Back to news

February 9, 2021 | International, Aerospace

NAVAIR Orders Five VH-92 Presidential Helicopters from Sikorsky

Posted on February 8, 2021 by Richard R. Burgess, Senior Editor

ARLINGTON, Va. — Naval Air Systems Command has awarded Sikorsky a third production contract to build five VH-92A helicopters for the U.S. Marine Corps.

The Naval Air Systems Command awarded Sikorsky Aircraft Corp. — a Lockheed Martin company — a $478.6 million firm-fixe-price contract modification to build five Low-Rate Initial Production Lot III VH-92As, according to a Feb. 5 Defense Department announcement. The award also includes orders for “interim contractor support, two cabin interior reconfiguration kits, support equipment, initial spares and system parts replenishment,” the release said. Work on the contract is expected to be completed by December 2023.

The VH-92A was selected in 2014 to provide transport for the president of the United States, the vice president and other high-level government officials. The helicopter will replace the 19 VH-3D Sea King and VH-60N “White Hawk” helicopters operated by Marine Helicopter Squadron One. The Corps plans to acquire a total of 23 VH-92As, 21 for operations and two for testing. The May 2014 engineering and manufacturing development contract procured two test aircraft and four production aircraft. Six VH-92As were ordered in June 2019, followed by six more in February 2020.

The presidential helicopter fleet is operated by Marine Helicopter Squadron One, based at Marine Corps Air Station Quantico, Virginia, with a detachment at Joint Base Anacostia-Bolling in Washington.

“Government testing to validate system performance and prepare for Initial Operational Test and Evaluation is progressing on schedule and will support an Initial Operational Capability (IOC) planned for July 2021,” a Navy spokeswoman said. “The VH-92A will enter service post IOC at the determination of the White House Military Office.”

https://seapowermagazine.org/navair-orders-five-vh-92-presidential-helicopters-from-sikorsky/

On the same subject

  • Saab Receives Order for Torpedo 62 Life Extension

    July 10, 2020 | International, Naval

    Saab Receives Order for Torpedo 62 Life Extension

    uly 9, 2020 - Saab has received a first order from the Swedish Defence Materiel Administration (FMV) for the life extension of the heavyweight torpedo system. The order value is approximately 485 MSEK and deliveries will take place during 2020-2024. The order is part of a life extension programme for the heavyweight torpedo and mainly comprises a review of the system, modifications and enhancements. The order also includes preparations for upcoming stages of the life extension programme. “We are proud to continue to support and strengthen the capability of the Swedish navy. This order ensures future development of the heavyweight torpedo, with the possibility for the Torpedo 62 to remain in operation with the Swedish Navy until the mid-2040,” says Görgen Johansson, head of Saab's business area Dynamics. Torpedo 62 is a heavyweight torpedo system for surface and underwater targets. Torpedo 62 is equipped with an advanced propulsion system with high capacity and long endurance, combined with an advanced target seeker, developed for the Swedish Navy's operational area. For further information, please contact: Saab Press Centre, +46 (0)734 180 018, presscentre@saabgroup.com www.saabgroup.com Twitter: @Saab Saab serves the global market with world-leading products, services and solutions within military defence and civil security. Saab has operations and employees on all continents around the world. Through innovative, collaborative and pragmatic thinking, Saab develops, adopts and improves new technology to meet customers' changing needs. View source version on Saab: https://saabgroup.com/media/news-press/news/2020-07/saab-receives-order-for-torpedo-62-life-extension/

  • Germany’s plan to boost defense spending hits a snag

    February 6, 2019 | International, Aerospace, Naval, Land, C4ISR, Security, Other Defence

    Germany’s plan to boost defense spending hits a snag

    By: Sebastian Sprenger COLOGNE, Germany — Germany may be unable to deliver on its pledge to increase the defense budget due to smaller-than-expected economic growth, according to a new Finance Ministry analysis. The projections peg the military budget to be several billion euros short of the trajectory to meet the government's goal of reaching 1.5 percent of gross domestic product by 2024. Analysts even see the current spending curve unable to sustain 1.35 percent in the years ahead. NATO members in 2014 agreed to boost their defense spending to 2 percent of GDP within 10 years. Germany's defense budget is roughly €43 billion (U.S. $49 billion) for 2019, or about 1.2 percent of GDP. That is a boost of €4 billion over the previous year. Defence Minister Ursula von der Leyen on Monday said Germany remains committed to hitting the self-declared 1.5 percent target in 2024. She portrayed the Finance Ministry's analysis as a mere first step toward a budget proposal negotiated by Cabinet secretaries. The government is expected to unveil such a plan in late March. The Trump administration has often criticized Germany for underspending on defense, arguing Berlin rides on American coattails when it comes to security. News that the country's spending target is at risk is sure to embolden the narrative in Washington that Europe is somehow taking advantage of the United States. It could weaken the negotiating position of German government delegates at two high-profile events in mid-February: a meeting of NATO defense ministers in Brussels, and the Munich Security Conference. The Finance Ministry's economic outlook estimates that agencies will have to reconcile new spending priorities within their previously established budget targets. That means no fresh money would become available for the government's push on artificial intelligence, for example, according to the document. https://www.defensenews.com/global/europe/2019/02/05/germanys-plan-to-boost-defense-spending-hits-a-snag/

  • The Green Heat Test Drive - call for proposals has been extended!/Banc d'essai énergie verte - appel de propositions prolongée!

    September 1, 2021 | International, Other Defence

    The Green Heat Test Drive - call for proposals has been extended!/Banc d'essai énergie verte - appel de propositions prolongée!

    The Green Heat: Low Carbon Energy Generation for Heating Existing Buildings Test Drive call for proposals has been extended! We are pleased to announce that the deadline to apply to the Green Heat Test Drive Call for Proposals (CFP) has been extended by three weeks. The deadline for application is now Tuesday, September 28, 2021. See the full Call for Proposals that was issued July 27, 2021, and explore how you can support environmental progress and contribute to this key energy initiative. In extending the deadline, the Department of National Defence (DND) is maximizing its chances of getting the best technology to solve the challenge of finding ways to convert its buildings to low carbon heating without requiring a major building retrofit, and address greenhouse gas (GHG) emissions. About the challenge: The Department of National Defence and the Canadian Armed Forces (DND/CAF) are looking to Test Drive creative energy generation solutions to pair up with existing heating systems to help lower our carbon footprint. Specifically, DND/CAF are seeking a large-scale, low carbon energy generation/transfer system for heating existing buildings by integrating with their current hydronic heat distribution systems. A test building has been selected in Kingston, Ontario, for a Design-Build team to design and install an innovative system, in order to assess the effectiveness and the costs of these integrated technologies, with the aim of reducing the energy demand and carbon footprint of DND/CAF's infrastructure portfolio. The potential funding for the Design-Build contract component of the project has been established in the range of $5,500,000. Interested in knowing more about this Test Drive? Please reach out to the Test Drive & Sandbox Team: IDEaSSandboxes-EnvironnementsprotegesIDEeS@forces.gc.ca The IDEaS Team Énergie Verte : Production d'énergie à faibles émissions de carbone pour le chauffage de b'timents existants – Appel de propositions prolongée! Nous sommes heureux d'annoncer que la date limite pour l'appel de propositions pour le Banc d'essai Énergie Verte a été prolongée de trois semaines. L'échéance pour présenter une demande est désormais fixée au mardi 28 septembre 2021. Consultez l'intégralité de l'appel de propositions publié le 27 juillet 2021 et découvrez comment vous pouvez soutenir le progrès environnemental et contribuer à cette initiative énergétique clé. En prolongeant la date limite, le ministère de la Défense nationale (MDN) maximise ses chances d'obtenir la meilleure technologie pour relever le défi de trouver des moyens de convertir ses b'timents au chauffage à faibles émissions de carbone sans nécessiter une rénovation majeure du b'timent, et de lutter à réduire les émissions de gaz à effet de serre (GES). À propos du défi : Le ministère de la Défense nationale et les Forces armées canadiennes (MDN/FAC) cherchent à tester des solutions créatives de production d'énergie à jumeler avec les systèmes de chauffage existants pour aider à réduire notre empreinte carbone. Plus précisément, le MDN et les FAC recherchent un système de production/transfert d'énergie à grande échelle et à faible émission de carbone pour le chauffage des b'timents existants; ce système serait intégré aux systèmes actuels de distribution du chauffage hydronique. Un b'timent d'essai a été sélectionné à Kingston, en Ontario, afin qu'une équipe de conception-construction conçoive et installe un système novateur. L'objectif est d'évaluer l'efficacité et les coûts de ces technologies intégrées, dans le but de réduire la demande d'énergie et l'empreinte carbone du portefeuille d'infrastructures du MDN et des FAC. Le financement possible pour le volet conception-construction du projet a été établi à environ 5 500 000 $. Vous souhaitez en savoir plus sur ce banc d'essai ? Veuillez contacter l'équipe Banc d'essai & Environnement Protégé : IDEaSSandboxes-EnvironnementsprotegesIDEeS@forces.gc.ca L'équipe IDEeS

All news