Back to news

March 24, 2021 | International, Aerospace

Here’s who will compete head-to-head to build the next homeland missile defense interceptor

Two teams have been chosen out of three to proceed in a competition to build the Next-Generation Interceptor to defend the U.S. against intercontinental ballistic missiles.

https://www.defensenews.com/breaking-news/2021/03/23/heres-who-will-compete-head-to-head-to-build-the-next-homeland-missile-defense-interceptor/

On the same subject

  • Duckworth: Army's New Helicopters Should Not Be Designed for Anyone Else

    February 26, 2020 | International, Aerospace

    Duckworth: Army's New Helicopters Should Not Be Designed for Anyone Else

    By Matthew Cox WEST PALM BEACH, Florida -- Sen. Tammy Duckworth, a former U.S. Army helicopter pilot, said recently that the Marine Corps, Navy and Air Force would have to wait their turn if they want their own version of the Army's futuristic helicopters being developed under the Future Vertical Lift (FVL) effort. The Illinois Democrat and member of the Senate Armed Services Committee recently attended a high-profile flight demonstration of Sikorsky-Boeing's new SB-1 Defiant helicopter that was designed with the goal of replacing the UH-60 Black Hawk. The Army awarded a team from Sikorsky, part of Lockheed Martin Corp., and Boeing Co. a 2014 contract to build Defiant as part of the Joint Multi Role Technology Demonstrator (JMRT-D) program. A Textron Inc.-Bell team also received a contract under the effort and built the V-280 Valor, a tiltrotor-design helicopter that completed its first test flight in December 2017. Both the Valor and the Defiant prototypes are promising designs, Army officials maintain, that are capable of flying at speeds of more than 200 knots and will result in a replacement for the venerable Black Hawk as the service's new Future Long Range Assault Aircraft (FLRAA). Duckworth, a former Army National Guard officer who lost both legs after enemy forces shot down the Black Hawk she was flying over Iraq in 2004, said she intends to keep the FVL program from morphing into an unwieldy, joint effort. That's a pitfall that has thrust many joint-service programs into program delays and cost-overruns because of overly broad requirements. "This is an Army aircraft; we need to keep an Army mission," Duckworth told reporters at the Feb. 20 flight demo. "If the other services want to fall in behind it and develop something afterward and tweak it for what they need, that is fine, but we cannot build a Frankenaircraft ... that's going to meet the Marines' needs and the Navy's need and the Air Force's needs. "We need to not let the requirements start to meander and creep around because otherwise we will never get to where we need to and get these things fielded as quickly as possible," she added. In the past, the Pentagon has often tried to develop multiple versions of a major combat system, such as the new F-35 Joint Strike Fighter, which has been designed to satisfy the requirements of the Navy, Marine Corps and Air Force. The acquisition program for the advanced, stealth fighter began in the mid-1990s and still suffers from testing setbacks that have delayed a full-rate production decision. That Army-Marine Corps Joint Light Tactical Vehicle (JLTV) program, however, is considered a successful acquisition effort that began in 2006 after Humvees in Iraq could not withstand the destruction force of enemy homemade bombs attacks. JLTV took almost a decade to become a reality but, in August 2015, Oshkosh Corp. was selected over Lockheed Martin Corp. and AM General LLC to build the vehicle for the Army and Marine Corps. Meanwhile, for the second year in a row, the Army has reduced the number of JLTVs it will buy in fiscal 2021 to free up money to fund future modernization. FVL is one of the Army's top modernization priorities under a new strategy the service launched in 2017, with the goal of replacing most of its major combat platforms beginning in 2028. Leaders stood up Army Future Command, an organization designed to help the service's acquisition and requirements machines work more closely together in an effort to streamline what has traditionally been a slow-moving process to develop and field combat system. So far, the strategy appears to be working, since the FLRAA and the Future Attack Reconnaissance Aircraft (FARA) efforts are ahead of schedule, Duckworth said. Army officials are scheduled to down-select to two vendors to build final prototypes of the FARA next month. The service is also scheduled to begin a competitive demonstration and risk reduction phase for FLRAA, which is expected to last until 2022, the year the service plans to down-select to one vendor to build the Black Hawk replacement. "This is rare for defense procurement to actually be ahead of timeline instead of pushing everything to the right," Duckworth said. "I am very pleased with how well the Army is handling this development." The senator stressed, however, that she intends to continue strict oversight of the FVL to ensure it doesn't result in a waste of taxpayer dollars. "We can't be spending upward of $60 million per airframe," Duckworth said. "If we do that, then we can't field the number of airframes that we need to be out there in the force." Army Secretary Ryan McCarthy, who also attended the flight demo, stressed that the service's leadership is committed to making necessary cuts to outdated programs to free up money for FVL and other modernization efforts. "We don't have a choice. We are running out of letters to upgrade the existing platforms -- they are 40-year-old systems; the technology will not endure," he said. -- Matthew Cox can be reached at matthew.cox@military.com. https://www.military.com/daily-news/2020/02/25/duckworth-armys-new-helicopters-should-not-be-designed-anyone-else.html

  • State Department approves potential frigate sale to Greece, despite agreement with France

    December 13, 2021 | International, Aerospace, Naval

    State Department approves potential frigate sale to Greece, despite agreement with France

    Though France in September announced an agreement to sell Greece three frigates, Greece asked the U.S. to continue finalizing its proposal for four new frigates, modernizing existing Hellenic Navy ships and providing an interim solution for Greek sailors to use during that modernization effort.

  • How the Marine Corps wants to improve oversight of its network

    February 4, 2020 | International, Naval

    How the Marine Corps wants to improve oversight of its network

    By: Mark Pomerleau The Marine Corps is creating new network battalions and companies in an effort to improve oversight and the command and control of its network. These new organizations — described as a “huge, huge deal” — are part of an effort to reduce the number of organizations charged with network functions. The move will also allow for more accurate readiness reporting, said Col. Ed Debish, commanding officer of the Marine Corps Cyberspace Operations Group. “Currently, we have six different commands that have something to do with managing the Marine Corps Enterprise Network,” he said at a Jan. 31 lunch hosted by the AFCEA Quantico chapter. Now, one commander — the head of Marine Corps Forces Cyberspace Command — will oversee and manage these groups. “Primarily, what they're going to do is deliver enterprise business services down to the end user device," Debish told C4ISRNET following his remarks. "They're also going to be responsible for managing the BAN and LAN — the building area networks and the local area networks on the bases and stations around the Marine Corps.” The new commands will absorb the organizations that previously performed many of these functions, including the Marine Air-Ground Task Force (MAGTF) Information Technology (IT) Support Centers, or MITSCs. “The problem that it was designed to solve was unity of command and unity of effort on the Marine Corps Enterprise Network. It's going to give us visibility all the way down to the end user device where we didn't have that visibility before,” he said. The arrangement will also help Marines better understand readiness of the network. Previously, it could be difficult to determine what equipment was working and part of the network. Now, with one command, those assessments should be easier, Debish said, as they'll be managed under a single entity. Additionally, the new organizations will help with one of the Marine Corps' top IT priorities: to deploy its network abroad in a more agile and mobile way. “The idea is to move that enterprise capability to the tactical edge with the deploying force,” Debish said. “If you were to just remotely connect back into the enterprise network, you're going over a VPN connection to a data center somewhere that might be thousands of miles removed from it. But if you lost that connection, then what happens? You don't have any access to any of your data or your network.” The first battalion will be created this year at Camp Pendleton. The battalion commander will assume command around April. The first company is expected to be created this year and be based out of Marine Corps Forces Europe/Africa, located in Germany. Next year, leaders expect to create the second and third network battalions at Camp Lejeune and Okinawa, respectively. https://www.c4isrnet.com/newsletters/daily-brief/2020/02/03/how-the-marine-corps-wants-to-improve-oversight-of-its-network/

All news