 2018 and $716 billion for 2019 — but also a $1 trillion tax cut that's grown the national deficit. National security adviser John Bolton said publicly, days before Tuesday's election, that the national debt is “an existential threat to society” and that Pentagon spending will have to “flatten out” in the near term. Deputy Secretary of Defense Patrick Shanahan had signaled in recent weeks that modernization programs like hypersonic weapons systems would take a hit if the budget falls. “It comes down to a judgment call, how fast do we modernize? And that's probably the biggest knob that we have to turn,” he said. Along similar lines, AIA argued that to achieve the Pentagon's National Defense Strategy — which "requires armed forces that are large and capable enough to meet multiple threats in multiple environments” — “we must continue to invest in the most effective technology and weapons we can provide.” “America's competitors and adversaries have made huge strides in their offensive and defensive capabilities, from submarines to cyberspace, and continue to develop advanced technology and sophisticated operational concepts,” the statement warns. Though it's unclear how sensitive the administration will be to this call, it has been vocal about its focus on the defense-industrial base in concert with Trump's emphasis on the American economy. A Trump-ordered study found roughly 300 gaps and vulnerabilities across America's network of defense suppliers; Pentagon officials are hopeful a third of those issues will be addressed in the next year. Whatever the administration does with its budget submission, it will be up to the new Congress to tweak it. Following the midterm elections, analysts have predictedlawmakers in next year's divided government will overcome gridlock to reach a budget deal that maintains flat defense spending. https://www.defensenews.com/industry/2018/11/08/us-defense-industry-pushes-back-on-white-houses-proposed-33b-budget-cut

  • From crowd control to ‘wireless energy beaming,' the Army’s new vehicles must have more power but use less fuel

    November 9, 2018 | International, Land

    From crowd control to ‘wireless energy beaming,' the Army’s new vehicles must have more power but use less fuel

    By: Todd South As Army leadership looks to transform ground operations and logistics experts shave supply requirements such as fuel, work being done to generate more electric power with less fuel is at the heart of the land fight in the next wave of warfare. The two paths converge at work being done to “electrify” the future vehicle fleet at the Army's center for vehicle research – the Tank Automotive Research Development and Engineering Center. A November forum at TARDEC focused on advances in vehicle electrical power as service leaders, industry experts and researchers pursue ways to give more soldiers more power to run complex systems of the future. The first such forum took place in June and laid out an overview of what will need to happen to reach Army goals. Over the next year, participants will refine their plans to build a complex fleet of vehicles capable of a host of tasks not yet fielded. Vehicles have come a long way from moving forward and backward and carrying troops and ammo. “The electrical demands on the Army's vehicles today are growing far beyond anything we've seen before,” said George Hamilton, TARDEC's lead for Vehicle Electronics Architecture. “Our focus is on developing and providing a modular, flexible and adaptable vehicle architecture that can expand to meet future demands of all kinds.” And the goals are ambitious. The Army wants most of the electrification infrastructure in place or ready for testing by mid-2024 and a working, all-electric power train for the fleet by 2027. The systems and capabilities that the electrification project is pursuing are aimed at enabling seamless Multi-Domain Operations in which forces can access limited windows in the fight at various domains, from the traditional air-land-sea to cyber-electronic warfare-space domains. But, power demands on legacy vehicles only grow as more systems are added, experts said. Over time, that's meant entirely new wiring, amplifiers and other electronics architecture for the same vehicles that have been in service for decades. For example, in 2001, the standard vehicle only required a 150 amp alternator to power its onboard systems. Today, that same vehicle needs 10 times the amperage to run all of the weapon systems, computers, radios, monitors and cameras on current vehicles. At a recent talk at the Association of the U.S. Army, Lt. Gen. Aundre Piggee, the Army G-4, said that future combat operations will not be able to rely on forward operating bases. Logisticians will need to find expeditionary ways to move supplies, especially fuel, to combat units. Current brigade combat teams are able to operate for about three days before a full resupply. But Piggee said that the goal is to stretch that to seven days. To meet that end, a variety of options are being explored, but the main supply saver is reducing demand, specifically fuel. BCTs will need to use at least one-third less fuel to keep their standalone abilities at the one-week mark, he said. That extends beyond petroleum and to battery life, power consumption on smart grids, and anywhere else that technology procedures and advancements can make the formation lethal as long with less fuel or power consumption. So, at the same time that larger formations must be more self-sustaining and use less fuel, the systems that enable their fighting might will need more power. Tomorrow's vehicles will need to do much more than what's being demanded now. On the Army wish list are energy weapon systems to counter rockets, missiles and drones, wireless energy beaming to help with running unmanned ground vehicles and aerial drones with remote power, non-lethal energy weapons for crowd disbursement, silent modes for vehicle movement, high-power electronic jamming, electronic armor to deflect electromagnetic spectrum and projectile attacks, and long-range electromagnetic guns for multiple uses. And the backbone of those capabilities is an open architecture powering system on the next wave of ground vehicles that nearly any system built today or decades from now can plug into, and it will provide the power needed to run. Part of that, the Next-Generation Combat Vehicle Electrical Power Architecture, has been in development at TARDEC since 2012. Once implemented, the system is expected to provide fuel efficiency that will reduce fuel consumption by more than 10 percent and provide 20 percent more efficient power generation and energy transfer. That will put less strain on the vehicle systems while using less fuel and providing more power. And, it can take powerful hybrid vehicles, those using both petroleum-based fuels and battery or fuel cell power. This effort is coupled with a recent partnership between TARDEC and the U.S. Department of Energy into hydrogen fuel cell technology. “We think hydrogen as a fuel source, and the fuel cells that generate electricity from the hydrogen, will enable enormous capability for our warfighters,” Paul Rogers, director of TARDEC, said in a release. The applications go beyond fuel efficiency and reducing fuel logistics burdens. “Vehicles using hydrogen run on electric motor propulsion, giving very low noise and thermal signatures while in operation,” Rogers said. “Additionally, we can generate valuable electrical power using hydrogen fuel cells that currently requires noisy and heavy generators.” Both of those efforts could help not only operational forces in the tactical fight but the surrounding support that brings them their supplies. https://www.armytimes.com/news/your-army/2018/11/08/from-crowd-control-to-wireless-energy-beaming-the-armys-new-vehicles-must-have-more-power-but-use-less-fuel

  • Contract Awards by US Department of Defense - November 8, 2018

    November 9, 2018 | International, Aerospace, Naval, Land, C4ISR, Security

    Contract Awards by US Department of Defense - November 8, 2018

    AIR FORCE Ball Aerospace & Technologies Corp., Boulder, Colorado, has been awarded a $255,418,494 firm-fixed-price contract modification (P00008) to previously awarded contract FA8810-18-C-0002 for the Weather System Follow-on Microwave. This contract modification provides for the exercise of an option for development and fabrication of the Weather System Follow-on Microwave Space Vehicle 1. Work will be performed in Boulder, Colorado, and is expected to be completed by Jan. 15, 2023. Fiscal 2018 research, development, test and evaluation funds are being obligated at the time of award. The total cumulative face value of the contract is $349,552,413. The Space and Missile Systems Center, Los Angeles Air Force Base, California, is the contracting activity. Crew Training International Inc., Memphis, Tennessee, has been awarded a $241,410,854 firm-fixed-price contract for the MQ-9 Contract Aircrew Training and Courseware Development training program. Work will be performed at Creech Air Force Base, Nevada; Holloman AFB, New Mexico; March Air Reserve Base, California; Hancock Field Air National Guard Base, New York, and other locations that may be required in the future in accordance with the performance work statement. Work is expected to be completed by Sept. 30, 2023. This award is a result of a competitive acquisition and eight offers were received. Fiscal 2019 operations and maintenance funds in the amount of $1,006,536 are being obligated at time of award for the phase-in period. Acquisition Management and Integration Center, Join Base Langley-Eustis, Virginia, is the contracting activity (FA4890-19-C-0003). (Awarded Nov. 7, 2018) UNKS Construction, Las Vegas, Nevada (FA4686-19-D-A001); Trinity North Star Construction JV, Plumas Lake, California (FA4686-19-D-A002); Hesperia Construction Co., Pleasanton, California (FA4686-19-D-A003); Utility Construction, Mesa, Arizona (FA4686-19-D-A004); Atwood Hay Inc., Beale Air Force Base, California (FA4686-19-D-A005); Synergy Electric Co. Inc., Santee, California (FA4686-19-D-A006); Tri-Technic Inc., Sonora, California (FA4686-19-D-A007); and Nomlaki Technologies, Yuba City, California (FA4686-19-D-A008), have been awarded a not-to-exceed $93,000,000 firm-fixed-price, multiple-award, electric-construction, indefinite-delivery/indefinite-quantity contract. Task orders will provide the execution of a broad range of projects, including, but not limited to, construction, repair, replacement and installation of various electrical distribution components. Work will be performed at Beale AFB, California, and is expected to be completed November 8, 2023. This award is the result of a competitive acquisition and 10 offers were received. Fiscal 2019 operations and maintenance funds in the amount of $16,000 ($2,000 for each awardee) are being obligated at the time of award. The 9th Contracting Squadron, Beale AFB, California, is the contracting activity. ARMY Colt's Manufacturing Company LLC, West Hartford, Connecticut, was awarded an $88,607,109 modification (P00008) to contract W15QKN-15-D-0102 for M4 and M4A1 carbines. Work will be performed in West Hartford, Connecticut, with an estimated completion date of Sept. 25, 2020. Fiscal 2019 and 2020 operations and maintenance, Army funds in the amount of $88,607,109 were obligated at the time of the award. U.S. Army Contracting Command, New Jersey, is the contracting activity. FN America LLC, Columbia, South Carolina, was awarded an $88,607,109 modification (P00009) to contract W15QKN-15-D-0072 for M4 and M4A1 carbines. Work will be performed in Columbia, South Carolina, with an estimated completion date of Sept. 25, 2020. Fiscal 2019 and 2020 operations and maintenance, Army funds in the amount of $88,607,709 were obligated at the time of the award. U.S. Army Contracting Command, New Jersey, is the contracting activity. Deloitte & Touche LLP, Arlington, Virginia, was awarded an $18,056,941 firm-fixed-price contract to provide a cyberspace analytics capability. Twenty-eight bids were solicited with four received. Work will be performed in Arlington, Virginia, with an estimated completion date of Nov. 7, 2023. Fiscal 2019 research, development, test and evaluation funds in the amount of $1,250,000 were obligated at the time of the award. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity (W52P1J-19-C-0004). Parsons Government Services Inc., Pasadena, California, was awarded a $15,837,195 firm-fixed-price contract to provide Defensive Cyberspace Operations Mission Planning program. Nineteen bids were solicited with seven received. Work will be performed in Centerville, Virginia, with an estimated completion date of Nov. 7, 2019. Fiscal 2019 research, development, test and evaluation funds in the amount of $1,000,000 were obligated at the time of the award. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity (W52P1J-19-C-0005). Great Lakes Dredge and Dock Co. LLC, Oak Brook, Illinois, was awarded a $10,779,850 firm-fixed-price contract for maintenance dredging. Bids were solicited via the internet with three received. Work will be performed in Mayport, Florida, with an estimated completion date of May 30, 2019. Fiscal 2019 other funds in the amount of $10,779,850 were obligated at the time of the award. U.S. Army Corps of Engineers, Jacksonville, Florida, is the contracting activity (W912EP-19-C-0002). IronMountain Solutions Inc.,* Huntsville, Alabama, was awarded a $9,000,081 Foreign Military Sales (Brazil, Egypt, Jordan, Mexico, Saudi Arabia, Taiwan, Slovakia, Sweden, Tunisia, Thailand and United Arab Emirates) modification (000024) to contract W31P4Q-17-A-0001 for support services for non-AMRDEC technical support for the Utility Helicopter Project Office. Bids were solicited via the internet with three bids received. Work will be performed in Huntsville, Alabama, with an estimated completion date of May 14, 2019. Fiscal 2018 foreign military sales; research, development, test and evaluation; and other procurement, Army funds in the amount of $9,000,081 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. Longbow LLC, Orlando, Florida, was awarded an $8,973,759 modification (P00073) to contract W31P4Q-16-C-0035 for laser and longbow HELLFIRE engineering services. Work will be performed in Orlando and Ocala, Florida, with an estimated completion date of Nov. 7, 2019. Fiscal 2018 other procurement, Army funds in the amount of $8,973,759 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. MISSILE DEFENSE AGENCY Raytheon Missile Systems Co., Tucson, Arizona, is being awarded a $74,847,815 sole-source, cost-plus-incentive-fee modification (P00049) to contract HQ0276-15-C-0003. This modification award is for the execution of the Guidance Electronics Unit (GEU) Phase III procurement under the Standard Missile-3 (SM-3) Block IIA contract. Congress was notified of the Phase II procurement in December 2016. Under this contract, the contractor will continue efforts for qualification, test and integration of the enhanced GEU capability to the SM-3 Block IIA missile. The modification brings the total face value of the SM-3 BLK IIA contract to $1,192,183,647 from $1,117,335,832. The work will be performed in Tucson, Arizona, with an expected Phase III completion date of Sept. 30, 2020. The performance period is from Oct. 1, 2018, through Sept. 30, 2020. Fiscal 2018 research, development, test and evaluation funds in the amount of $1,000,000 will be obligated at the time of award. The Missile Defense Agency, Dahlgren, Virginia, is the contracting activity (HQ0276-15-C-0003). DEFENSE LOGISTICS AGENCY General Dynamics Land Systems Inc., Sterling Heights, Michigan, has been awarded a maximum $12,243,227 firm-fixed-price contract for tank periscope head assemblies with storage containers for the M1A1 Abrams tank. This is a one-year base contract with one 180-day option period being exercised at time of award. This was a sole-source acquisition using justification 10 U.S. Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. Locations of performance are South Carolina and Michigan, with a Dec. 15, 2022, performance completion date. Using military service is Army. Type of appropriation is fiscal 2019 through 2022 Army working capital funds. The contracting activity is the Defense Logistics Agency Land and Maritime, Warren, Michigan (SPRDL1-18-C-0317). Knox County Association for Retarded Citizens,** Vincennes, Indiana, has been awarded a $8,999,635 modification (P0002) exercising the first option period of a one-year base contract (SPE1C1-18-D-N024) with two one-year option periods for undershirts. This is a firm-fixed-price contract. Location of performance is Indiana, with a Nov. 12, 2019, performance completion date. Using military services are Army and Air Force. Type of appropriation is fiscal 2019 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania. Central Power Systems & Services Inc.,* Liberty, Missouri, has been awarded a maximum $7,240,000 firm-fixed-price contract for diesel engines. This is a three-year contract with no option periods. This was an acquisition permitting other than full and open competition for manufacturer parts with two responses received, using justification 10 U.S. Code 2304(c)(1), as stated in Federal Acquisition Regulation 6.302-1. Location of performance is Missouri, with a Nov. 8, 2021, performance completion date. Using military service is Army. Type of appropriation is fiscal 2019 through 2021 Army working capital funds. The contracting activity is the Defense Logistics Agency Land and Maritime, Warren, Michigan (SPRDL1-19-D-0012). NAVY DRS Laurel Technologies, Johnstown, Pennsylvania, is awarded $8,608,626 for firm-fixed-price delivery order N0002419F5601 under previously-awarded contract N00024-15-D-5201 for 18 Technical Insertion (TI) 16 Common Processing System (CPS) water-cooled core computing system production cabinets and six TI-16 CPS water-cooled advanced storage area network production cabinets. The CPS provides the computer processing and memory, data storage and extraction and input/output interfaces to support host software applications of Navy combat systems. This delivery order involves foreign military sales to the Republic of Korea. Work will be performed in Johnstown, Pennsylvania, and is expected to be completed by December 2019. Foreign military sales funding in the amount of $8,608,626 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity. *Small business **Mandatory source https://dod.defense.gov/News/Contracts/Contract-View/Article/1686733/source/GovDelivery/

  • More than meets the eye: Army selects next-gen camouflage system

    November 8, 2018 | International, Land

    More than meets the eye: Army selects next-gen camouflage system

    By: Kyle Rempfer The Army has finally selected a company to provide it with the next generation of ultra light-weight, general-purpose camouflage. The Army's Ultra-Light Camouflage Netting System, or ULCANS, will be an all-weather, state-of-the-art signature concealment system that provides multi-spectral protection for troops and equipment. The program aims to replace the legacy woodland and desert camouflage variants developed in the 1990s, and will be developed in light and dark woodland, snow and alpine, desert, and urban variants. The Army hopes ULCANS will better conceal the signatures of troops and equipment from high-end sensor threats on the battlefield. The contract to produce the next-generation camouflage was awarded to Fibrotex USA Inc., according to a company statement provided to Army Times. The contract is a 10-year, indefinite delivery and indefinite quantity award, with a total value of $480 million. Fibrotex is expected to begin full-rate production in early 2019, according to the company. ULCANS is the result of nearly two years of testing, trials and data collection conducted by the U.S. Army's Natick Soldier Systems Center in Massachusetts. Natick tested camouflage technologies from major global manufacturers against the Army's most advanced battlefield surveillance sensors. Many of the technologies underpinning ULCANS are based on developments by Fibrotex's Israel-based parent company over the last two decades, but have been specially modified for the U.S. Department of Defense. The Fibrotex system will provide multi-spectral camouflage, which conceals objects from detection across several portions of the electromagnetic spectrum at the same time. Traditional military camouflage simply hides an object in the visible spectrum, but the multi-spectral design obscures detection in the infrared, thermal and radar spectrum as well. “Today more than ever, military forces and opposition groups are using night vision sensors and thermal devices against our troops, but by using Fibrotex's camouflage, concealment and deception solutions, we make them undetectable again, allowing them to continue keeping us safe," said Eyal Malleron, CEO of Fibrotex USA. Fibrotex will also deliver the ULCANS material in reversible designs — allowing for the first time a different pattern and capability on each side, enabling soldiers, vehicles and systems to disappear into light or dark woodland, snow or alpine and desert or urban environments in any operational theater. “We have more than 50 years of experience, with thousands of hours in the field and a deep understanding of conventional and asymmetric warfare," Malleron said. "The U.S. Army tested our best camouflage solutions, and the camouflage repeatedly demonstrated the ability to defeat all sensors known to be operating in the battlefield and throughout the electromagnetic spectrum.” ULCANS will also be manufactured stateside, in a new state-of-the-art facility in McCreary County, Kentucky, creating hundreds of new skilled American jobs over the next decade, according to Fibrotex. “I firmly believe we have the best workforce in the country, and that their hard work and dedication has earned these new jobs, helping deliver a vital new military contract from McCreary County," Rep. Hal Rogers, R-Ky., said in a press statement. "I take great pride in knowing that our people are crafting these products to keep our warfighters and allies safe, giving them an edge on the battlefield.” The new facility is being established next to Outdoor Venture Corporation, which is a strategic partner to Fibrotex USA and already designs modular personnel tents and command post tents for the Army. https://www.armytimes.com/news/your-military/2018/11/07/more-than-meets-the-eye-army-selects-next-gen-camouflage-system

  • Contract Awards by US Department of Defense - November 7, 2018

    November 8, 2018 | International, Aerospace, Naval, Land, C4ISR, Security

    Contract Awards by US Department of Defense - November 7, 2018

    ARMY Aegis Defense Services LLC, McLean, Virginia (W52P1J-19-D-0001); Janus Global Operations LLC, Lenoir City, Tennessee (W52P1J-19-D-0002); Reed International Inc., Leesburg, Virginia (W52P1J-19-D-0003); Sallyport Global Services, Reston, Virginia (W52P1J-19-D-0004); and Triple Canopy Inc., Reston, Virginia (W52P1J-19-D-0005), will compete for each order of the $4,000,000,000 firm-fixed-price contract for security support services. Bids were solicited via the internet with seven received. Work locations and funding will be determined with each order, with an estimated completion date of Nov. 1, 2024. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity. DRS Network & Imaging Systems LLC, Huntsville, Alabama, was awarded a $129,209,418 cost-plus-fixed-fee Foreign Military Sales (Australia, Egypt, Kuwait, Iraq Morocco and Saudi Arabia) contract for system technical support services, system sustainment technical support services, and post production software support services for the Direct Support Electrical System Test Set, embedded diagnostics, software loader/verifier, combined application platform and power and diagnostics services. One bid was solicited with one bid received. Work locations and funding will be determined with each order, with an estimated completion date of Nov. 6, 2023. U.S. Army Contracting Command, Warren, Michigan, is the contracting activity (W56HZV-19-D-0009). DMCA Inc.,* Arlington, Virginia (W91278-19-D-0001); Doyon Project Services LLC,* Federal Way, Washington (W91278-19-D-0002); Facility Services Management Inc.,* Clarksville, Tennessee (W91278-19-D-0003); Herman Construction Group Inc.,* Escondido, California (W91278-19-D-0004); LEGO Construction Co.,* Miami, Florida (W91278-19-D-0005); Royce Construction Services LLC,* Reston, Virginia (W91278-19-D-0006); and T&C Services LLC,* Anchorage, Alaska (W91278-19-D-0007), will compete for each order of the $49,000,000 firm-fixed-price contract for medical facility repair and minor construction. Bids were solicited via the internet with eight received. Work locations and funding will be determined with each order, with an estimated completion date of Oct. 31, 2023. U.S. Army Corps of Engineers, Mobile, Alabama, is the contracting activity. Oshkosh Defense LLC, Oshkosh, Wisconsin, was awarded an $11,981,727 modification (P00137) to contract W56HZV-15-C-0095 for Revision One to Joint Light Tactical Vehicle Retrofit Work Directive. Work will be performed in Oshkosh, Wisconsin, with an estimated completion date of Dec. 13, 2019. Fiscal 2018 other procurement, Army funds in the amount of $11,981,727 were obligated at the time of the award. U.S. Army Contracting Command, Warren, Michigan, is the contracting activity. Kipper Tool Co., Gainesville, Georgia, was awarded a $10,419,853 firm-fixed-price contract for hydraulic, electric, pneumatic operated equipment. One bid was solicited with one bid received. Work will be performed in Gainesville, Georgia, with an estimated completion date of Sept. 27, 2019. Fiscal 2017 National Guard and Reserve Equipment Appropriation funds in the amount of $10,419,853 were obligated at the time of the award. U.S. Army Contracting Command, Warren, Michigan, is the contracting activity (W56HZV-19-F-0051). AIR FORCE The Boeing Co., Heath, Ohio, has been awarded an $18,491,168, requirements task order for guidance and navigation system repairs for multiple aircraft platforms. Work will be performed in Heath, Ohio, and is expected to be completed by Sept. 29, 2019. This award is the result of a sole-source acquisition. Fiscal 2019 working capital funds in the amount of $18,491,168, are being obligated at the time of award. Air Force Sustainment Center, Tinker Air Force Base, Oklahoma, is the contracting activity (FA8117-15-F-0030). Materials Engineering and Technical Support Services, Westerville, Ohio, has been awarded a $9,750,000 indefinite-delivery/indefinite-quantity contract for research, development, test and evaluation of methods and technologies to mitigate chemical and biological threat hazards. This contract provides for literature, policy, and technology reviews; laboratory and field studies; and modeling and simulation activities to further expand the understanding of the impact of chemical and biological threat agents. Work will be performed in Westerville, Ohio; and Wright-Patterson Air Force Base, Ohio, and expected to be completed by Nov. 7, 2024. This award is the result of a competitive acquisition and one offer was received. No funds will be obligated at the time of award. Fiscal 2018, research, development, test and evaluation funds will be obligated on the initial task order. Air Force Research Laboratory, Wright-Patterson AFB, Ohio, is the contracting activity (FA8650-19-D-6993). L-3 Communications, Greenville, Texas, has been awarded a $7,298,360 cost-plus-fixed-fee modification to contract FA8620-11-G-4026 for advanced engineering services. The contract modification is for additional engineering efforts. Work will be performed in Greenville, Texas, and is expected to be completed by Aug. 31, 2019. This contract involves 100 percent foreign military sales (FMS). This award is the result of a sole-source acquisition. FMS funds in the amount of $7,298,360 are being obligated at the time of award. Total cumulative face value of the contract is $59,019,376. The 645th Aeronautical Systems Group, Wright-Patterson Air Force Base, Ohio, is the contracting activity. NAVY Canadian Commercial Corp., Ontario, Canada, is awarded a $9,999,999 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for the refurbishment and manufacturing of the TR-343 transducer tube assemblies in support of the repair of TR-343 sonar transducers. The transducer tube assemblies are a critical component of the TR-343 transducer used in the AN/SQS-53C hull-mounted sonar array subsystem for the AN/SQQ-89(V) acoustic sonar weapons system. Work will be performed in Toronto, Canada, and is expected to be completed by November 2023. Fiscal 2016 shipbuilding and conversion (Navy); and fiscal 2019 working capital fund funding in the amount of $1,127,528 will be obligated at time of award and will not expire at the end of the current fiscal year. This contract was competitively procured through the Federal Business Opportunities website, with two offers received. The Naval Surface Warfare Center, Crane Division, Crane, Indiana, is the contracting activity (N0016419DGP35). *Small Business https://dod.defense.gov/News/Contracts/Contract-View/Article/1685262/source/GovDelivery/

Shared by members

  • Share a news article with the community

    It’s very easy, simply copy/paste the link in the textbox below.

Subscribe to our newsletter

to not miss any news from the industry

You can customize your subscriptions in the confirmation email.