Back to news

April 11, 2024 | International, Land

MDA awards Lockheed $4.1B contract to upgrade battle command system

The new upgrades to the C2BMC system include enabling it to safely pass data between allies and partners globally and connect to space sensors.

https://www.defensenews.com/pentagon/2024/04/11/mda-awards-lockheed-41b-contract-to-upgrade-battle-command-system/

On the same subject

  • Kirtland Air Force Base gets space defense upgrades

    June 12, 2019 | International, Aerospace, Security

    Kirtland Air Force Base gets space defense upgrades

    By SCOTT TURNER (Tribune News Service) — The U.S. Air Force has begun construction on a facility at Kirtland Air Force Base that will play a major role in defending the nation from attacks by other countries on U.S. satellites. The Air Force Research Laboratory's 26,000 square-foot, $12.8 million Space Control Laboratory will consolidate efforts now being conducted in six different facilities on the base. "Space is now a war-fighting domain," said Air Force Col. Eric Felt, director of the Space Vehicles Directorate at the base. "That doesn't mean we want war in space. We certainly don't. It doesn't mean we have to have war in space. ... If our adversaries attempt to counter us in that domain, we need to have the capabilities and the tools for our nation to counter that." At a groundbreaking ceremony at the base on Thursday, Felt said the new facility will help in that effort. He said the building will be a major addition to AFRL's research in advancing in "space situational awareness, command and control of space systems and the survivability of space assets." "This is a space control technology building," he said. "Space control starts with space domain awareness, making sure we know everything that is going on in space. From there, it goes to making sure we can protect ourselves in space, protect our assets that are up in space. "All the basic components that we need to do for that part of the mission is going to be developed here. The next generation cutting edge capabilities that our nation needs are going to be developed here. And if we do need to perform offensive operations in space, we will be working on those components as well." Brian Engberg, the chief of the space control technologies branch of AFRL's Spacecraft Components Division said researchers in the facility would be determining what satellites were doing. He also said researchers would not only be addressing threats from other countries, but "threats from the space environment itself." Work at the facility will also include the development of satellite technology. "Every satellite that we have up there needs to be resilient," Felt said. "It needs to be there when we need it. If we happen to be in a conflict with a peer competitor, our satellites have to have the defense capabilities when we need them the most." The facility will include office and lab space for 65 civilian and military contractors. It will contain a 5,000 square-foot high-bay laboratory space and more than 5,000 square feet of secure office, laboratory and meeting space. Enberg said scientists and researchers had input on the design, "making sure that everything going into this building will be exactly what we need in order to accomplish our mission, and integrate our people and our ideas better in an innovative environment in order to support our war-fighter mission." "We're looking forward to having a sufficient amount of space in order to collaborate with our industrial partners and our partners in government," he said. "We have many, many projects we are working on. This facility will be a great step forward." AFRL principal technical adviser Michael Gallegos helped lead the effort to bring the facility to Kirtland, an effort he said began about two decades ago. "It's a new state of the art facility that will equip our workforce with secure labs, secure conference space and all of the required lab support space that it needs," he said. Construction of the facility is expected to be completed in December 2020. The contractor for the project is KL House Construction Co. "This was envisioned 20 years ago, back before anybody thought of space as a war-fighting domain, back when space control was just a side project," Felt said. "There were visionary folks who saw our nation was going to need this, that our labs were going to need this." https://www.stripes.com/news/us/kirtland-air-force-base-gets-space-defense-upgrades-1.585666

  • Japan names contractor to build its future fighter jet

    November 2, 2020 | International, Aerospace

    Japan names contractor to build its future fighter jet

    By: Mike Yeo MELBOURNE, Australia — Japan has named Mitsubishi Heavy Industries as the prime contractor to build its next-generation fighter jet, with the Defense Ministry announcing earlier Friday that it signed a contract with the company. “We will steadily proceed with the development of the next fighter (F-X) together with the company,” the ministry said in a brief statement posted on it website. Local media is reporting Defense Minister Nobuo Kishi said the country will select an overseas partner by the end of this year for collaboration on aircraft technology, with stealth technology being one area of focus. The selection of MHI as the prime contractor for the F-X program comes as little surprise, given Japan was determined to restart its indigenous fighter aircraft capabilities. The company is the only one in Japan with experience in this area. The firm took the 21st spot on Defense News' most recent ranking of the top 100 defense companies in the world. Reuters previously reported the contract for the aircraft is worth up to $40 billion. Defense News emailed the Defense Ministry's Acquisition, Technology and Logistics Agency for an update on the contract value but did not receive a response by press time. The Defense Ministry is also seeking more funding for F-X research and development in its latest budget request submitted to the country's Finance Ministry in late September. The Defense Ministry requested $555.8 million for the main program and an additional $113.6 million for R&D of fighter subsystems, such as radars and mission systems integration. The funding will allow Japan to continue its R&D work into fighter technology, which it has kept up over the past decade despite the end of production on the Mitsubishi F-2 fighter jet and the decision to buy the Lockheed Martin F-35. Work the country plans to continue includes the development and refinement of stealth designs and materials, active electronically scanned array radars, and afterburning turbofan engines. Toward that end, local engine manufacturer IHI is expected to continue work on its XF9-1 afterburning turbofan. Japan conducted a series of test flights of a locally designed and built fighter technology demonstrator from 2016 to 2018 to validate its work. The country used the data gleaned from the test program to further refine its indigenous capabilities. The ministry previously said it wants to launch the basic design process for the F-X airframe and engine before the end of the current Japanese fiscal year, which ends March 31, 2021. This would be followed by the production of the first prototype, which is planned to begin in 2024, with flight tests earmarked to start in 2028 following finalization of the design and production plans. Japan plans to replace its fleet of approximately 90 F-2 jets with the new fighter jet starting around 2035. The F-2 was developed in conjunction with Lockheed in the 1990s, and resembles a larger version of the American company's F-16 multirole fighter but is primarily equipped with indigenous systems. Japan also plans to acquire 147 F-35s, which will include 42 of the short-takeoff-and-vertical-landing variants. That version, the F-35B, will operate from a pair of helicopter destroyers currently undergoing modifications to handle the jet. Japan also recently selected Boeing to upgrade 98 of its license-built Mitsubishi F-15J/DJ Eagle interceptors that will see the jets fitted with newer radars and integrated with standoff land-attack missiles. https://www.defensenews.com/industry/2020/10/30/japan-names-contractor-to-build-its-future-fighter-jet/

  • Error code: 404

    March 15, 2023 | International, Aerospace

    Error code: 404

All news