Back to news

June 20, 2018 | International, Naval

GenDyn contracted for parts for future submarine construction

James LaPorta

June 19 (UPI) -- The Department of Defense has awarded a contract to General Dynamics Electric Boat for work on the next nine Virginia-class attack submarines.

The contract award from Naval Sea Systems Command, announced Monday, is worth $225 million under the terms of cost-plus-fixed-fee contract, which is a modification to a previous Pentagon award, the Defense Department said.

The deal will see General Dynamics provide economic ordering quantity material -- parts ordered ahead of time -- for the next nine Virginia-class, nuclear-powered fast attack submarines, for work in fiscal 2019 through 2023.

The nine vessels are part of the Block V generation of the Virginia class. The first four have been ordered by the U.S. Navy already, with General Dynamics set to construct SSN-802 and SSN-803 and Huntington Ingalls Industries tapped for SSN-804 and SSN-805.

Work on the contract will occur in various locations throughout the United States and is expected to be complete in January 2019.

The total cumulative value of the contract will be obligated to General Dynamics at time of award -- the obligated funds will be allocated from Navy fiscal 2018 shipbuilding and conversion accounts and will not expire at the end of the current fiscal year, said the Pentagon press release.

https://www.upi.com/Defense-News/2018/06/19/GenDyn-contracted-for-parts-for-future-submarine-construction/8941529412778/

On the same subject

  • Lockheed names new F-35 fighter jet program leader

    October 9, 2024 | International, Aerospace

    Lockheed names new F-35 fighter jet program leader

  • Spain to give Ukraine 1 billion euros worth of military aid
  • Here’s the robotic vehicle that will carry equipment for US troops

    November 6, 2019 | International, Land

    Here’s the robotic vehicle that will carry equipment for US troops

    By: Jen Judson WASHINGTON — The U.S. Army has selected General Dynamics Land Systems' Multi-Utility Tactical Transport, or MUTT, for its Squad Multipurpose Equipment Transport unmanned ground system program of record. The initial contract for the eight-wheel drive robotic vehicle totals $162.4 million and includes support hardware, user training and technical support. The contract will wrap up at the end of October 2024, according to an Oct. 30 Defense Department announcement. GDLS will produce 624 systems for the Squad Multipurpose Equipment Transport, or SMET, program under the contract and will begin delivery in the second quarter of fiscal 2021, an Army spokesperson confirmed to Defense News. Four companies were chosen at the end of 2017 to compete to build the robotic vehicle that will help troops carry equipment on the battlefield. A team of Applied Research Associates and Polaris Defense; General Dynamics Land Systems; HDT Expeditionary Systems and Howe & Howe were selected to build 20 platforms each that were issued to two infantry brigade combat teams for testing and analysis of utility in the field. Polaris' MRZR X was evaluated as well as HDT's six-wheel drive Global Hunter WOLF, or Wheeled Offload Logistics Follower. Textron-owned Howe & Howe offered its Grizzly unmanned vehicle, which is powered by an electric engine. HDT's Global Hunter WOLF was recently picked, along with three other teams to include Textron and QinetiQ North America, to compete to build vehicles for the Robotic Combat Vehicle-Light effort. The Army selected those teams from an array of companies chosen to participate in a demonstration event in the fall of 2017 at Fort Benning, Georgia. Other companies that participated in that demonstration included American Robot Company; Lockheed Martin; AM General; Robo-Team NA; and QinetiQ North America. For the SMET program, the Army was looking for a vehicle that can carry about 1,000 pounds worth of soldier equipment. This equates to lightening the load of nine soldiers across an infantry squad. The Army wanted the robots to be able to travel 60 miles over three days and to be able to provide a spare kilowatt hour of power while moving and at least 3 kilowatt hours while stationary. https://www.defensenews.com/land/2019/10/31/heres-the-robotic-vehicle-that-will-carry-equipment-for-us-troops

All news