Back to news

April 27, 2020 | International, Aerospace

Pentagon releases request for proposals on Next Generation Interceptor

By: Aaron Mehta

WASHINGTON — The fight to build America's next missile interceptor has officially begun.

The Missile Defense Agency on Friday released its request for proposal for its Next-Generation Interceptor (NGI). The RFP aims to downselect to two companies who will then compete for the right to build the interceptor, which will form the core of America's homeland missile defense going forward.

Proposals are due July 31, but the MDA notes that there may be some give in that schedule due to the ongoing COVID-19 coronavirus pandemic.

The agency requested $664.1 million in fiscal year 2021 for the NGI program, as part of a $4.9 billion five-year budget plan.

Mark Wright, a spokesman for MDA, called the RFP “a vital step forward in designing, developing, and fielding the finest capabilities of both the DoD and American industry for the extraordinarily important purpose of defending the American homeland.”

“Notably, the intention of awarding two contracts for simultaneous development of the NGI effort promotes a healthy competition between the two contractor teams to produce the best NGI possible in the shortest time feasible,” Wright added.

In August, the Pentagon made the surprise decision to cancel the Redesigned Kill Vehicle program, with DoD research and engineering head Mike Griffin saying he didn't want to keep throwing money at a program with fundamental technical issues.

RKV would have upgraded the U.S. homeland defense system's interceptors designed to go after ballistic missile defense threats. The Pentagon decided that no more ground-based interceptors for the Ground-based Midcourse Defense System (GMD) would be built and all future interceptors that are fielded as part of the GMD system will be the new interceptor – that is, the NGI program.

Critics of the decision to cancel RKV and start over with a new design have raised concerns over the timeline, which could extend past 2030. But speaking in March, MDA head Vice Adm. Jon Hill said that waiting that long for the new capability is “unacceptable from a war fighter view” and “unacceptable to me as a program manager.”

Hill said once bids are on the table, the agency will be able to take a harder look at schedule and once an award has been made, it will hold industry accountable to meet “all the wickets.” If that happens, the schedule can be pulled to the left.

https://www.defensenews.com/space/2020/04/24/pentagon-releases-request-for-proposals-on-next-generation-interceptor/

On the same subject

  • Germany First To Modernize Eurofighters With AESA Radar

    June 23, 2020 | International, Aerospace

    Germany First To Modernize Eurofighters With AESA Radar

    Tony Osborne June 22, 2020 Germany is set to become the first of the Eurofighter Typhoon partner nations to retrofit an active, electronically scanned array (AESA) radar, a move that should bolster the fighter's export potential. The German Parliament has given a green light for Berlin to spend €2.8 billion ($3.1 billion) to install the Euroradar consortium's Captor-E radar in all—around 106—of the German Air Force's Tranche 2 and 3 aircraft from around 2023. Contracts should be signed in the coming weeks. Hensoldt will be the design authority for the retrofit program Germany is receiving the Mk. 1 version of the Captor-E AESA Export customers will receive Captor-E first. Kuwait has ordered 28 aircraft, and Qatar 24, and a batch of Kuwaiti aircraft will be delivered this year. But program officials believe that with the AESA finally receiving partner nation backing, the Typhoon's chances in competitions closer to home may have moved up a notch. AESA-equipped Typhoons are proposed for both Finland and Switzerland. But the radar's capabilities could not be evaluated when the fighter took part in trials in those countries, as the participating aircraft were not fitted with it; its competitors were. All four Eurofighter partner nations, Germany, Italy, Spain and the UK, supported development of the radar, done by a consortium of Leonardo, Hensoldt and Indra, but have been reluctant to make the retrofit investment. That is due in part to budgets, but also reflects their satisfaction with the currently installed mechanically scanned Captor. The AESA, however, boosts radar performance and range, giving the aircraft a sensor that can match the performance of the MBDA Meteor beyond-visual-range air-to-air missile. A mechanical repositioner helps widen the radar's field of view to around 200 deg., from 120 deg. with the existing mechanically scanned radar. For the German retrofit program, Hensoldt will take a leading role in the production and delivery of the radars and act as the design authority, while Airbus will act as the test and integration lead. “With this decision, Germany is taking on a pioneering role in the field of key technology for the Eurofighter for the first time,” says Hensoldt CEO Thomas Muller. “It is a signal for Europe that Germany is investing in a technology that is of crucial importance for European defense cooperation.” Airbus Defense and Space CEO Dirk Hoke says the addition of the radar will increase the mission effectiveness of the aircraft and help integrate it with the Franco-German Spanish Future Combat Air System. Leonardo, which led Captor-E development, will provide support to Hensoldt in its role as design authority. Leonardo will also supply the radar's processor. Three different versions of the Captor-E have been developed or are under development. The German retrofit program calls for the installation of the Mk. 1 radar, which has been developed from the Mk. 0 radar that will be delivered to Kuwait and Qatar. The Mk. 1 adds new modes and a multichannel receiver. Along with being retrofitted to the German Tranche 2 and 3 aircraft, it also likely will be fitted to the 38 new-build aircraft planned under Berlin's Quadriga buy to replace its existing Tranche 1 Eurofighters, which lack the computing and electrical power for an AESA installation. Work has also begun on the Radar 2 being developed for the UK, which will feature an electronic attack capability. It is expected to enter service in the mid-2020s, and the UK plans to install it on its Tranche 3 model aircraft. Spain too is planning a retrofit program with the Mk. 1 radar, but also limited to its Tranche 3 fleet. Airbus revealed last November, however, that the novel coronavirus pandemic appears to have delayed Madrid's plans. An AESA has been part of the Eurofighter's development road map for around 15 years. The consortium had originally hoped that it could form part of the Tranche 3 fleet. The capability was also part of the consortium's ultimately unsuccessful offer for India. But it was not until 2014 that the first Captor-E development radar began flying in the aircraft, making an appearance at the 2014 Farnborough Airshow. The AESA radar capability is added through the Eurofighter's Phase 3B Enhancement (P3E(b)) package that will be delivered to Kuwait. Leonardo completed flight trials in support of the Mk. 0 radar development and P3E(b) in late May. Along with the Quadriga purchase, known in Germany notionally as Tranche 4, the country is also planning to use the Eurofighter, as well as the Boeing F/A-18 Super Hornet, to replace the Panavia Tornado fleet, although these plans are subject to parliamentary approvals that could come as late as 2022-23 (AW&ST May 4-17, p. 50). Egypt is also reportedly interested in purchasing up to 24 Eurofighters, possibly as part of a multibillion euro procurement from Italy that also includes jet trainers, helicopters and warships. https://aviationweek.com/defense-space/sensors-electronic-warfare/germany-first-modernize-eurofighters-aesa-radar

  • Finnish officials begin sifting through final HX fighter offers

    May 4, 2021 | International, Aerospace

    Finnish officials begin sifting through final HX fighter offers

    The government in Helsinki received finals offers from five vendors for the multibillion-dollar HX fighter competition, kicking off an evaluation phase slated to run through the remainder of 2021.

  • Brazil seeks to acquire 34 new Saab Gripen F-39E/F fighter jets

    August 28, 2023 | International, Aerospace

    Brazil seeks to acquire 34 new Saab Gripen F-39E/F fighter jets

    Undeniably, the most crucial resolution made this week pertains to the impending procurement of thirty-four Saab JAS 39E/F Gripen multi-role combat aircraft.

All news