Back to news

March 12, 2019 | International, Land

The new Army program to train soldiers to fight underground

In the modern battlefield, troops might have to fight an enemy in the vast subways and water systems underneath huge cities, or in the pitch-black tunnels guarding the North Korean defensive line. A new Army program aims to get them ready. (Ben Murray/Military Times)

https://www.militarytimes.com/newsletters/tv-next-episode/2019/03/04/the-new-army-program-to-train-soldiers-to-fight-underground/

On the same subject

  • L’EuroFighter assemblé en Suisse ? La proposition d’Airbus pour décrocher le contrat à 5,5 milliards d’euros

    June 28, 2021 | International, Aerospace

    L’EuroFighter assemblé en Suisse ? La proposition d’Airbus pour décrocher le contrat à 5,5 milliards d’euros

    Le constructeur européen ajoute une corde à son arc dans la course à ce contrat qui porte sur 30 à 40 appareils de combat. , Airbus a décidé de frapper fort pour rafler le contrat suisse, rapporte La Tribune.

  • Sikorsky ratchets up robotic control of Black Hawk in runup to pilotless flight

    October 11, 2019 | International, Aerospace

    Sikorsky ratchets up robotic control of Black Hawk in runup to pilotless flight

    Sikorsky has dialed up the autonomous flight control system on an experimental UH-60A Black Hawk to where a pilot can “set it and forget it” during long surveillance missions, another step toward flying the aircraft remotely from the cabin or from the ground without pilots on board. To date, Sikorsky has put 54.5 flight hours on its optionally piloted vehicle (OPV) flight control system, which is designed as a kit that replaces all legacy mechanical controls in existing aircraft with its MATRIX autonomous fly-by-wire controls. It has also run about 30 hours on the ground in the UH-60A, one of the oldest Black Hawks in the Army's inventory, according to chief test pilot Mark Ward. During the first of MATRIX in a Black Hawk in May, Sikorsky focused on the direct mode control scheme, which means the fly-by-wire controls should fly and respond to pilot input like a conventional UH-60 Black Hawk, Ward said. Technically, the mode is “direct stick-to-head with stability augmentation in the loop.” “Direct mode is supposed to be, more-or-less the service mode or an emergency mode, but we found the aircraft behaved quite well throughout all the speed regimes in that mode,” he said. Sikorsky briefly paused the flight test program to “fine tune” some of the pilot control augmentation modes, “so that when we go to autonomy we're going to have a very mature system that goes from full-spectrum of pilot 100 percent in the loop, to autonomy 100 percent in the loop and everywhere in between,” he said. Test pilots have since ratcheted up computer control of the aircraft and expanded the flight envelope out to 150 knots indicated airspeed. Most interestingly, the test team is beginning to increase the level of flight control augmentation beginning with “direct mode.” In “rate command attitude hold” mode, the fly-by-wire system takes over more control of the aircraft, Ward said. That mode was tested through low-speed hover maneuvers out to 150 knots. “When you put a control input, you're controlling a rate or an attitude change and when you release the control, you're capturing that attitude,” he said. From there, test pilots increased autonomous control of the aircraft to the full authority control scheme, or FACS, in which “rather than commanding a rate, you're actually commanding a parameter, such as airspeed or altitude or heading using the control stick,” Ward said. “To change from one mode to the next is simply a button push away to go from direct to rate command, up to FACS and back down,” he said. “Think of full authority as being an ultra-stable ISR platform that is going to be holding flight parameters for very long periods of time,” he said. “You kind of want to set it and forget it. You're not turning knobs on a flight director. You are actually flying the aircraft with the control stick.” “Rate command is when you kind of want to . . . throw it around a little bit, you want to do some low-and-slow or low-and-fast maneuvering where you're going from stop to stop to complete a mission.” Sikorsky uses the phrase “optimally piloted vehicle” as well as “optionally piloted vehicle” when discussing OPV and MATRIX because the ultimate goal is to develop a system that can act as an autonomous co-pilot quietly but constantly aiding human operators during specific missions. The OPV kit is tailored to the UH-60, but is retrofittable onto the Army's entire helicopter fleet and Sikorsky's commercial S-92 and S-97 rotorcraft, according to Igor Cherepinsky, the company's director of autonomy. Sometime in 2020, Sikorsky will demonstrate that the system can be remotely piloted from both inside and outside the aircraft, he said. “We will show the world this system is capable of being operated from the ground,” he said. Sikorsky continues to demonstrate MATRIX on a modified S-76B called the Sikorsky Autonomy Research Aircraft (SARA). The aircraft, which has been in test since 2013, has more than 300 hours of autonomous flight. The company announced in March that its S-92 helicopter fleet update will include the introduction of phase one MATRIX technology, which will allow for autonomous landing. The U.S. Army has plans to outfit a UH-60M with the system but is about six months behind Sikorsky's OPV test program. “Our vision is, obviously, not to replace the pilots, but to augment the pilots,” Cherepinsky said. “Once we field the technology, we never want to see another controlled flight into terrain or degraded visual environment issue accident ever happen with any of our aircraft.” https://www.verticalmag.com/news/sikorsky-ratchets-up-robotic-control-of-black-hawk-in-runup-to-pilotless-flight/

  • Against Army’s wishes, Congress primes pump to buy newest CH-47 variant for active force

    December 18, 2019 | International, Aerospace

    Against Army’s wishes, Congress primes pump to buy newest CH-47 variant for active force

    By: Jen Judson WASHINGTON — Congressional appropriators and authorizers have increased advance procurement funds for the newest variant of the CH-47 Chinook cargo helicopter as preparation to supply the aircraft to the Army's active force, even though the service asked to only buy a small number of the helos in fiscal 2020 for special operations. The service's decision to cut the aircraft from the active force was based on the need to free up future cash to cover the cost of an ambitious plan to buy two new future vertical lift aircraft for long-range assault and attack reconnaissance missions. But Congress has gone against the Army's wishes to divert funding away from procurement for the active force, instead adding $28 million in FY20 funding — in both the recently released spending and policy bill conference reports — for advance procurement to begin to prime the pump to restore CH-47F Block II deliveries to the conventional Army. The cut the service made would only buy 69 special operations variants — or "G" models. The original plan was to procure 473 "F"-model Block II helicopters for the active force. The Army approved the Block II effort to move into the engineering and manufacturing development phase in April 2017, and the program officially began in July 2017. In October 2018, the first two EMD Block II Chinooks were already on the assembly line with plans to fly in mid-2019. Boeing, which manufactures the aircraft, expects a production decision in July 2021. While $28 million won't get the service much, based on the original plan the Army would start building five CH-47F Block IIs in 2021 meant for the active force. The advance procurement in FY20 would support buying longer-lead items from suppliers, but is still a stretch to claim that the additional funding restores the program. Those five aircraft would be delivered in 2023 based on Boeing's typical three-year lead time to build an airframe. It remains to be seen whether the congressional plus-up will prompt the Army to restore funding for the five CH-47F Block IIs in its FY21 budget request due out early next year. It's also unclear how many of those long-lead parts procured in FY20 could be used in G-model aircraft or are exclusive to F-models. Therefore, it's also murky how much of the $28 million in parts might be wasted if the Army sticks to its plan to only procure G-model aircraft. The Army has indicated it might reconsider the CH-47F Block II cut; the FY21 budget request, when it is released, will likely reveal the Army's decision. Shortly after the service's plan to cut the CH-47F Block II was revealed in its FY20 budget request, then-Army Vice Chief of Staff Gen. James McConville, who is now chief, told reporters the Army was comfortable with its decision, but tempered that, adding: “I think in two to three years, we will have a better idea about where we are, as far as developing the helicopters we talked about, and that will drive the decision.” McConville was referring to the Army's plan to buy two future vertical lift aircraft. The same day, then-Army Secretary Mark Esper, who is now defense secretary, told another group of reporters that the service would not be rethinking its plans to build CH-47 Block IIs for the conventional force. The Army has also claimed it is pursuing foreign military sales of its CH-47F Chinooks to soften the blow from cuts made to its intended buy of the Block II variant, but none of the possible sales — to the United Kingdom or to the United Arab Emirates — were newly in the works at the time. And neither country has plans to buy Block II variants. Moreover, the number of helicopters the two countries plan to procure amount to less than 30 aircraft. https://www.defensenews.com/land/2019/12/17/against-armys-wishes-congress-primes-pump-to-buy-newest-ch-47-variant-for-active-force

All news