Back to news

January 28, 2021 | Local, Aerospace

‘First-class’ fighter pilot becomes eVTOL entrepreneur

BY NATASHA MCKENTY | JANUARY 28, 2021

Estimated reading time 14 minutes, 58 seconds.

Brandon Robinson's Royal Canadian Air Force (RCAF) and Top Aces fighter pilot exploits compare to those of a protagonist in a blockbuster movie. After graduating from the Royal Military College of Canada with First Class Honours, his career quickly skyrocketed from frontline fighter squadron to being selected for the prestigious Fighter Weapons Instructor Course (FWIC) – the Canadian version of Top Gun. He obtained an MBA at Royal Roads University, and then did a tour in Ottawa where he “managed over $4 billion in procurement projects for the Fighter Force.”

He spent the next few years instructing for FWIC. “Think ‘Viper' from the movie Top Gun,” he laughed.

I then completed our Joint Command and Staff College program for those flagged for senior leadership.”

While instructing for FWIC, Robinson earned the CF-18 fighter pilot instructor role at 410 Squadron in Cold Lake, Alberta, leading into oversight of CF-18 Fleet Tactical Standards, and then onto senior project management with a deputy director role in multiple Air Force projects.

Robinson is modest. He credits his competitive nature “and a lot of luck” for his success.

“I fully acknowledge that without exceptionally talented and competitive friends, I would not have passed, let alone have been fortunate enough to fly jets,” he told Skies.

He found Military College to be physically and emotionally demanding, having a way of teaching you your limits and how to “be at peace with them.” Despite the challenges, he was one of the top five engineers in the program all four years.

For Robinson, aviation was innate. His grandfather, RCAF Capt Eric Robinson was a Second World War bomber pilot. His father, Brian Robinson, began flying at the age of 14, but his hopes of joining the Air Force were grounded when he learned his vision wasn't good enough.

“My father was very young when he and [my grandfather] built from scrap metal what is now a family airplane — an old RC-3 Republic Seabee aircraft.” Brian retired from his day job to turn the family hobby into a successful custom aviation engineering business.

There was always “an army of airplanes” in and around Robinson's home.

The first time Robinson piloted a plane, he was three years old. His grandfather let him sit in the seat in front of him. “I couldn't sit. I had to stand,” he laughed. “He said, ‘OK, you have control, so take us over there.'”

That experience “made an imprint” for Robinson. After high school, much to his “mother's chagrin,” he joined the RCAF to “fly fast jets.”

After military training, “there's a big [graduation] ceremony where they hand out the slots, and I remember looking at the card and seeing the CF-18 symbol on the bottom,” he said. Internally, he was bursting.

Not surprisingly, when asked about the memorable moments of his career, he said it's difficult to choose.

Robinson recalled, after being on the Squadron for just three months in Bagotville, Quebec, he was deployed to Hawaii for a joint exercise with the U.S. Navy.

“The U.S. Navy has this big exercise, and the Canadians were asked to go,” he said. “So, we ferried CF-18s across the country, from Quebec to Comox, British Columbia. We overnighted, met up with an aerial refueler and then the next thing I know I'm in the middle of the Pacific Ocean, tanking off a refueler. There's a portion where, if you can't get gas, you're going to have to eject because you can't get back to land. I'm a 27-year-old kid who only has 200 hours of experience in this CF-18, and I'm over the middle of the ocean thinking, ‘OK, you better make this happen.' It's not the easiest maneuver either,” he laughed.

Robinson shared the story of how he earned his call-sign: Repo. “I was flying, and my left engine essentially blew up; one of the main turbine hubs fractured. It severely crippled the aircraft, placing it into a reversionary control architecture. The engine was destroyed, and the aircraft was on fire,” he said.

After 10 “very long seconds” of being “out of control,” he “dealt with the fire” and regained control.

“I was able to land it safely back at the base. However, it was too badly damaged to fix. So, the joke was that the government had to repossess or repo it,” he laughed. “The damaged engine almost fell out when I landed.”

He remembered flying low-level over the ocean while “shooting missiles at drones and dropping bombs on remote-controlled moving ships; being in front of 100 angry fighter pilots leading a NATO coalition strike mission; [and] early morning departures over Torrey Pines in California to dogfight over the ocean.”

In 2018, with 20 years of service and a list of neck and spine injuries in his rear-view, he knew it was time to find adrenaline elsewhere. “You can't pull seven-and-a-half Gs for 20 years without hurting a few things,” he laughed.

Leaving, he admitted, was a difficult decision, but entrepreneurship was also on his radar.

The kid that grew up in rural Ontario, Canada, with an “army of airplanes” at his disposal and a military career most would envy, headed out to his next call of duty. He joined forces with his father to start Horizon Aircraft, an aerospace startup that is currently developing the Cavorite X5 — a new eVTOL (electric vertical take-off and landing) design for the urban air mobility market.

Horizon has been developing the Cavorite X5 for the past two years. The concept for the X5 came from the company's initial prototype, the X3 — an amphibious design with a hybrid electric power system. “When we were asked to push the performance even further, we naturally began investigating distributed electric propulsion and the potential for eVTOL modification of the core X3 concept,” explained Robinson. “That's how the X5

The five-seat Cavorite X5 is powered by an electric motor coupled with a high-efficiency gas engine, but is ultimately built for fully electric flight. Horizon is building the aircraft to fly at speeds up to 350 kilometers per hour, with a 450-km range.

The focus is to produce an aircraft “able to do real work in harsh environments,” including disaster relief, medevac, air cargo and personnel transport.

Today, Robinson has his hands full with multiple patents pending, including a “fan-in-wing design” that would allow the Cavorite X5 to fly either like a conventional aircraft or an eVTOL when required. The X5 “flies like a normal aircraft for 99 percent of its mission,” said Robinson. The wing design “allows the aircraft to return to normal wing-borne lift after its vertical portion is complete; when moving forward, the wings close up and hide the vertical lift fans.”

Horizon is working towards a large-scale prototype it hopes to have flying by the end of 2021.

Robinson has become comfortable fielding questions based on skepticism. He's built an army of support from his highly-skilled network, including Virgin Galactic test pilot and close friend, Jameel Janjua. “Our team is extremely experienced, formed out of my father's previous custom aviation engineering business. We also have an individual leading the technical development who has designed, built and tested two novel aircraft designs from scratch.

https://skiesmag.com/news/first-class-fighter-pilot-evtol-entrepreneur

On the same subject

  • Shipbuilding industry pushes back as federal government shops for used icebreaker

    October 6, 2020 | Local, Naval

    Shipbuilding industry pushes back as federal government shops for used icebreaker

    Murray Brewster The federal government is in the market for another used icebreaker that could be converted for use by the Canadian Coast Guard on the Great Lakes — much to the dismay of shipbuilders across the country. A request for proposals to acquire an existing light icebreaker was posted on the government's procurement website in mid-September. The timing is interesting. Federal decision-makers have known for five years that the coast guard needs such a vessel for the region. The request for proposals — which closes at the end of October — was posted as U.S. lawmakers began to push bipartisan legislation through Congress to strengthen the U.S. Coast Guard's capacity to break ice and keep commerce flowing on the Great Lakes. The plan for Canada to buy a used icebreaker follows a separate decision by Transport Canada to purchase a used ferry from Spain on an emergency basis. Build them here, says industry The Canadian Marine Industry and Shipbuilding Association (CMISA), which represents most of the marine suppliers and shipyards across the country, said both decisions represent a loss of domestic jobs and at least $250 million in federal spending that could have gone into a Canadian economy hard hit by the coronavirus. "We're of the strong belief that vessels such as light icebreakers can and should be built in Canada," said Colin Cooke, president and chief executive officer of the shipbuilding association. "We have the capacity. We have the skilled trades. We have the expertise, the technical expertise. We have the shipyards. And that was what the point of the National Shipbuilding Strategy was all about." That shipbuilding strategy is supposed to direct government work to Canadian shipyards. Cooke said the plan to purchase an existing icebreaker and the deal to acquire a former Spanish ferry would both be unacceptable in normal times — but they're even less acceptable now. "We are in a COVID time when we're looking for all sorts of ways to make sure that people are employed, that businesses are able to survive — I won't say thrive, I will say survive — through the lockdowns caused by this pandemic," he said. Public Services and Procurement Canada was asked for comment last Thursday but did not respond. The tender for the light icebreaker, posted online Sept. 18, describes the purchase as a necessary interim step for the coast guard to "bridge the gap while awaiting the delivery of dedicated new vessels." Significantly, the request for proposals noted that the need for such a ship was identified five years ago — around the same time a comprehensive analysis warned that the coast guard icebreaking fleet was in dire straits and in need of immediate replacement. "In 2015-16 the CCG identified a requirement for interim icebreaking capabilities to fill gaps in capacity resulting from ships being temporarily withdrawn from service" for refit and life extension, said the tender. Two years ago, the Liberal government concluded a deal worth $827 million with Chantier Davie of Levis, Que., which operates the Davie shipyard, to refit three medium-sized commercial icebreakers for the coast guard. Used icebreakers could be scarce Tim Choi, a University of Calgary shipbuilding expert, said this recent tender suggests the federal government is operating on the flawed assumption that there is an abundance of used icebreakers on the market. The deal with the Davie shipyard was an anomaly and federal officials "got lucky" last time because there happened to be three vessels available, he said. Choi said he believes the federal government isn't likely to be so fortunate this time: his research suggests there may be only one light icebreaker out there that would fit in the bill — in Finland — and it's not clear the Finns are ready to part with it. "There are very few requirements for a vessel like that outside of Canada and the United States in the Great Lakes, St. Lawrence region," said Choi. "It's not like there's a used car lot where you can just go out and buy these things." The shipbuilding association said it can make a strong case for a fast-track build in Canada. Choi said he believes procurement services may be forced in that direction anyway because of market conditions. In mid-September, three U.S. senators — Tammy Baldwin (D-WI), Todd Young (R-IN) and Gary Peters (D-MI) — introduced the Great Lakes Winter Commerce Act. The bipartisan legislation is expected to codify the U.S. Coast Guard's icebreaking operations on the Great Lakes and, more importantly, increase the size of its fleet. "Inadequate icebreaking capacity in the Great Lakes is costing us thousands of American jobs and millions in business revenue," said Baldwin in a statement. "We must boost our icebreaking capacity in the Great Lakes to keep our maritime commerce moving." https://www-cbc-ca.cdn.ampproject.org/c/s/www.cbc.ca/amp/1.5751143

  • J85 Draft RFP

    November 3, 2021 | Local, Aerospace

    J85 Draft RFP

    LETTER OF INTEREST: J85 PROPULSION GROUP SUSTAINMENT (PGS) W8485-22SA02/A The Department of National Defence, Director General Aerospace Equipment Program Management, has a requirement for airworthy, cost-effective, and performance-based, support for the General Electric J85-CAN-40 Propulsion Group systems of the Royal Canadian Air Force CT114 Tutor fleet. This is a long-term requirement to the End of Life of the aircraft fleet. The intent of this LOI is to solicit market information, including availability and delivery schedule, as well as to determine industry interest in responding to a potential Request for Proposal. The RFP can be found (attached).

  • Frigate design decision challenged in Federal Court, putting $60B program in limbo

    November 23, 2018 | Local, Naval

    Frigate design decision challenged in Federal Court, putting $60B program in limbo

    Murray Brewster · CBC News Winning bid 'incapable of meeting three critical mandatory requirements,' says Alion Canada One of the losing bidders in the competition to design the navy's next generation of warships has asked the Federal Court to overturn the recent decision to award the contract to a group of companies led by Lockheed Martin Canada. Alion Science and Technology Corp. and its subsidiary, Alion Canada, asked for a judicial review on Friday — a challenge that could mean more delays to the $60 billion program. The company had pitched the Dutch-designed De Zeven Provinciën Air Defence and Command (LCF) frigate as their solution for the Canadian navy. It's asking the court to set aside an Oct. 19 decision to select Lockheed Martin Canada the preferred bidder and to prevent the federal government from entering into negotiations with the company, which has offered up the BAE Systems-designed Type 26 frigate. In their court filing, Alion officials argue that the winning bid was "incapable of meeting three critical mandatory requirements" of the design tender. Notably, they say the Type 26 cannot meet the mandatory speed requirements set out by the navy and that both Public Services and Procurement Canada and Irving Shipbuilding, the yard overseeing the construction, should have rejected the bid outright. Alion said it "submitted a fully-compliant and conforming bid at enormous expense" and argued it "has been denied the fair treatment (it was) owed." The court application also points out that the design tender was amended 88 times during the 22 months it was under consideration and that the changes "effectively diluted the [warship] requirements" and allowed the government and Irving to select "an unproven design platform." Rising cost estimates Over two years ago, the Liberal government said it wanted to select a "mature design" for the new frigates, rather than designing a warship from scratch. Former public works minister Judy Foote said it would be a faster, cheaper solution. Unlike its two competitors, the Type 26 has yet to enter service with the Royal Navy and competitors have privately knocked it as "paper ship." Navantia, a Spanish-based company, was the other failed bidder. It headed a team that included Saab and CEA Technologies and proposed the F-105 frigate design, a ship in service with the Spanish navy. The Liberal government plans to build 15 new warships and hoped to get construction underway in the early 2020s. The program, which has been beset with delays and rising cost estimates, is intended to replace the navy's aging Halifax-class frigates, the backbone of the nation's maritime fighting force. Federal procurement officials had hoped to nail down a complete design contract with Lockheed Martin by the winter. The court challenge now puts that timeline in doubt. It also has enormous implications for Irving, which has been concerned about a slowdown in warship production between the current Arctic Offshore Patrol Ship program and the frigate replacements, which are formally titled 'Canadian Surface Combatants'. No one at Public Works or Lockheed Martin was immediately available for comment on Wednesday. https://www.cbc.ca/news/politics/frigate-design-decision-challenged-in-federal-court-putting-60b-program-in-limbo-1.4915501

All news