Back to news

June 20, 2024 | International, Land

Tool Overload: Why MSPs Are Still Drowning with Countless Cybersecurity Tools in 2024

Discover how MSPs in 2024 are coping with tool overload in cybersecurity. Explore integrated solutions like Guardz to streamline operations and boost

https://thehackernews.com/2024/06/tool-overload-why-msps-are-still.html

On the same subject

  • US Air Force demonstrates increasing F-35 capabilities

    January 9, 2020 | International, Aerospace

    US Air Force demonstrates increasing F-35 capabilities

    A little more than four years after receiving their first combat-coded F-35A Joint Strike Fighter aircraft, Hill Air Force Base's fighter wings have achieved full warfighting capability – shedding light on the future of the RAAF's future air combat capability. The term describes a set of focus areas within the 388th and 419th Fighter Wings: fully trained pilots and maintainers, a full complement of 78 aircraft and the mission and support equipment needed to fly. While the designation of full warfighting capability is an important milestone, the wing has been combat capable since the Air Force declared initial operational capability in August 2016. Since then, the wings have participated in several large combat exercises, deployed twice to Europe and once to the Pacific and supported two Middle East combat deployments, including one short-notice tasking. Colonel Steven Behmer, 388th Fighter Wing commander, explained, "Every training opportunity, exercise and deployment we've completed over the past four years has been a key stepping stone in reaching full warfighting capability. "This is just the beginning of sustained F-35A combat operations and we will remain focused on staying ready to deploy whenever, wherever we're needed." The first F-35As arrived at Hill AFB in September 2015 and the final aircraft arrived in December 2019. In the intervening years, airmen at Hill AFB have been training and developing tactics as the aircraft systems and capabilities have matured. Reaching the right balance of qualified manning can be a challenge when activating a brand-new weapon system. The first squadron to stand up, the 34th Fighter Squadron, started with a core of pilots who had some level of F-35A training and experience in other platforms. As the wing began to grow, that experience level was diluted, and each squadron has been through a period where a majority of pilots could be considered "inexperienced wingmen". When the first jets arrived at Hill AFB, about 50 per cent of the maintainers were fully-trained, seasoned F-35 maintainers from Eglin Air Force Base, Florida, and Luke Air Force Base, Arizona. That number decreased due to PCS, retirements and separations. Since then, there has been an influx of new manning with less experience, and every other maintainer has been “homegrown”. "We really relied on our more experienced personnel, and as we received more aircraft, spread them throughout the group to train and equip the next F-35A aircraft maintenance units the right way. When you have the right mix of leadership, with the right focus, they can empower their people and everyone develops maintenance capability quickly," explained Colonel Michael Miles, 388th Maintenance Group Commander. When the first aircraft arrived in 2015, the goal was to fully equip each squadron with 24 primary assigned aircraft and six backups by the end of 2019. That was realised in December with the delivery of the 78th jet. Over that four-year period, the wings received roughly two jets every month and immediately began putting them to use. In the spring of 2016, the 34th FS deployed six jets to RAF Lakenheath, UK. In some cases, the delivery process became so streamlined that the aircraft were able to fly combat training missions within 24 hours of arriving at Hill AFB. This was more than just convenient. It meant that it was possible to deliver a jet from the factory straight into combat if necessary. Fifth-generation technology on the F-35A requires more specialised equipment than legacy aircraft. Every system on the F-35A has an associated piece of equipment to keep aircraft loaded, fueled and flying. There are more than a dozen critical pieces of heavy equipment, from the standard – power generators and weapons loaders, to the unique – 5.8 ton air conditioners to cool the jet's advanced avionics. There's also other equipment – like the high-tech, personalised helmets that integrate with the jet's mission systems – and computer and network systems to support flying and maintenance. COL Miles explained the importance of the milestone: "At IOC (initial operational capability), we had the equipment to support one squadron that could do some semblance of combat operations. Now, as each squadron has progressed, and we're on track to have all the required assets, we demonstrated that we can rely on the program for the technical support and weapons system parts we need while we deployed all our squadrons last summer." In 2019, the wings proved that they could balance the equipment requirements to support all three squadrons away from home station – the 4th FS was deployed to the Middle East, the 421st FS was in Europe and the 34th FS spent two months at Mountain Home AFB, Idaho. In a seven-day span, the wings had aircraft, equipment and personnel operating out of nine different countries. "Through hard work, providing programmatic feedback, and developing new processes and procedures, we shaped and pushed the program. Each airmen can look back with pride and see their contributions over the last four years standing up this wing, and enabling F-35A combat capability for our country," COL Miles added. https://www.defenceconnect.com.au/strike-air-combat/5388-us-air-force-demonstrates-increasing-f-35-capabilities

  • China-Linked TAG-112 Targets Tibetan Media with Cobalt Strike Espionage Campaign

    November 23, 2024 | International, C4ISR, Security

    China-Linked TAG-112 Targets Tibetan Media with Cobalt Strike Espionage Campaign

    TAG-112 hacks Tibetan websites, using fake TLS certificates to deliver Cobalt Strike malware payloads.

  • German spat over Airbus could spoil fighter fest at Paris Air Show

    June 10, 2019 | International, Aerospace

    German spat over Airbus could spoil fighter fest at Paris Air Show

    By: Sebastian Sprenger COLOGNE, Germany — A lingering dispute between German lawmakers and Airbus could nix immediate plans to move forward with a future Franco-German-Spanish fighter aircraft, Defense News has learned. The kerfuffle goes back to a February request for information by members of the Bundestag's Budget Committee. Citing the government's role as a major shareholder in the company, lawmakers called on the administration to provide in-depth information about Airbus locations, programs and management equities throughout Europe. Airbus is one of two prime contractors for the Future Combat Air System, an ambitious project to field a sixth-generation fighter aircraft by 2040. The envisioned weapon also includes new sensors, drones and a complex data infrastructure, making it Europe's preeminent industrial project for decades to come. Lawmakers in Berlin are worried that German defense-industry interests, presumably channeled through Airbus, could get the short shrift once substantial contracts are up for grabs amid French competition, led by Dassault. The Budget Committee reiterated its request for the company deep dive on June 5, when members approved the initial batch of funds for the FCAS program: $37 million for a study on propulsion options. Lawmakers inserted a note into their approval text that makes answering the February request a condition for entering into follow-on agreements with France. Meanwhile, officials in Paris and Berlin have been planning signing ceremonies for such pacts with Ursula von der Leyen and Florence Parly, the German and French defense ministers, respectively, at the Paris Air Show in mid-June. It's expected the pair will ink the concept study plan and a key governance document called the framework agreement. Meanwhile, the Spanish defense minister, Margarita Robles, is expected to be on hand to sign the program's memorandum of understanding, a more high-level, vague text beginning Madrid's road to full participation. As of Friday, lawmakers had yet to receive the requested information on Airbus, which is to include an analysis of management personnel down to the third tier throughout different locations, separated by programs and individual job functions. As June 10 is federal holiday in Germany, that leaves four business days next week before the Paris Air Show begins. An Airbus spokesman told Defense News on Friday the company is working to resolve the issue and is coordinating with the government. A Defence Ministry spokesman did not immediately return an emailed request for comment. Documents obtained by Defense News suggest that a previous back-and-forth between the Budget Committee and Airbus, through the Ministry for Economic Affairs and Energy, left a bit of bad blood, raising the question of whether the company will comply at all. While executives provided some information — forwarded in a confidential letter to the Bundestag by the ministry on April 26 — Airbus largely claims the detailed data demanded by the committee would needlessly reveal competitive secrets. “Airbus, in return, asks for information about the background of the request,” the company's written response states. “The question must be raised whether other companies where the German government is a shareholder, like Deutsche Bahn [the German rail service], is subject to similar requests.” The company claims to have given the administration a detailed personnel breakdown by subsidiary and nationalities in 2018, which was also offered to committee members. According to Airbus, no lawmakers were interested. Airbus Defence and Space, which would lead the conglomerate's work on FCAS, is based in Ottobrunn near Munich, Germany. As of December 2018, roughly 40 percent of the subsidiary's employees were based in Germany, around 22 percent in France, 27 percent in Spain and 12 percent in the United Kingdom, the company wrote to lawmakers in April. As the FCAS program progresses, Budget Committee members want the government in Berlin to safeguard a 50-50 cost and workshare plan with France. https://www.defensenews.com/global/europe/2019/06/07/german-spat-over-airbus-could-foil-fighter-fest-at-paris-air-show/

All news