Back to news

June 20, 2018 | International, Naval

GenDyn contracted for parts for future submarine construction

James LaPorta

June 19 (UPI) -- The Department of Defense has awarded a contract to General Dynamics Electric Boat for work on the next nine Virginia-class attack submarines.

The contract award from Naval Sea Systems Command, announced Monday, is worth $225 million under the terms of cost-plus-fixed-fee contract, which is a modification to a previous Pentagon award, the Defense Department said.

The deal will see General Dynamics provide economic ordering quantity material -- parts ordered ahead of time -- for the next nine Virginia-class, nuclear-powered fast attack submarines, for work in fiscal 2019 through 2023.

The nine vessels are part of the Block V generation of the Virginia class. The first four have been ordered by the U.S. Navy already, with General Dynamics set to construct SSN-802 and SSN-803 and Huntington Ingalls Industries tapped for SSN-804 and SSN-805.

Work on the contract will occur in various locations throughout the United States and is expected to be complete in January 2019.

The total cumulative value of the contract will be obligated to General Dynamics at time of award -- the obligated funds will be allocated from Navy fiscal 2018 shipbuilding and conversion accounts and will not expire at the end of the current fiscal year, said the Pentagon press release.

https://www.upi.com/Defense-News/2018/06/19/GenDyn-contracted-for-parts-for-future-submarine-construction/8941529412778/

On the same subject

  • L3Harris Flies ARES Surveillance Aircraft Demonstrator

    September 1, 2021 | International, Aerospace

    L3Harris Flies ARES Surveillance Aircraft Demonstrator

    The ARES demonsatrator will help the U.S. Army decide on how best to replace its fleet of aging RC-12 Guardrail aircraft.

  • Airbus’s First Wide-Body Deal Since March Is for Sole Tanker-Jet

    September 29, 2020 | International, Aerospace

    Airbus’s First Wide-Body Deal Since March Is for Sole Tanker-Jet

    Charlotte Ryan Airbus SE announced its first wide-body order in almost six months -- for a single aerial refueling and transport aircraft based on an old model of its A330 jet. The A330 Multi-Role Tanker Transport or MRTT was ordered by Europe's multinational procurement body on behalf of NATO and will be available to the air forces of six nations, Airbus said in a statement Monday. The military purchase highlights the collapse in sales to airlines and leasing firms that traditionally dominate orders as the coronavirus crisis shatters travel demand. In normal times, Airbus and Boeing Co. would expect to have racked up dozens of orders for hundreds of planes over the summer. Airbus's last twin-aisle deal, for 10 A350-900 jets, was secured on March 31. Since then, the pandemic has compelled the Toulouse, France-based company to focus more on protecting existing orders by allowing its struggling customers to defer deliveries rather than targeting up new business. The tanker purchase comes after Luxembourg agreed to maximize participation in the shared program and means all three options for additional MRTT planes have been exercised, taking the total fleet to nine. In addition to air-to-air refueling, the jets can carry troops, cargo and be used for medical evacuation. Airbus will announce full order and delivery figures for September next week. https://www.bloomberg.com/news/articles/2020-09-28/airbus-s-first-wide-body-deal-since-march-is-for-sole-tanker-jet

  • Japan commits to local F-35 production

    July 31, 2020 | International, Aerospace

    Japan commits to local F-35 production

    by Jon Grevatt The Japanese Ministry of Defense (MoD) has confirmed plans to continue the local production of Lockheed Martin F-35 Lightning II Joint Strike Fighter aircraft. The move reverses a decision in late 2018 to cease local production at Japan's final assembly and checkout (FACO) facility in Nagoya and instead focus on the localised maintenance, repair, overhaul and upgrade (MRO&U) of F-35s. That move was previously prompted by the high cost of building the F-35s at the facility. However, a spokesperson from the MoD told Janes that the new decision to continue building the aircraft at the Japanese FACO facility was influenced by the declining costs of producing the F-35 locally. Producing the aircraft locally, said the spokesperson, is now cheaper than importing the F-35 from the United States. The spokesperson was speaking to Janes nearly three weeks after the United States government approved a potential USD23 billion deal to sell Japan an additional 105 F-35s. This Foreign Military Sale means Japan will operate a total of 147 F-35s, becoming the second-largest operator of the aircraft in the world. These aircraft will comprise 105 conventional take-off and landing (CTOL) F-35A aircraft and 42 units of the short take-off and vertical landing (STOVL) F-35B. The spokesperson said, “For the acquisition of F-35As in fiscal years (FY) 2019 and 2020... the Japanese MoD has decided to use domestic manufacturing at the FACO... It is confirmed that the unit cost of aircraft produced at the domestic FACO [facility] is less, compared to the unit cost of imported aircraft.” https://www.janes.com/defence-news/news-detail/japan-commits-to-local-f-35-production

All news