Back to news

February 13, 2024 | International, Naval

India takes next step toward new 155mm towed howitzers

The towed gun systems are to be no heavier than 15 tons, and they must be able to fire existing 155mm rounds to a distance of 40-plus kilometers.

https://www.defensenews.com/land/2024/02/13/india-takes-next-step-toward-new-155mm-towed-howitzers/

On the same subject

  • Contract Awards by US Department of Defense - October 21, 2019

    October 22, 2019 | International, Aerospace, Naval, Land, C4ISR, Security

    Contract Awards by US Department of Defense - October 21, 2019

    AIR FORCE Raytheon Co., Dulles, Virginia, has been awarded a $128,450,262 firm-fixed price, indefinite-delivery/indefinite-quantity contract for Mobile Sensors operations and maintenance. This contract provides for non-personal services for operations and maintenance services that will ensure the availability of the Cobra King and Gray Star's radar facility to collect on 100% of the tasked data collection opportunities that pass through its field of view with the necessary support provided 24 hours per day, 365 days per year. Work will be performed at Patrick Air Force Base, Florida, and locations overseas and is expected to be completed by Oct. 31, 2021. This award is the result of a competitive acquisition and one offer received. Fiscal 2020 operations and maintenance funds in the amount of $22,722,616 are being obligated at the time of award. The Acquisition Management and Integration Center, Detachment 2, Patrick Air Force Base, Florida, is the contracting activity (FA7022-17-D-0001). Mesotech International, Sacramento, California, has been awarded a ceiling of $17,462,000 indefinite-delivery/indefinite-quantity contract for the Fixed Base Weather Observation System (FMQ-23) program. This contract provides for new FMQ-23 system purchases and contractor logistics support. Work will be performed at Sacramento, California, and is expected to be complete by October 2025. This award is the result of a sole source acquisition. Fiscal 2020 operations and maintenance funds in the amount of $129,286 will be obligated at the time of the award. The Air Force Life Cycle Management Center, Hanscom Air Force Base, Massachusetts, is the contracting activity (FA8730-20-D-0003). NAVY Northrop Grumman Systems Corp., San Diego, California, is awarded an $18,253,921 modification (P00003) to a firm-fixed-price, cost-plus-fixed-fee delivery order (N00019-19-F-0272) against a previously issued basic ordering agreement (N00019-15-G-0026) in support of the MQ-4C Triton unmanned aircraft system. This order procures material kits and retrofit labor to incorporate the Integrated Functional Capability (IFC) 4.0 configuration into one retrofit ground segment and fully fund the IFC 4.0 retrofit install labor for aircraft B10. Work will be performed in San Diego, California (41.2%); Palmdale, California (30.7%); Waco, Texas (9.9%); Salt Lake City, Utah (2.9%); Newtown, North Dakota (2.5%) Verona, Wisconsin (1.6%); Sterling, Virginia (1.5%); Irvine, California (1%); San Clemente, California (0.7%); and various locations inside and outside the continental U.S. (7.9% and 0.1%, respectively). Work is expected to be completed in February 2021. Fiscal 2020 aircraft procurement (Navy); and fiscal 2020 research, development, test and evaluation (Navy) funds in the amount of $18,253,921 are being obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. ARMY Advanced Structural Technologies Inc.,* Oxnard, California, was awarded a $17,643,500 firm-fixed-price with economic price adjustment contract for manufacture and supply of M1 Abrams tank aluminum road wheel inserts. Bids were solicited via the internet with four received. Work will be performed in Oxnard, California, with an estimated completion date of Oct. 21, 2021. Fiscal 2020 Army working capital funds in the amount of $17,643,500 were obligated at the time of the award. U.S. Army Contracting Command, Warren, Michigan, is the contracting activity (W911RQ-20-D-0001). Pontchartrain Partners LLC,* New Orleans, Louisiana, was awarded a $12,221,180 firm-fixed-price contract for emergency erosion repairs. Bids were solicited via the internet with two received. Work will be performed in Texas City, Texas, with an estimated completion date of Aug. 14, 2020. Fiscal 2018 flood control and coastal emergencies, civil works funds in the amount of $12,221,180 were obligated at the time of the award. U.S. Army Corps of Engineers, Galveston, Texas, is the contracting activity (W912HY-20-C-0002). TAC Environmental LLC,* Toledo, Ohio, was awarded a $9,000,000 firm-fixed-price contract for environmental architect engineering services. Bids were solicited via the internet with four received. Work locations and funding will be determined with each order, with an estimated completion date of Oct. 20, 2024. U.S. Army Corps of Engineers, Louisville, Kentucky, is the contracting activity (W912QR-20-D-0002). DEFENSE LOGISTICS AGENCY Oshkosh Defense LLC, Oshkosh, Wisconsin, has been awarded a maximum $9,899,267 firm-fixed-price, requirements contract for pneumatic tire wheel assemblies. This was a competitive acquisition with one response received. This is a three-year contract with no option periods. Location of performance is Wisconsin, with an Oct. 21, 2022, performance completion date. Using military service is Army. Type of appropriation is fiscal 2020 through 2022 Army working capital funds. The contracting activity is the Defense Logistics Agency Land and Maritime, Warren, Michigan (SPRDL1-20-D-0002). Standard Bent Glass, East Butler, Pennsylvania, has been awarded a $9,077,715 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for transparent armor vehicular windows. This was a competitive acquisition with two offers received. This is a three-year base contract with two one-year option periods. Location of performance is Pennsylvania, with an Oct. 20, 2022, performance completion date. Using military service is Army. Type of appropriation is fiscal 2020 through 2022 defense working capital funds. The contracting activity is the Defense Logistics Agency Land and Maritime, Columbus, Ohio (SPE7LX-20-D-0002). *Small Business https://www.defense.gov/Newsroom/Contracts/Contract/Article/1994358/source/GovDelivery/

  • European nations team up to buy Patriot missiles in $5.5 billion deal

    January 3, 2024 | International, Land

    European nations team up to buy Patriot missiles in $5.5 billion deal

    If all options are exercised, the four states will procure a joint quantity of up to 1,000 Patriot Guidance Enhanced Missiles.

  • A220 : les fournisseurs d’Airbus toujours sous pression pour réduire leurs coûts de 20 %

    September 30, 2019 | International, Aerospace

    A220 : les fournisseurs d’Airbus toujours sous pression pour réduire leurs coûts de 20 %

    Par Maxime Bertrand Airbus vise toujours une réduction de 20 % des coûts de la part de ses fournisseurs afin d'assurer la rentabilité de l'A220. C'est ce qu'ont déclaré les pdg d'Airbus et d'Airbus Canada, Guillaume Faury et Philippe Balducchi, lors d'une rencontre avec la presse montréalaise jeudi. Nous avons progressé, mais le processus n'est pas terminé, a déclaré Philippe Balducchi, pdg d'Airbus Canada L'A220 a vraiment besoin d'une accélération, d'un renforcement du programme de réduction des coûts, a renchéri Guillaume Faury, pdg d'Airbus. Le géant européen a pris les commandes du programme né de la C Series de Bombardier – renommé A220 depuis – en juin 2018. Pas plus tard qu'en octobre 2018, le pdg d'Airbus affirmait qu'il lui faudrait « des années » avant que l'A220 devienne une réussite économique. En entrevue avec la presse montréalaise, les deux dirigeants ont soutenu jeudi qu'il était normal que l'effort demandé soit plus important pour l'A220 que pour les autres appareils de la flotte d'Airbus, car le programme en est à ses débuts et qu'il faut repositionner l'appareil, accélérer la cadence de production et entrer dans une zone de rentabilité. Selon la direction de l'avionneur, tous les appareils en début de production doivent relever ce genre de défi. Airbus se donne trois ans pour terminer le processus entamé il y a une quinzaine de mois et parvenir à une réduction des coûts de 20 %. La démarche ne s'arrêtera pas là, préviennent les dirigeants, car les baisses des coûts devront également s'inscrire dans le temps. À la fin de mai dernier, le carnet de commandes d'Airbus comptait 536 appareils A220. Au salon aéronautique du Bourget, en juin, l'entreprise a annoncé de 70 appareils A220. Dossier des avions de chasse Dans le dossier des avions de chasse, la direction d'Airbus a dit s'être retirée avec beaucoup de regret de l'appel d'offres du gouvernement canadien. Elle croit que sa présence au Canada gr'ce à l'A220 permettra d'accroître sa visibilité et de saisir les occasions futures qui se présenteront. Différend commercial entre l'Europe et les États-Unis Par ailleurs, la direction d'Airbus a réagi à la décision de l'Organisation mondiale du commerce (OMC) d'autoriser les États-Unis à imposer des droits de douane annuels de 7,5 milliards de dollars sur les produits européens dans le cadre du conflit sur les subventions dans le domaine de la construction aéronautique. Il s'agit d'un différend de 15 ans entre Boeing et Airbus, donc entre les États-Unis et l'Europe, qui s'accusent mutuellement de consentir des aides illégales à leurs avionneurs. Nous croyons que tout le monde sort perdant d'une guerre commerciale, a déclaré Guillaume Faury. Si des droits sont imposés par les deux parties, cela entraînera une hausse des coûts de déplacement et nous rendra moins concurrentiels. Nous croyons que les parties finiront par s'entendre et que la voix de la sagesse sera la plus forte. Nous continuons à militer en faveur d'une entente, nous croyons qu'il est possible d'y parvenir. https://ici.radio-canada.ca/nouvelle/1319890/a220-avion-reduction-couts-programme-airbus

All news