Back to news

January 30, 2019 | International, Aerospace

Lockheed CEO: Boeing’s F-15X won’t disrupt F-35 program

By:

WASHINGTON — Lockheed Martin has been given assurances by top Pentagon leaders that the F-35 program will not be negatively impacted by a potential U.S. Air Force buy of Boeing's F-15X, Lockheed CEO Marillyn Hewson said Tuesday.

“If they choose to have an order of the F-15, it won't be at the expense of F-35 quantities,” she told investors during an earnings call.

“I'm hearing that directly from leadership in the Pentagon, and I think that's an important point for me to make. It's not just our suspicion, but I've been told that directly.”

The U.S. Air Force is expected to roll out a plan to begin buying new F-15s in its upcoming fiscal 2020 budget release. In December, Bloomberg reported the service intends to purchase 12 new F-15X aircraft in 2020 for $1.2 billion.

On Friday, Gen. Dave Goldfein, the Air Force's chief of staff, confirmed to Defense News that the service will procure new F-15s if the budget grows enough to allow it, but that the F-35 program of record would remain the same with no slowdown to the buy rate.

“I'm not backing an inch off of the F-35” Goldfein said. “The F-35 buy that we're on continues to remain on track. And I'm not interested in taking a nickel out of it when it comes to buying anything else in the fighter portfolio.”

Goldfein added that the Air Force wants to increase fighter procurement to 72 aircraft a year.

The Air Force has about 230 F-15 "C" and "D" models currently in service, and the F-15X will replace the portion of the fleet owned by the Air National Guard, according to Bloomberg. The new F-15 model will have new radar and electronic warfare equipment, the ability to carry more weapons, and include other improvements originally designed for Saudi Arabia's and Qatar's F-15s.

If the service maintained a rate of one F-15X a month, it would be free to boost its F-35 production rate to 60 aircraft a year — a number that Air Force officials had cited as key for production ramp up. However, the FY19 budget forecast showed that the service would likely be unable to procure the F-35 in those quantities before FY23.

“If we had the money, those would be 72 F-35s. But we've gotta look at this from a cost/business case.” Goldfein said. “An F-15 will never be an F-35. Never. But I need capacity.”

Hewson's statement indicates that support for the F-35 continues to be strong both within the Air Force and among Pentagon leaders. However, earlier on Tuesday, acting Defense Secretary Patrick Shanahan told reporters he wants to see “more performance” from the F-35, although he did not specify particular areas of improvement.

“I am biased towards giving the taxpayer their moneys' worth. And the F-35, unequivocally, I can say has a lot of opportunity for more performance,” said Shanahan, a former Boeing executive.

When investors asked Hewson to respond to Shanahan's critique, the Lockheed CEO said the company remains on the same page with the Pentagon on the need to reduce the cost per plane.

“We're on a path to drive it to an $80 million [unit cost] for the F-35A by full-rate production,” which is projected to begin in Lot 15 with deliveries starting in 2023, Hewson said.

“So as long as we stay on our procurement rate plan — which by all accounts we're going to continue to ramp up at the rate that we envisioned — then we're going to continue to drive the price down."

Aaron Mehta in Washington contributed to this story.

https://www.defensenews.com/industry/2019/01/29/lockheed-ceo-boeings-f-15x-wont-disrupt-f-35-program

On the same subject

  • L’ONERA et MBDA préparent le premier vol d’un véhicule propulsé par un statomixte

    July 23, 2021 | International, Aerospace

    L’ONERA et MBDA préparent le premier vol d’un véhicule propulsé par un statomixte

    Air & Cosmos consacre un dossier aux travaux menés par l'ONERA et MBDA, qui prévoient de faire voler, en collaboration avec la DGA, un véhicule hypersonique propulsé par un statomixte, c'est-à-dire un moteur capable de réaliser successivement une combustion subsonique et supersonique. L'objectif est de réaliser un véhicule d'essai unique, qui permettra de « vérifier le comportement d'un tel véhicule dans le domaine du vol hypersonique », explique Olivier Dessornes, directeur adjoint du DPME (département multi-physique pour l'énergétique) à l'ONERA. Il existe « une très grande expertise française » en la matière, « qui a commencé à l'ONERA et s'est poursuivie en collaboration avec Aérospatiale puis MBDA, sous l'égide de la DGA » insiste Laurent Serre, directeur de programme dissuasion à l'ONERA. L'essai en vol devrait être réalisé d'ici fin 2021, depuis la côte Est des Etats-Unis. Le véhicule sera accéléré et mis en poste et à l'altitude voulue pour une fusée-sonde. Les données seront récoltées avant que le véhicule ne fonde et que ses restes ne soient perdus en mer. Air & Cosmos du 23 juillet

  • UK, Japanese, Italian partners agree next steps for fighter jet | Reuters

    September 12, 2023 | International, Aerospace

    UK, Japanese, Italian partners agree next steps for fighter jet | Reuters

    Britain's BAE Systems , Japan's Mitsubishi Heavy Industries , and Italy's Leonardo have agreed the next steps to deliver the concept phase of a next-generation combat aircraft, BAE Systems said on Tuesday.

  • Textron Preps For Mass Production Of New Army Rifle

    September 4, 2019 | International, Land

    Textron Preps For Mass Production Of New Army Rifle

    By SYDNEY J. FREEDBERG JR. WASHINGTON: Textron has partnered with global gun-maker Heckler & Koch to mass-produce new rifles for the Army and with ammunition giant Olin Winchester to churn out the high-powered yet lightweight 6.8 millimeter rounds. Textron still has to beat both General Dynamics and Sig Sauer for the right to build the Next Generation Squad Weapons (NSGW). All three companies won awards last Thursday to build prototypes for troops to test, starting this coming spring and continuing through late 2021. No follow-on production contract is guaranteed. But Textron is watching the Army's urgent push to modernize across the force, from assault rifles to hypersonic missiles and wants to be ready to sprint to mass production if it wins. Textron could do everything in house, senior VP Wayne Prender said. But, he told reporters this morning, by working with Olin Winchester and H&K, which are experienced with largescale manufacture of ammo and weapons respectively, “we are preparing ourselves for a high rate of production.” The Army wants to start fielding two variants of NGSW to tens of thousands of close combat troops — infantry, scouts, special operators, and so on — in 2022. Support troops and vehicle crews will stick with the current M4 carbine for the indefinite future. But frontline ground combatants will get more than just a gun. Linked wirelessly with electronics all over the soldier's body, including Microsoft HoloLens-derived targeting goggles called IVAS, the Next Generation Squad Weapon is meant to be just one lethal component of a larger, high-tech system. It's like the Hellfire missiles on an Apache helicopter or the 120 mm Rheinmetall smoothbore cannon on an M1 tank, except this “weapons platform” moves on foot. This approach is part of a wider push, begun by former Defense Secretary (and Marine Corps rifleman) Jim Mattis, to improve the Close Combat Lethality of the military's most exposed members. The American grunt has accumulated more and more high tech over the last two decades. Designing a new weapon from scratch is a chance to streamline the scopes, cables, batteries, and other impedimenta festooning modern foot troops. “All of those are now part of an integrated weapon system, versus a rifle that then has something else strapped onto it with wires hanging off,” Prender told reporters. “We can make some smart decisions early in the design process that enable it to be cleaner.” That should make the new weapon easier to use, lighter, and even better balanced, since the center of gravity is now calculated with installing add-ons in mind. Three Contenders, 27 Months While troops will test the first prototypes this spring, each contender has 27 months to deliver a total of 53 NGSW assault rifles — potential replacements for the M16/M4 family in service since Vietnam — and 43 automatic rifles — replacing the M249 SAW — along with 850,000 rounds of 6.8 mm ammunition. Like the M16, M4, and M249 with the 5.56 mm cartridge, the new NGSW family will all share a common 6.8 mm round, which is supposed to deliver longer range and greater body-armor-penetrating power without increasing weight much. Each competitor has their own spin on how to deliver the new rifle bullet. Sig Sauer, which already builds the Army's standard 9mm pistol and a host of other limited-issue weapons, has taken what seems to be the most conservative approach. It offers what the company calls a “hybrid” cartridge, which is still made of metal like traditional brass casings, but significantly lighter. General Dynamics's Ordnance & Tactical Systems (OTS) division has partnered with a Texan firm, True Velocity, to build “composite” rounds out of polymers. In layman's words, the bullet is packaged, not in brass, but rugged plastic. Again, the goal is to save weight. Textron's approach is arguably the most radical, to the point it doesn't even look like a bullet, just a cylinder that's equally blunt on both ends. That's because it's a cased telescoped round, sheathing the entire bullet in a polymer shell, surrounded by its propellant instead of sitting on top of it. (The resulting case looks like a folded-up telescope, hence the name). Textron says this method cuts weight per shot by 40 percent, a potential boon for overburdened foot troops. The Army's new modernization strategy — after decades of cancelled programs and incremental changes to aging weapons — is to try such great leaps forward but then test prototypes ASAP with real troops in the field. The service has been “opening the doors of the Army to the contractors to get that feedback early and often,” Prender said approvingly. Each round of user feedback is meant to help the contractors improve their product, and the military to refine their specifications, until the service can confidently choose a refined design. Now, the Army isn't locking itself in. Whoever does best in testing, the Army hasn't promised the winner a production contract. But Textron is betting they can convince an eagerly modernizing Army that their product is not only superior but ready to field without further R&D. “Whether [to] move right into an initial Low-Rate Initial Production, followed by fielding and first unit equipped, or [to do] additional prototyping and maturation of the weapon system... all that will be determined by the Army,” Prender told reporters. “We have high confidence that our weapon system will meet all of the requirements that the Army has laid out... so we're looking forward to at the end of those 27 months to move into production.” https://breakingdefense.com/2019/09/textron-readies-for-mass-production-of-new-army-rifle

All news