Back to news

October 20, 2022 | International, Aerospace

Turkey, Kazakhstan deepen relations in space tech, drone production

A new memorandum of understanding calls for the co-production of satellites and subsystems, including space-observation capabilities.

https://www.c4isrnet.com/space/2022/10/20/turkey-kazakhstan-deepen-relations-in-space-tech-drone-production/

On the same subject

  • Navy aims to hasten remaining Columbia sub work in case of test delays

    October 23, 2023 | International, Naval

    Navy aims to hasten remaining Columbia sub work in case of test delays

    To hedge against first-in-class test delays, the Navy wants to build back a schedule buffer for the District of Columbia.

  • Army preps for competition limited to Bell and Sikorsky for long-range assault helicopter

    December 11, 2020 | International, Aerospace, Land

    Army preps for competition limited to Bell and Sikorsky for long-range assault helicopter

    By: Jen Judson WASHINGTON — The Army is taking its final steps before starting a competition to acquire a Future Long Range Assault Aircraft, and has done so by issuing an intent to solicit bids using means “other than full and open competition,” according to a Dec. 9 post on on the government contracts website Beta.Sam.Gov. This step means that unless a surprise vendor can meet all of the Army's technical and production requirements for FLRAA in the next two weeks, the future aircraft will be supplied by either Bell or Lockheed Martin's Sikorsky. Bell and a Sikorsky-Boeing team have been pitted against one another for years to build and fly technology demonstrators to inform requirements ahead of the FLRAA competition and both are part of a competitive demonstration and risk reduction phase. Bell's V-280 Valor tiltrotor had it's first flight nearly three years ago and Sikorsky and Boeing's SB-1 Defiant coaxial helicopter flew for the first time in March 2019. The draft request for proposals is expected to be released by the end of the year with a final solicitations expected in fiscal 2021. Modernizing its vertical lift fleet is the Army's third highest priority behind Long-Range Precision Fires and Next-Generation Combat Vehicle development. The Army intends to field both a FLRAA and Future Attack Reconnaissance Aircraft by roughly FY30. Bell and Lockheed Martin are also competing against each other in the FARA competition. Bell's offering is the 360 Invictus and Lockheed's entry is the Raider X. In the case of FLRAA, the winner must build eight production aircraft for the first unit equipped by FY30. The plan is to award a contract to a winner in FY22. The winner will proceed to deliver a preliminary design review roughly eight months following the award. According to the pre-solicitation, “the Army has determined through extensive market research, including a July 2020 sources sought, that only two sources exist in the market space that have the capability and capacity of developing, manufacturing, testing and delivering both prototype and initial production FLRAA in the time allocated to achieve the Army's goal of an FUE in FY 2030.” The Army stated that Bell and Sikorsky are those two sources, but notes that “any other responsible, qualified sources, ... that can develop and produce the FLRAA weapon system to achieve First Unit Equipped (FUE) no later than 2030 are encouraged to full identify their interest and capabilities in accordance with the requirements,” within 15 days after publication of the pre-solicitation. Such a vendor would need to deliver a preliminary design review in FY22, start building prototype aircraft in the third quarter of FY23 and eight production aircraft by 2030. Vendors must also prove they are able to build 24 aircraft per year at full-rate production. Those aircraft must be able to fly at 2,000 feet pressure altitude in 85 degree heat with a full payload that consists of 12 troops at 290 lbs each and four crew at 281 lbs each. When the draft RFP drops, it is likely to contain a schedule to deliver air vehicle prototypes and mission systems. The Army was debating between two schedule options to deliver prototypes by roughly mid-2026. The FLRAA program has strong support from Congress. This year's annual defense policy bill authorized $5 million in increased investment in FLRAA advanced component development and prototyping on top of the Army's nearly $648 million request. The FY21 spending bill has yet to go through conference committee, but both the House and Senate proposed additional funding for FLRAA. The House Appropriations Committee proposed a $20 million increase while the Senate Appropriations Defense Subcommittee proposed a $79 million addition. Lawmakers added $76 million in funding to FLRAA's top line in FY20 to drive down technical risk and speed up delivery through the competitive demonstration and risk reduction effort. In FY20, Congress cut $34 million from the Army's other future vertical lift effort — the FARA program — which threatened the service's ability to provide some of its government-furnished equipment to competitors chosen to build and fly prototypes. The Army is supplying its new Improved Turbine Engine Program engine, a 20mm gun, an integrated munitions launcher and its modular open-systems architecture. The Army has since shored up that funding, according to service aviation leadership. https://www.defensenews.com/land/2020/12/10/army-preps-for-competition-limited-to-bell-and-sikorsky-for-long-range-assault-helicopter/

  • New European Defence Agency boss warns against ‘rash’ budget cuts by EU members

    June 23, 2020 | International, Aerospace, Naval, Land, C4ISR, Security

    New European Defence Agency boss warns against ‘rash’ budget cuts by EU members

    By: Martin Banks BRUSSELS — The new head of the European Defence Agency, Jiří Šedivý, has thrown down the gauntlet to European Union member states, telling them: “It is up to you to deliver.” In an interview with Defense News, he said the onus is on EU countries “to use the EDA to its full extent.” Šedivý has extensive experience in the defense domain, having served as defense minister and deputy defense minister of the Czech Republic, NATO assistant secretary general for defense policy and planning, and permanent representative of the Czech Republic to NATO. His term comes amid a fast-changing European defense landscape and new EU defense initiatives that are under increasing pressure to deliver results. How will the COVID-19 health crisis affect European defense spending in the near, mid and long term? Let's be realistic: We are still in the middle of the pandemic and, at this stage, nobody can foresee what its exact repercussions will be. But being realistic also means that we have to anticipate, already now, that national and European defense budgets might come under pressure as a result of the massive economic and financial costs of COVID-19, whether we like it or not. Here our answer should be straightforward: Rather than cutting national defense expenditure rashly, let's coordinate, pool and share our resources and invest more in collaborative capability development because a collective approach is much more cost-effective than national solo efforts. The same goes for defense research where national ministries of defense might face problems to receive the same funding than in the past to finance their individual national programs. The best response to shrinking national budgets for defense research is to join forces and resources and to engage in more cost-effective collaborations at EU level. We therefore should maintain our European defense ambitions, keep course and pursue the implementation of the new EU defense instruments — the Coordinated Annual Review on Defence (CARD), the Permanent Structured Cooperation (PESCO) and the European Defence Fund (EDF) — which are all in place, fit for purpose and ready to be used. The COVID-19 crisis could offer us an unexpected and unique opportunity to reinvigorate defense cooperation in Europe. The defense portion of the proposed EU budget has come under pressure. If the European Defence Fund is indeed curtailed, how do you expect EDA to adjust its objectives? It is too early to speculate about the Fund's future budget allocation as negotiations are still ongoing. Therefore, we have to wait and see. This being said, the EDF will be an essential part of the EU's defense-cooperation toolbox, together with CARD and PESCO. Therefore, it is crucial that the Fund receives the financial means it needs to play its role properly. I thus hope for adequate funding for this important collaborative tool because for the reasons I just explained, we need more defense cooperation in the future, not less. And the Fund will serve not only as an incentive to that end, but also as a point of leverage for economic recovery. In any case, EDA's activities are not directly linked or dependent of the Fund's budget as we are an intergovernmental agency entirely and directly funded by our member states, not through the EU budget. U.S. defense companies want to be allowed to compete for EDF money and PESCO participation. How do you believe it is possible to strengthen intra-EU defense cooperation without shutting out trans-Atlantic ties at the same time? Third-party participation in the EDF is among the topics currently discussed between member states, the Commission and the European Parliament as part of the legislative process on setting up of Fund. So the jury is still out on the outcome of these talks. EDA is not involved in that process and therefore I cannot comment. However, I want to recall a basic underlying principle of European defense cooperation, namely that the European Union is fully committed to working with the U.S. as a core partner in security and defense matters. The EU defense initiatives must be understood in this context: They are not directed against our trans-Atlantic partnership but aim to enhance Europe's contribution to our common trans-Atlantic security by sharing a greater part of the burden. PESCO and EDF will help enhance EU member states' investment in the joint development of defense capabilities and deepen cooperation to make more efficient use of defense spending in the EU. The resulting defense capabilities will not be owned by the EU but by its member states. Which means they will also be available to NATO, at least for those EU member states that are NATO allies. As a result, EU cooperation ultimately also strengthens NATO as well as our trans-Atlantic partners. What is in store for the dozens of PESCO projects currently underway? For example, do you expect new ones to join the roster at some point, or some to be canceled if they fail to deliver? As you know, PESCO is a member states driven initiative. It's therefore up to the 25 participating countries to decide whether they want to launch new collaborative projects in the future. If you ask me, I expect indeed more projects to be added in the future but not this year as it was decided to skip 2020 after three consecutive waves of new projects launched — 47 in total to date — since December 2017, when PESCO was established. Focusing on the project implementation and delivering tangible outputs is thus the priority now. Equally, it is up to the member states involved in a given project to decide about possible changes or adjustments to be made or, to answer your question, even to cancel a project that would fail to deliver. It's the member states who own the projects, so it is up to them to implement them in the way they want. This being said, EDA is available and keen to support them, if they wish, in the implementation. As the European hub for collaborative capability development, we have the expertise and experience needed to do that. We therefore encourage member states to make full use of the Agency and to seek our know-how and support for bringing their PESCO projects forward. And we see that they start to rely more and more on our help. The number of PESCO projects which have been or currently are supported by the agency has constantly increased and now stands at six; two of them (in the areas of CBRN surveillance and deployable underwater capabilities) as EDA projects. Judging from informal expressions of interest received, we have reasons to expect those numbers to further grow in the future. https://www.defensenews.com/global/europe/2020/06/22/new-european-defence-agency-boss-warns-against-rash-budget-cuts-by-eu-members/

All news