Back to news

April 16, 2020 | Local, Aerospace, Security

Longview delivers first production Viking CL-415EAF “Enhanced Aerial Firefighter”

Longview Aviation Services (LAS) of Calgary, Alta., in co-operation with Viking Air Limited of Victoria, B.C., announced the first Viking CL-415EAF “Enhanced Aerial Firefighter” has been delivered to launch customer Bridger Aerospace Group of Bozeman, Mont., U.S.A.

Bridger Aerospace became the launch customer for the Viking CL-415EAF “Enhanced Aerial Firefighter” program after signing a multiple aircraft purchase agreement in May of 2018. The contract with all options exercised is valued at $204 million and covers the sale of six CL-415EAF amphibious aerial firefighting aircraft.

Manufacturer's serial number (MSN) 1081, the first Canadair CL-215 to undergo the major

modification to the EAF “Enhanced Aerial Firefighter” configuration, took its inaugural flight on March 9, 2020 outside of program-collaborator Cascade Aerospace's facility in Abbotsford, B.C.

After application of Bridger's livery at International Aerospace Coatings' facility in Spokane, Wash., MSN 1081 flew over the central Rocky Mountain range to Bozeman, Mont., for delivery to Bridger Aerospace in advance of the 2020 North American wildfire season.

Tim Sheehy, founder and CEO of Bridger Aerospace Group, stated, “Aggressive initial attack and advanced technology in support of the wildland firefighter are the core of Bridger's ethos. The Viking CL-415EAF is the most capable initial attack asset on the planet and we are proud to be the launch customer for this incredible capability.”

Robert Mauracher, executive vice-president of Sales and Marketing for Viking, commented, “We are very excited and proud to be delivering our first Viking CL-415EAF Enhanced Aerial Firefighter to Bridger Aerospace in time for the 2020 North American wildfire season. The delivery of our first Enhanced Aerial Firefighter is the culmination of a multi-faceted collaborative project originally launched in 2018 and represents the solid partnership that has developed between Viking, LAS, and Bridger over the past 24 months. We are now looking forward to adding a second aircraft to their fleet in the coming months.”

The CL-415EAF “Enhanced Aerial Firefighter” modification program, announced in 2018 as a collaboration between the two subsidiaries of Longview Aviation Capital, provides an economic boost throughout Western Canada derived from job creation, aerospace manufacturing innovation, supply chain development, academic partnerships, and global export opportunities.

The Viking CL-415EAF modification program forms part of a staged approach to utilize the advancements made with the LAS converted aircraft as the basis for the proposed next-generation Viking CL-515 new-production aerial firefighting and multi-purpose amphibious aircraft.

The Viking CL-415EAF “Enhanced Aerial Firefighter” is a specially selected CL-215

airframe converted to turbine configuration using Viking-supplied conversion kits. It features a new Collins Pro Line Fusion integrated digital avionics suite, Pratt & Whitney PW123AF turbine engines, increased fire-retardant capacity, and improvements to numerous aircraft systems.

The Viking CL-415EAF represents the evolution of the type, providing best-in-class water drop performance utilizing the higher delivery two-door water drop system combined with a zero-timed maintenance program and a “new aircraft” factory-supported warranty program. All obsolete components impacting the worldwide fleet of CL-215 & CL-415 aircraft are replaced in the CL- 415EAF, and the upgraded aircraft is designed to failsafe FAR 25 certification criteria with no preset life limit.

The very short scooping distance of the CL-415EAF aircraft is expected to outperform competitors from initial attack to sustained major fire suppression, and the combination of safety and longevity represents exceptional value inherent in purpose-built aerial firefighting amphibious aircraft.

The CL-415EAF aircraft is the only aerial firefighter with factory OEM support offered by Viking's Customer Service and Product Support division, including management of all Continuing Airworthiness, warranty items, in-service engineering, initial provisioning, as well as offering Viking's M+ all-inclusive maintenance support program. All improvements and obsolescence issues addressed in the CL-415EAF aircraft will become the new aircraft production standard in the manufacture of an all new, next generation CL-515 multi-purpose amphibious aircraft.

https://www.skiesmag.com/press-releases/longview-delivers-first-production-viking-cl-415eaf-enhanced-aerial-firefighter

On the same subject

  • $1 billion and counting: Inside Canada's troubled efforts to build new warships

    February 25, 2020 | Local, Naval

    $1 billion and counting: Inside Canada's troubled efforts to build new warships

    Federal government tables figures showing what it's spent on the projects to date Murray Brewster The federal government has spent slightly more than $1.01 billion over the last seven years on design and preparatory contracts for the navy's new frigates and supply ships — and the projects still haven't bought anything that floats. The figures, tabled recently in Parliament, represent the first comprehensive snapshot of what has been spent thus far on the frequently-delayed project to build replacement warships. It's an enormous amount of money for two programs that have been operating for more than a decade with little to show for their efforts to date. It will be years before the Canadian Surface Combatant project — which aims to replace the navy's frontline frigates with 15 state-of-the-art vessels — and the Joint Support Ship program for two replenishment vessels actually deliver warships. The numbers and details for each advance contract were produced in the House of Commons in response to written questions from the Conservative opposition. The money was divided almost evenly between the federal government's two go-to shipyards: Irving Shipbuilding in Halifax, the prime contractor for the new frigates, and Seaspan of Vancouver, the builder of the supply ships. The breakdown raises critical questions about at least one of the programs, said a defence analyst, but it also shines a light on promises made by both Liberal and Conservative governments to keep spending under control for both of these projects — which could end up costing more than $64 billion. "I think there should be a level of concern [among the public] about whether or not what's being delivered in practice is what was advertised at the outset," said Dave Perry, a procurement expert and vice president of the Canadian Global Affairs Institute. A design still in flux Most of his concerns revolve around the new support ships, which the Liberal government says are in the process of being built now. The written responses, tabled in Parliament, note that the projected cost for the two supply ships — $3.4 billion — remains under review "as the design effort finalizes." Perry said he was astonished to learn that, "seven years and half-a-billion dollars into design work on an off-the-shelf design," the navy doesn't have the support ships, even though "the middle third of the ship is built" — and officials now say "the design effort isn't finished." Usually, he said, ships are designed before they're built. The head of the Department of National Defence's materiel branch said most of the preparatory contracts were needed to re-establish a Canadian shipbuilding industry that had been allowed to wither. 'A lot of patience' "I think we have to look at the totality of everything that's being accomplished under" the national shipbuilding strategy, said Troy Crosby, assistant deputy minister of materiel at DND. "Over that period of time, and with these expenditures, we've built a shipbuilding capability on two coasts, not just through National Defence but also through the coast guard, offshore fisheries science vessels. I understand it has taken a lot of patience, I suppose, and probably some uncertainty, but we're really getting to the point now where we can see delivering these capabilities to the navy." The largest cash outlays involve what's known as definition contracts, which went individually to both shipyards and were in excess of $330 million each. They're meant to cover the supervision of the projects and — more importantly — to help convert pre-existing warship designs purchased by the federal government to Canadian standards. The choices on each project were made at different times by different governments, but ministers serving both Liberal and Conservative governments decided that going with proven, off-the-shelf designs would be faster and less expensive than building from scratch. Now, after all the delays, it's still not clear that choosing off-the-shelf designs has saved any money. "I would be completely speculating on what it would cost to invest to develop the kind of expertise and capacity inside the government, inside National Defence and everybody involved, to be able to do something like that in-house," said Crosby. "The approach we've taken at this point, by basing both the Joint Support Ship and the Canadian Surface Combatant on pre-existing designs, allows us to retire a lot of risk in the way forward." When Crosby talks about "retiring risk," he's talking about the potential for further delays and cost overruns. Among the contracts, Irving Shipbuilding was given $136 million to support the drawing up of the design tender for the new frigates and to pay for the shipbuilding advice Irving was giving the federal government throughout the bidding process. Years ago, the federal government had enough in-house expertise to dispense with private sector guidance — but almost all of that expertise was lost over the past two decades as successive federal governments cut the defence and public works branches that would have done that work. The last time Canada built major warships was in the 1990s, when the current fleet of 12 patrol frigates was inaugurated. The federal government has chosen to base its new warships on the BAE Systems Type-26 design, which has been selected by the Royal Navy and the Royal Australian Navy. The hull and propulsion system on the new frigates will be "largely unchanged" from the British design, but the combat system will be different and uniquely Canadian, said Crosby. The project is still on track to start cutting steel for the new combat ships in 2023. Crosby said he would not speculate on when the navy will take delivery of the first one. Delivery of the joint support ships is expected to be staggered, with the first one due in 2024. There will be a two-year gap between ships, said Crosby, as the navy and the yard work through any technical issues arising with the first ship. If that timeline holds, the first support ship will arrive two decades after it was first proposed and announced by the Liberal government of former prime minister Paul Martin. https://www.cbc.ca/news/politics/frigates-joint-supply-ships-navy-procurement-canada-1.5474312

  • Military attrition has hit its highest level in 15 years, warns briefing prepared for generals

    October 31, 2022 | Local, Other Defence

    Military attrition has hit its highest level in 15 years, warns briefing prepared for generals

    The briefing acknowledged the military is facing a “workforce crisis”.

  • Government will review towing vessel contract after procurement process questioned by trade tribunal

    January 24, 2019 | Local, Naval

    Government will review towing vessel contract after procurement process questioned by trade tribunal

    DAVID PUGLIESE, OTTAWA CITIZEN The federal government will review a contract awarded last year for emergency towing vessels after the Canadian International Trade Tribunal raised questions about its procurement process. In early January, the Canadian International Trade Tribunal recommended the government review the key performance requirements used in the procurement of two emergency towing vessels for the west coast from an Irving firm. Heiltsuk Horizon, a partnership of majority partner Heiltsuk Nation of Bella Bella, British Columbia and Horizon Maritime Services Limited, a Canadian marine services company, complained to the CITT last August that the winning supplier did not meet important safety requirements of the tender process. “We're confident with the new, state of the art vessels we've submitted, and we want to ensure the right emergency response vessels are in place to protect the vital coastal economies and fragile ecosystems of British Columbia's coast,” Chief Councillor Marilyn Slett of the Heiltsuk Nation said Thursday about the decision to review the contract. At the time, the CITT recommended Public Services and Procurement Canada re-evaluate some of its mandatory requirements and that no further expenditure under the contact be undertaken. However, the tribunal also recommended that the contract remain with the winning bidder, Atlantic Services Limited/Atlantic Towing, until the evaluation can be completed. In August, the federal government announced the firm had been awarded a three-year contract worth $67 million for the lease of two emergency offshore towing vessels that would operate in the waters off the coast of British Columbia. The vessels were to be capable of towing large commercial ships in distress, such as tankers and container ships, before they get too close to shore, according to the federal government. As part of the contract, the firm, which is an Irving company, would also provide training in offshore emergency towing to Canadian Coast Guard personnel and partners, including Indigenous communities, involved in marine safety. But Heiltsuk Horizon challenged that award, pointing out that the contract was awarded without the required proof the vessels met the mandated towing power. The firm noted that the procurement process was flawed. In a letter to Heiltsuk Horizon, the CITT recommended Public Services and Procurement Canada reevaluate the “bollard pull” (towing power) of the vessels in all bids received. The CITT also awarded Heiltsuk Horizon costs incurred in submitting the complaint. Mary Keith, vice president of communications for Irving, issued a statement at the time from Atlantic Towing, pointing out that the tribunal did not declare the firm's bid non-compliant. “This is good news and reaffirms the integrity of the rigorous and transparent award process by PWGSC that also involved a third party fairness monitor,” the statement added. “The Tribunal has requested verification of one item and we are confident in our full compliance. The Bollard Pull on our vessels are verified and certified by one of the world's leading marine certification companies.” https://ottawacitizen.com/news/national/defence-watch/government-will-review-towing-vessel-contract-after-procurement-process-question

All news