Back to news

April 26, 2019 | International, Aerospace

Troubled Lockheed Helicopter Needs New Review, Inhofe Tells Pentagon

By

The Pentagon needs to undertake another review of Lockheed Martin Corp.'s $31 billion CH-53K heavy lift helicopter program amid continuing technical problems and delays, according to the chairman of the Senate Armed Services Committee.

Republican Senator James Inhofe said the importance of the CH-53K King Stallion to the Marine Corps means that a “comprehensive, independent update” on the long-delayed program is overdue. Inhofe's role leading the committee that authorizes defense spending means his request will almost certainly be heeded.

“We need to get it right, and this report should give us a current assessment and reestablish a baseline for the program to ensure taxpayer dollars are spent wisely,” Inhofe said in a statement to Bloomberg News. The senator cited concern that the chopper “is more than a year behind schedule and has over 100 outstanding deficiencies that still require resolution.”

Full story: https://www.bloomberg.com/news/articles/2019-04-25/troubled-lockheed-copter-needs-new-review-inhofe-tells-pentagon

On the same subject

  • Raytheon wins $178 million contract to support Air Force intel-sharing system

    March 15, 2021 | International, Aerospace, C4ISR

    Raytheon wins $178 million contract to support Air Force intel-sharing system

    In addition to providing field support to the Air Force's Distributed Common Ground System, Raytheon will help transition the system of systems to an open architecture.

  • China’s stealth fighter goes into mass production after thrust upgrade

    July 13, 2020 | International, Aerospace, Naval, Land, C4ISR, Security

    China’s stealth fighter goes into mass production after thrust upgrade

    The J-20B has overcome agility problems to finally be considered a fully fledged fifth-generation fighter, military source says Aircraft still will be fitted with Russian engine but ‘Chinese version could be ready in a year or two' A modified version of China's first stealth fighter jet, the J-20, has formally entered mass production, with upgrades earning it a place as a fifth-generation fighter jet, according to a military source close to the project. The moment was marked at a ceremonial unveiling of the modified J-20B stealth fighter jet on Wednesday attended by many senior military leaders including Central Military Commission (CMC) vice-chairman General Zhang Youxia, the source said. Zhang is the second-ranked vice-chairman of the CMC and is in charge of weapons development for the People's Liberation Army. “Mass production of the J-20B started on Wednesday. It has finally become a complete stealth fighter jet, with its agility meeting the original criteria,” the source said. “The most significant change to the fighter jet is that it is now equipped with thrust vector control.” Thrust vector control (TVC) allows pilots to better control the aircraft by redirecting engine thrust. In 2018, China debuted its J-10C multirole fighter – fitted with a WS-10 Taihang engine – at the China air show in Zhuhai, putting the aircraft through its paces in a performance that indicated that China had succeeded in thrust technology. While the TVC technology had been applied to the stealth fighter, the J-20B would still use Russian Saturn AL-31 engines because more work needed to be done on China's WS-15 engine, the source said. Chinese engineers have been developing high-thrust turbofan WS-15 engines for the J-20, but that work has fallen behind schedule. “The Chinese engine designed for the J-20s still failed to meet requirements, but its development is going quite smoothly, and it may be ready in the next one or two years,” the source said. “The ultimate goal is to equip the J-20B fighter jets with domestic engines.” China was thought to have built about 50 J-20s by the end of 2019, but problems with the jets' engines delayed further production plans. Meanwhile, Lockheed Martin's Fort Worth assembly plant in Texas delivered 134 F-35 stealth fighters in 2019, three more than its target and 47 per cent more than its output in 2018, according to the company. China's first batch of J-20s entered service in 2017 when the US decided to deploy more than 100 F-35s to Japan and South Korea that year. The J-20 was meant to be a fifth-generation fighter jet on a par with Lockheed's F-22 Raptor and F-35 Lightning multirole strike fighters. Fifth-generation fighters are defined by their stealth technology, supersonic cruising speed, super manoeuvrability, and highly integrated avionics. But the earlier version of the J-20 was described by Western media as a “dedicated interceptor aircraft” because of its lack of agility. “The launch of the J-20B means this aircraft now is a formal fifth-generation fighter jet,” the military source said, adding that Chengdu Aerospace Corporation (CAC), which manufactures the J-20s, had received “heavy orders” from the PLA. CAC set up its fourth production line in 2019, each one with a capacity to make about one J-20 a month. https://www.scmp.com/news/china/military/article/3092839/chinas-stealth-fighter-goes-mass-production-after-thrust

  • Army validates design for future helicopter engine, remains on track despite COVID

    August 13, 2020 | International, Aerospace, Land

    Army validates design for future helicopter engine, remains on track despite COVID

    By: Jen Judson WASHINGTON — The Army has validated its design for its future helicopter engine, and the program remains on schedule to deliver the first engine for testing in the fourth quarter of fiscal 2021, according to service officials in charge of the effort. The Improved Engine Turbine Program (ITEP) has seen a long — and often delayed — journey as the service wrestled with funding and development strategies for several years. ITEP will replace current engines in both UH-60 Black Hawk utility helicopters and AH-64 Apache attack helicopters Since awarding a contract to General Electric Aviation in February 2019, the program has pushed forward on schedule, despite a protest from a competing team comprised of Honeywell and Pratt & Whitney, which paused work for roughly three months. And, while the Coronavirus pandemic caused some anxiety among Army officials trying to keep the program on track, those in charge were able to complete the critical design review, conducted 100 percent virtually, according to Army spokesman David Hylton. The ITEP Critical Design Review (CDR) was a multi-month process that consisted of three phases, Hylton told Defense News in a written statement. The engine control system component CDR was completed on June 5, followed by the software CDR on July 17 and the engine systems CDR on July 24, he said. The Army and GE are making “tremendous efforts to keep COVID-19 impacts from delaying the program,” Hylton wrote. GE is now working toward a test readiness review ahead of the first engine test. “We are full steam ahead in terms of understanding where we need to go next with respect to the design, Col. Gregory Fortier, who is in charge of the program office for the Army's Future Attack Reconnaissance Aircraft, said during a media briefing last month. The Army has “no reason to believe we will not fly” in fiscal 2023, he said. According to FY21 Army budget request justification documents, the service plans to fly an aircraft with an ITEP engine installed in the first quarter of FY23 followed by a low-rate initial production decision in the fourth quarter of FY24. A full-rate production decision is expected in FY26. https://www.defensenews.com/land/2020/08/12/army-validates-design-for-future-helicopter-engine-remains-on-track-despite-covid/

All news