May 14, 2024 | International, Security
New Chrome Zero-Day Vulnerability CVE-2024-4761 Under Active Exploitation
Google has released emergency fixes for a new zero-day vulnerability (CVE-2024-4761) that has been actively exploited in the wild.
September 18, 2019 | International, Land
STERLING HEIGHTS, Mich.--(BUSINESS WIRE)--The U.S. Army has awarded BAE Systems a $318 million contract to upgrade M88 recovery vehicles to the M88A3 configuration designed for single-vehicle recovery of the latest version of the Abrams tank. The new M88A3 configuration eliminates the necessity of using two vehicles to raise and move the tanks, which have increased in weight in recent years.
“As the U.S. Army's primary recovery vehicle, the M88 plays a critical role in the Army's Armored Brigade Combat Team,” said Dennis Hancock, recovery programs director for BAE Systems' Combat Vehicles business. “We have partnered closely with the Army and industry partners to develop a solution that addresses the single-vehicle recovery gap. We are proud to continue to support the Army's recovery needs by providing a next-generation solution to effectively rescue disabled tanks from the battlefield.”
The M88A3 configuration features an upgraded powertrain, suspension and tracks, increasing the vehicle's speed, survivability and reliability. The M88A3 also features a seventh road wheel to reduce ground pressure and new hydropneumatic suspension units (HSUs) that enable the track to be locked out for greater control when recovering vehicles.
The contract is being awarded under an Other Transactional Authority (OTA) acquisition model for upgrading the M88A2 Heavy Equipment Recovery Combat Utility Lift Evacuation System (HERCULES) to the next generation M88A3 HERCULES.
BAE Systems' M88 family of recovery vehicles has provided the Army with unprecedented capability for recovering stranded or disabled combat vehicles since the 1960s. Due to incremental weight increases of the Army's Main Battle Tank over the years, the M88A3's predecessor, the M88A2, is currently unable to safely perform single-vehicle recovery of the Abrams. BAE Systems has invested Independent Research and Development to develop the M88A3 for three years in an effort to identify, understand, and provide solutions to return to single-vehicle recovery of the tank.
The work will be performed at BAE Systems' facilities in York, Pennsylvania; Aiken, South Carolina, Anniston, Alabama, and Sterling Heights, Michigan.
May 14, 2024 | International, Security
Google has released emergency fixes for a new zero-day vulnerability (CVE-2024-4761) that has been actively exploited in the wild.
February 23, 2021 | International, Naval
The head of Austal USA resigned Monday amid U.S. and Australian investigations into a 2016 loss posted by the company.
July 26, 2019 | International, Aerospace, Naval, Land, C4ISR, Security, Other Defence
DEFENSE LOGISTICS AGENCY GSL Solutions Inc., Vancouver, Washington, has been awarded a maximum $450,000,000 firm‐fixed‐price, indefinite‐delivery/indefinite‐quantity contract for automated pharmaceutical equipment, accessories, maintenance and training under the Patient Monitoring and Capital Equipment Program. This is a five-year base contract with one five‐year option period. This was a competitive acquisition with 36 responses received. Location of performance is Washington, with a July 23, 2024 performance completion date. Using customers are Army, Navy, Air Force, Marines and federal civilian agencies. Type of appropriation is fiscal 2019 through 2024 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE2D1‐19‐D‐0016). Crown Clothing Co., Vineland, New Jersey, has been awarded a maximum $12,386,162 modification (P00009) exercising the first one-year option period of a one-year base contract (SPE1C1-18-D-1079), with four one-year option periods for men's coats and replacement collars. This is a fixed-price contract. Location of performance is New Jersey, with an Aug. 8, 2020, performance completion date. Using military service is Marine Corps. Type of appropriation is fiscal 2019 through 2020 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania. FN America LLC, Columbia, South Carolina, has been awarded a maximum $10,589,029 firm-fixed-price contract for receiver cartridges. This was a competitive acquisition with two responses received. This is a five-year contract with no option periods. Location of performance is South Carolina, with a July 26, 2024, performance completion date. Using military service is Army. Type of appropriation is fiscal 2019 through 2024 Army working capital funds. The contracting activity is the Defense Logistics Agency Land and Maritime, Warren, Michigan (SPRDL1-19-D-0112). Communications & Power Industries, Palo Alto, California, has been awarded a maximum $7,050,384 firm-fixed-price contract for electron tubes. This was a sole-source acquisition using justification 10 U.S. Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a three-year contract with no option periods. Location of performance is California, with a June 23, 2022 performance completion date. Using military services are Army, Navy, Air Force and Marine Corps. Type of appropriation is fiscal 2019 through 2021 defense working capital funds. The contracting activity is Defense Logistics Agency Land and Maritime, Columbus, Ohio (SPE7LX-19-D-0169). NAVY Data Link Solutions LLC, Cedar Rapids, Iowa, is awarded a maximum potential value $62,300,000 modification to a previously awarded indefinite-delivery/indefinite-quantity multiple award contract (N00039-15-D-0042) for the Block Upgrade II retrofit of Multifunctional Information Distribution System (MIDS) low volume terminals. The terminals provide secure, high-capacity, jam-resistant, digital data and voice communications capability for Navy, Air Force and Army platforms. Work will be performed in Wayne, New Jersey (50%); and Cedar Rapids, Iowa (50%). Work is expected to be completed by December 2026. No funding is being obligated on the contract at the time of award. Contract actions will be issued and funds obligated as individual delivery orders are issued. This contract modification was not competitively procured because it is a sole source acquisition pursuant to the authority of 10 U.S. Code 2304(c)(1) - only one responsible source (Federal Acquisition Regulation, subpart 6.302-1). The Naval Information Warfare Systems Command, San Diego, California, is the contracting activity and awarded the contract on behalf of the MIDS Program Office. Lockheed Martin Rotary and Mission Systems, Manassas, Virginia, is awarded a $27,425,442 for firm-fixed-price delivery order N00024-19-F-5632 under previously awarded contract N00024-15-D-5217 for 165 Technical Insertion Sixteen (TI-16) Common Display System (CDS) Variant A water-cooled production consoles. The CDS is a set of watch station consoles designed to support the implementation of Open Architecture in Navy combat systems. The TI 16 CDS is the next evolution in the CDS family and consists of a three-eyed horizontal display console. This delivery order combines purchases for the Navy (85%); and the government of Japan (15%) under the Foreign Military Sales (FMS) program. Work will be performed in Johnstown, Pennsylvania, and is expected to be complete by March 2020. Fiscal 2018 other procurement (Navy); fiscal 2014, 2016 and 2017 shipbuilding and conversion (Navy); and FMS Japan funding in the amount of $26,935,062 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity. ARMY Baysinger-Bric JV,* Marion, Illinois (W91248-19-D-0005); Johnson-McAdams Firm P.A.,* Greenwood, Mississippi (W91248-19-D-0004); and American Engineers Inc.,* Glasgow, Kentucky (W91248-19-D-0006), will compete for each order of the $15,000,000 firm-fixed-price contract for architect and engineering design services that include preparation of designs, plans, specifications and cost estimates for various projects at Fort Campbell, Kentucky; and Fort Sill, Oklahoma. Bids were solicited via the internet with three received. Work locations and funding will be determined with each order, with an estimated completion date of July 31, 2024. U.S. Army Mission Installation Contracting Command, Fort Campbell, Kentucky, is the contracting activity. *Small Business https://dod.defense.gov/News/Contracts/Contract-View/Article/1915574/