Back to news

September 6, 2019 | International, Aerospace

Rafael acquires drone-focused firm in $240M deal

By: Seth J. Frantzman

JERUSALEM — Israeli defense company Rafael Advanced Defense Systems' acquisition of local firm Aeronautics Limited combines the former's expertise in intelligence, surveillance and reconnaissance with the latter's ties to the UAS market.

“We have a strong feeling and understanding that the world is changing and moving more operational requirements toward unmanned vehicles and specifically unmanned aerial vehicles,” said Yuval Miller, executive vice president of aerial and C4I systems divisions at Rafael.

The 850 million shekel (U.S. $240 million) deal has been in the works for more than a year and received approval earlier this year. Under the agreement, announced Sept. 3, Rafael will hold a 50 percent stake in Aeronautics along with businessman Avichai Stolero.

Rafael, which is known for its Iron Dome air defense system, Trophy active protection system, Litening pods and advances in artificial intelligence, sees an advantage in adding UAS to its global strategy. Aeronautics has a portfolio involving 50 countries and a spectrum of UAVs. Rafael says it has in-house capabilities such as sensors, systems and munitions that have been used on fighter jets and other platforms that can pair well with what it describes as Aeronautics' lower-tier UAVs.

Rafael has historically cooperated with other local and foreign companies that make UAVs, such as Elbit Systems and Israel Aerospace Industries. For instance, its RecceLite pod was integrated on General Atomics' Predator B/MQ-9s with the Italian Air Force in 2016. But Rafael noticed even more potential in the platforms made by Aeronautics, including its Orbiter UAV products, such as the Orbiter 3 lightweight drone that has a range of 150 kilometers and is used for intelligence, surveillance, target acquisition and reconnaissance missions.

“These platforms are becoming more robust and their endurance has grown significantly,” Miller said. Indeed, the market is growing in size, to the tune of billions of more dollars in annual spending over the next decade alongside the bolstered capability and and further miniaturization of UAVs.

“This has put us in a position to look for a partner, and we found that Aeronautics, which has an excellent portfolio in 50 countries around the world, and their UAV platforms on the lower tier are world leading, and binding that with Rafael's network and sensor capability looks like excellent synergy,” said Miller, who foresees a fast-growing business with the acquisition.

Rafael plans to maintain Aeronautics as an independent company, which will evolve its business to Rafael's products. The two companies already partnered in acquiring Controp Precision Technologies in 2012. Controp makes electro-optical systems. Rafael envisions a productive meshing with its electro-optics for ISR missions and area surveillance.

“We are talking about onboard advanced image processing and [artificial intelligence], and today that also is available in small and lightweight for lower-tier and low-cost UAVs,” Miller said.

Currently, medium-altitude, long-endurance and high-altitude, long-endurance UAVs are costly, but stronger and smaller drones will evolve and combine more sensors and networks, fusing data for an overall customer gain, according to Rafael.

Rafael did not discuss how it might mesh with Aeronautics' loitering munitions, such as the Orbiter 1K.

The acquisition is part of a growing trend of consolidation in Israel, which saw Elbit acquire former state-owned IMI last year. In 2017 and 2018, Aeronautics was under several investigations that saw its exports restricted and stock price falter. Those hiccups now appear to be behind the firm.

https://www.defensenews.com/industry/2019/09/05/rafael-acquires-drone-focused-firm-is-240m-deal

On the same subject

  • BAE wins Marine Corps contract to build new amphibious combat vehicle

    June 20, 2018 | International, Land

    BAE wins Marine Corps contract to build new amphibious combat vehicle

    Jen Judson WASHINGTON — BAE Systems has won a contract to build the Marine Corps' new amphibious combat vehicle following a competitive evaluation period where BAE's vehicle was pitted against an offering from SAIC. The contract allows for the company to enter into low-rate initial production with 30 vehicles expected to be delivered by fall of 2019, valued at $198 million. The Marines plan to field 204 of the vehicles. The total value of the contract with all options exercised is expected to amount to about $1.2 billion. The awarding of the contract gets the Corps “one step closer to delivering this capability to the Marines,” John Garner, Program Executive Officer, Land Systems Marine Corps, said during a media round table held Tuesday. But the Corps isn't quite done refining its new ACV. The vehicle is expected to undergo incremental changes with added new requirements and modernization. The Corps is already working on the requirements for ACV 1.2, which will include a lethality upgrade for the amphibous vehicle. BAE's ACV vehicle will eventually replace the Corps' legacy amphibious vehicle, but through a phased approach. The Assault Amphibious Vehicle is currently undergoing survivability upgrades to keep the Cold War era vehicle ticking into 2035. BAE Systems and SAIC were both awarded roughly $100 million each in November 2015 to deliver 16 prototypes to the Marine Corps for evaluation in anticipation of a down select to one vendor in 2018. [BAE, SAIC Named as Finalists in Marines ACV Competition] All government testing of the prototypes concluded the first week of December 2017 and the Marine Corps issued its request for proposals the first week in January 2018. Operational tests also began concurrently. Government testing included land reliability testing, survivability and blast testing and water testing — both ship launch and recovery as well as surf transit. Operational evaluations included seven prototypes each from both SAIC and BAE Systems, six participated and one spare was kept for backup. BAE Systems' partnered with Italian company Iveco Defense Vehicles to build its ACV offering. [BAE Systems completes Amphibious Combat Vehicle shipboard testing] Some of the features BAE believed were particularly attractive for a new ACV is that it has space for 13 embarked Marines and a crew of three, which keeps the rifle squad together. The engine's strength is 690 horsepower over the old engine's 560 horsepower, and it runs extremely quietly. The vehicle has a V-shaped hull to protect against underbody blasts, and the seat structure is completely suspended. SAIC's vehicle, which was built in Charleston, South Carolina, offered improved traction through a central tire-inflation system to automatically increase or decrease tire pressure. It also had a V-hull certified during tests at the Nevada Automotive Test Center — where all prototypes were tested by the Marine Corps — and had blast-mitigating seats to protect occupants. The 3rd Assault Amphibian Battalion, 1st Marine Division out of Camp Pendleton, California, is expected to receive the first ACV 1.1 vehicles. https://www.defensenews.com/land/2018/06/19/bae-wins-marine-corps-contract-to-build-new-amphibious-combat-vehicle/

  • Does DoD know how to supply intel for cyber ops?

    July 3, 2018 | International, C4ISR

    Does DoD know how to supply intel for cyber ops?

    By: Mark Pomerleau Cyber has been an official domain of warfare for nearly a decade, yet the Department of Defense is still learning how to integrate it with operations. And some members of Congress are concerned the traditional military intelligence organs to this day don't understand intel support to cyber ops. The House Armed Services Committee is directing that a briefing on the subject must take place by December 1, 2018. The briefing — delivered by the under secretary of defense for intelligence, in coordination with the Defense Intelligence Agency and the military services — is expected, according to a provision in the committee's annual defense policy bill, to address multiple issues, including: Efforts to standardize a common military doctrine for intelligence preparation of the battlefield for cyber operations; Efforts to develop all-source intelligence analysts with the capability to support cyber operations; and Efforts to resource intelligence analysis support elements at U.S. Cyber Command and the service cyber components. “The committee is concerned about the Defense Intelligence Enterprise's ability to provide the cyber community with all-source intelligence support, consistent with the support provided to operations in other domains,” the provision, called an “item of special interest,” says. In some cases, other intelligence disciplines, such as human intelligence or signals intelligence, might be needed to help enable a cyber operation. A committee aide noted that the goal is to get DoD to think about cyber operations just as operations in any domain and build the infrastructure to support that. According to Gus Hunt, Accenture Federal Services cyber strategy lead, cyber as a domain is really no different than the others from an intelligence support perspective. The objective of intelligence, he told Fifth Domain in a recent interview, is to ensure it provides timely information about the adversary, who they are, the status of their capabilities and any information about the threats that are there. “I think what you're seeing ... is that people are asking the question are we appropriately structured or resourced and focused to be as effective as we possibly can in this new realm of cyber and cyber operations,” Hunt, who previously served as the chief technology officer at the CIA, said. “Because they're asking the question, I think the obvious answer is ... we're not structured as effectively as we possibly can be ... [but] it's really good that people are sitting there asking.” The Army is experiencing similar problems, especially when it comes to experimenting with force structure changes and bringing cyber effects to the tactical edge, which currently don't exist. “We're not seeing a corresponding growth in the intel organizational structure with the cyber and” electronic warfare, Lt. Col. Chris Walls, deputy division chief for strategy and policy in the cyber directorate of the Department of the Army G-3/5/7, said at the C4ISRNET conference in May. “The existing intel force structure is really going to be stressed when we put this EW and cyber capability into the field unless they have a corresponding growth and capability as well,” Walls said of tactical cyber effects and teams. https://www.fifthdomain.com/congress/2018/07/02/does-dod-know-how-to-supply-intel-for-cyber-ops/

  • Nearly All the F-35 Jet Engines Ordered Last Year Arrived Late

    March 4, 2020 | International, Aerospace

    Nearly All the F-35 Jet Engines Ordered Last Year Arrived Late

    By Anthony Capaccio Nearly all the engines ordered for the next-generation F-35 jet were delivered late last year as the Pratt & Whitney unit of United Technologies Corp. struggled to solve nagging difficulties with parts and suppliers, according to the Pentagon. About 85% of the engines for the stealthy fighter were delivered late in 2019, the Defense Department's F-35 program office reported, adding that Pratt & Whitney did manage to deliver more engines than required. The tardiness figure was in line with data from 2018, but up from 48% and 58% in 2016 and 2017, respectively. “In general, the monthly schedule performance continues to be impacted by issues with parts and suppliers which the program office is monitoring closely,” the program office said in statement Tuesday. Pratt & Whitney “continues to perform reviews” within its expansive production chain and “has made some progress but more progress is needed to meet the monthly schedule,” it added. Engine delivery issues are just one problem that has plagued the jet's manufacturing ahead of a key decision expected in the next year on whether to move ahead into full-rate production on the $428 billion F-35 program. The fighter has also been flagged for breaking down too often, carrying a 25mm gun that doesn't shoot accurately and having shortages in its supply chain for spare parts from tire assemblies to seats. Some of the problems have since been fixed. Nevertheless, the jet is a key part of a broader weapons modernization effort meant to bolster not just the U.S. military but those of key allies from Poland to Japan. As the sole provider of F-35 engines, Pratt & Whitney and its subcontractors are in line to collect as much as $66 billion of the total jet contract. Congress has approved about $27 billion to date for F-35 engines. But the eventual decision on full-rate production means Pratt & Whitney needs to show it can ramp up production effectively. Overall, 128 of 150 engines delivered last year arrived late, eight arrived on time and 14 came in ahead of schedule, according to the F-35 program office. Of 93 engines in the 11th low-rate production contract bloc, 90 arrived an average of 41 days late. In a statement, the company emphasized that it “exceeded its annual F-35 engine delivery commitment” for 2019. “This represents a 60% year-over-year increase in deliveries. We remain laser-focused on working closely” with the program office and “our supply base to achieving on-time delivery in 2020.” Pratt & Whitney remains under a high-level “Corrective Action Request” that the Defense Contract Management Agency issued in December 2018, citing “poor delivery performance.” The agency said it's evaluating the company's corrective actions and may rescind the CAR by month's end. The company has made improvements in four areas, including deploying “focus teams” to subcontractors for ensuring adequate “critical hardware” and qualifying additional suppliers, DCMA said. Asked if the company was ready for accelerated full-rate engine production, the agency said “as the P&W suppliers demonstrate success in meeting their contract delivery rate the probability of P&W meeting their full-rate production level increases. https://www.bloomberg.com/news/articles/2020-03-03/nearly-all-the-f-35-jet-engines-ordered-last-year-arrived-late

All news