Back to news

November 23, 2022 | International, Aerospace

French minister says new Franco-German fighter top priority

A senior French minister reaffirmed backing for a new Franco-German-led fighter jet project on Wednesday after conflicting comments over the next stage of the $100 billion venture.

https://www.reuters.com/world/europe/french-minister-says-new-franco-german-fighter-top-priority-2022-11-23/

On the same subject

  • After the US Navy’s Bonhomme Richard catastrophe, a far-reaching crackdown on fire safety

    July 28, 2020 | International, Naval

    After the US Navy’s Bonhomme Richard catastrophe, a far-reaching crackdown on fire safety

    By: David B. Larter WASHINGTON – U.S. Navy brass is telling sailors and contractors to put fire safety at the center of their work in the shipyards and on the waterfront in the wake of a catastrophic fire aboard the amphibious assault ship Bonhomme Richard. As Naval Sea Systems Command continues its formal assessment of the damage to Bonhomme Richard, the Navy has both sailors across the organization and contractors working on the ships reviewing their procedures and ensuring they are doing everything possible to prevent a second tragedy. Adm. Michael Gilday, the chief of naval operations, said the enterprise-wide effort was to prevent a similar event from taking place, a lesson he drew from the Navy's response to a string of accidents in 7th Fleet in 2017. “Could there be another Bonhomme Richard waiting to happen? If you go back to 2017, who would have predicted we'd have had two collisions of that magnitude within a month?” Gilday said in a July 16 interview with Defense News. “So, I'm not waiting for ‘No. 2' to decide we have a trend here. In a situation like this, one incident is enough for me to determine that there could be a trend and I'm not going to leave it to chance that there might be.” In the wake of the fire, he ordered fleet commanders to send a lengthy list of requirements to the waterfront, including a mandate to do fire safety inspections of every space on every ship. So-called “zone inspections” of each space on a ship are generally spread out over months, rather than packed into a week. The orders also included reviewing maintenance records on all damage control equipment – such as fire hoses and fire main connections, fire extinguishers, fixed fire suppression systems and firefighting gear – and ensure it is 100 percent accounted for. Additionally, each in-port duty section (a rotating group of sailors from the crew designated to stay on board the ship for 24 hours) was required to undergo a formal assessment as to their proficiency in firefighting and validate that they were properly manned to be effective. Contractors and shipbuilders have also been warned by the Navy to take fire safety seriously. In the days following the Bonhomme Richard fire, two minor fires – one on board the amphibious assault ship Kearsarge at General Dynamics NASSCO shipyard and another on the Navy's future carrier John F. Kennedy at Newport News shipbuilding – have curtailed work and prompted a doubling down on safety. In a Friday letter, Navy's top acquisitions official James Geurts told shipbuilders and contractors to take Bohnomme Richard as a lesson. "Anyone who steps aboard our ships must be ever vigilant about ensuring fire safety," Geurts wrote. "I urge you to use [the recent fire] to ensure that our work spaces are clean, that unnecessary clutter is removed, that all fire safety measures are being followed and that there is unrestricted access to firefighting and damage control equipment." ‘Gutted' The safety crackdown follows the Navy's worst in-port disaster since the 2012 fire on board the attack submarine Miami, which suffered a major conflagration while in deep maintenance at Portsmouth Naval Shipyard in Maine. That incident was later determined to be arson. The Bonhomme Richard fire, which experts fear may have damaged the “big deck” amphib beyond repair, raised troubling questions about how prepared sailors are to combat one of their most fearsome enemies: a shipboard fire, a threat they are trained to deal with from their earliest days in Boot Camp. In a letter this week from Gilday to all Navy flag officers and top enlisted leaders, he detailed how a series of explosions and a 1,200-degree inferno caused “extensive damage” to 11 of Bonhomme Richard's 14 decks. “There is fire and water damage, to varying degrees, on 11 of 14 decks,” Gilday wrote. “With the flight deck as a reference, I walked sections of the ship 5 levels below and had the opportunity to examine the superstructure. “The island is nearly gutted, as are sections of some of the decks below; some perhaps, nearly encompassing the 844 ft length and 106 ft beam of the ship ([Naval Sea System Command's] detailed assessment is ongoing). Sections of the flight deck are warped/bulging.” The fire on the Bonhomme Richard broke out the morning of July 12 while it was pierside in San Diego, California, undergoing maintenance. The blaze was aided by wind and explosions, Gilday wrote. “While response from the crew and federal firefighters was rapid, preliminary reports indicate there were two main factors that contributed to the intensity, scope, and speed of the fire,” Gilday wrote. “First was wind that fueled the fire as the vehicle storage area leads to the well deck, which opens to the air at the stern gate. The second were the explosions, one in particular, reportedly heard about 13 miles away. “The explosions, some were intense, and the uncertainty of their location and timing, led to a situation, that might have been under control late Sunday night, but expanded into a mass conflagration, spreading quickly up elevator shafts, engine exhaust stacks, and through berthing and other compartments where combustible material was present.” The Navy has launched dual investigations into the fire: A safety investigation, which are generally not released to the public so that witnesses can feel free to speak openly, and a more formal administrative investigation, which generally comes with disciplinary recommendations and are releasable to the public. https://www.defensenews.com/naval/2020/07/25/after-the-us-navys-bonhomme-richard-catastrophe-a-far-reaching-crackdown-on-fire-safety/

  • Contract Awards by US Department of Defense - March 03, 2020

    March 4, 2020 | International, Aerospace, Naval, Land, C4ISR, Security

    Contract Awards by US Department of Defense - March 03, 2020

    AIR FORCE Northrop Grumman Systems Corp., Linthicum Heights, Maryland, has been awarded a $262,281,057 firm-fixed-price modification (P00027) to contract FA8615-17-C-6047 for Active Electronically Scanned Array radars of Air Force F-16 aircraft. This modification is for the exercise of options to include 15 engineering, manufacturing and development (EMD); and 90 production radars, as well as associated support equipment and spares. Work will be performed at Linthicum Heights, Maryland, and is expected to be completed by December 2022. The total cumulative face value of the contract is $553,448,803. Fiscal 2020 research and development funds in the amount of $34,182,567; fiscal 2018 procurement funds in the amount of $88,201,189; and fiscal 2020 procurement funds in the amount of $197,955,911 are being obligated at the time of award. The Air Force Life Cycle Management Center, Fighter Bomber Directorate, F-16 Division, Wright Patterson Air Force Base, Ohio, is the contracting activity. CAE USA-Mission Solutions Inc., Tampa, Florida, has been awarded a $10,586,540 firm-fixed-price modification (P00033) to contract FA4890-17-C-0006 for the F-15E, F-16 and F-22A contract aircrew training and courseware development contract. The contract modification is for exercising Option Year Three. The total cumulative face value of the contract is $50,064,347. Fiscal 2020 operations and maintenance funds will be obligated in the amount of $10,586,540 by April 1, 2020. The performance locations are as follows: Langley Air Force Base (AFB), Virginia; Seymour Johnson AFB, North Carolina; Shaw AFB, South Carolina; Tyndall AFB, Florida; Nellis AFB, Nevada; Hill AFB, Utah; and Mountain Home AFB, Idaho. Work is expected to be completed by March 31, 2021, for this option period. Air Combat Command Acquisition Management and Integration Center, Langley AFB, Virginia, is the contracting activity. ARMY Technica, Charleston, South Carolina, was awarded a $181,708,286 cost-plus-fixed-fee, firm-fixed-price contract for logistics support services at Fort Bliss, Texas. Bids were solicited via the internet with seven received. Work will be performed in Fort Bliss, Texas, with an estimated completion date of April 3, 2025. Fiscal 2020 operations and maintenance, Army funds in the amount of $181,708,286 were obligated at the time of the award. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity (W52P1J-20-F-0184). Airbus Helicopters Inc., Grand Prairie, Texas, was awarded a $122,655,293 modification (P00012) to contract W58RGZ-18-C-0007 for procurement of 15 UH-72 Aircraft. Work will be performed in Columbus, Mississippi, with an estimated completion date of Aug. 31, 2022. Fiscal 2018 aircraft procurement, Army funds in the amount of $122,655,293 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. The Ross Group Construction Corp., Tulsa, Oklahoma, was awarded a $26,755,960 firm-fixed-price contract to renovate Bldg. 1634 Volar Barracks, Fort Polk, Louisiana. Bids were solicited via the internet with six received. Work will be performed in Fort Polk, Louisiana, with an estimated completion date of Nov. 12, 2021. Fiscal 2020 operations and maintenance, Army funds in the amount of $26,755,960 were obligated at the time of the award. U.S. Army Corps of Engineers, Fort Worth, Texas, is the contracting activity (W9126G-20-C-0013). NAVY QED Systems Inc., Virginia Beach, Virginia (N64498-20-D-0005); Gryphon Technologies LC, Washington, District of Columbia (N64498-20-D-0006); McKean Defense Group LLC, Philadelphia, Pennsylvania (N64498-20-D-0007); and HII Fleet Support Group LLC, Virginia Beach, Virginia (N64498-20-D-0008), are awarded $49,497,614 for an indefinite-delivery/indefinite-quantity, cost-plus-fixed-fee contracts for services related to technical, process and programmatic support for integrated logistics and technical documentation. Work locations will vary according to individual task orders; 25% of the work will be executed in Philadelphia, Pennsylvania; and 75% of work will be accomplished at contractor site locations to include Philadelphia, Pennsylvania; Norfolk, Virginia; San Diego, California; Marionette, Wisconsin; Kings Bay, Georgia; Port Hueneme, California; Corona, California; Honolulu, Hawaii; Bremerton, Washington; Mayport, Florida; Mechanicsburg, Pennsylvania; Yokosuka, Japan, Manama, Bahrain; Washington, District of Columbia, and other areas as directed. Work is expected to be completed by March 2025. Fiscal 2020 operations and maintenance (Navy) funding in the amount of $100,000 ($25,000 per task order) will be obligated at time of award via individual task orders and will expire at the end of the current fiscal year. These contracts are the result of a full and open competitive procurement via the Federal Business Opportunities website. Seven offers were received and in accordance with 10 U.S. Code 2304(a). The Naval Surface Warfare Center, Philadelphia Division, Philadelphia, Pennsylvania, is the contracting activity. Aptim Federal Services LLC, Alexandria, Virginia, was awarded a $10,498,157 firm-fixed-price task order (N62473-20-F-4299) under a multiple award construction contract for a mini-mart and gas station at Naval Base San Diego. Work will be performed in San Diego, California, and consists of fuel dispensers and overhead canopies. The mini-mart will include a covered retail area, a walk-in beverage cooler, and reach-in coolers and freezers. Additionally, the building will include a receiving area, patron restrooms, employee lounge, office and support spaces. Work is expected to be complete by December 2021. Fiscal 2020 non-appropriated funds (Navy) and contract funds are obligated on this award and will expire at the end of the current fiscal year. Two proposals were received for this task order. Naval Facilities Engineering Command, Southwest, San Diego, California, is the contracting activity (N39430-15-D-1632). (Awarded Feb. 28, 2020) https://www.defense.gov/Newsroom/Contracts/Contract/Article/2100985/source/GovDelivery/

  • NATO space enterprise must throttle up — or risk falling short

    June 4, 2024 | International, Aerospace

    NATO space enterprise must throttle up — or risk falling short

    Opinion: Here are some actions NATO should undertake and articulate as specific objectives at the 2024 NATO summit in Washington.

All news