Back to news

October 21, 2018 | Local, Naval

Feds give Lockheed Martin first shot at $60-billion warship contract

By

OTTAWA — The federal government is giving U.S. defence giant Lockheed Martin the first crack at inking a contract to design Canada's $60-billion fleet of new warships.

Government officials say Lockheed's proposed design beat out two rival submissions in what has been a long and extremely sensitive competition to design replacements for the navy's entire frigate and destroyer fleets.

While the announcement marked the start of an important new phase in the largest and most expensive military purchase in Canadian history, it could also prove to be extremely controversial as some had questioned why the bid was allowed in the first place.

Still, Lockheed executives may not be popping the champagne just yet. Negotiators for both sides as well as Halifax-based Irving Shipbuilding, which will actually build the vessels, must now work out details — including the final cost — before an actual contract is awarded.

The stakes will be high for both sides, with hundreds of millions of dollars in play as well as pressure to make up for lost time as numerous delays — including in the design competition — have pushed the schedule for construction.

Irving has warned that it could be forced to lay off hundreds of employees if work on the warships is not ready to start by the time it finishes building the navy's new Arctic patrol ships in 2021 or 2022.

The Defence Department's head of military procurement, Patrick Finn, acknowledged the need for urgency.

But he also noted the need for care as whatever decisions are taken during the negotiations could have ramifications on the navy and taxpayers for decades.

“So it behooves us to stop and make sure we do the final checks in all of the areas,” Finn said this week in an interview.

Lockheed's victory is likely to be contentious as the federal government had originally said it wanted a “mature design,” which was widely interpreted as meaning a vessel that has already been built and used by another navy.

But the Type 26 frigate, upon which Lockheed's proposal is based, is only now being built by the British government and has not been used on operations.

The federal government has reserved the right to walk away from the talks — if Lockheed drives too hard a bargain — and negotiate with the second-place bidder, which was not identified. However, officials hope that won't be necessary and a contract will be signed this winter.

“We have notional time frames allocated,” said Andre Fillion, who oversees military and naval projects with Public Services and Procurement Canada.

“And should everything go according to plan, we're looking at winter 2019 for the award of the contract. If it doesn't go according to plan, then we go to Plan B — and obviously that would take longer.”

Lockheed's design was up against a pitch by U.S.-based defence company Alion, which proposed a design based on a Dutch frigate, and Spanish firm Navantia's proposal, which was modelled on a frigate used by the Spanish navy.

One of the big questions heading into the negotiations will be how much of Lockheed's design will need to be changed to reflect the navy's needs and how much the navy will have to shift its requirements because changing the design will take more time and money.

Government negotiators are also facing a potential battle over the amount of intellectual property that Lockheed will be required to hand over, which Ottawa wants so it can operate and maintain the vessels on its own after they are built.

Companies had originally been told that the winner would be required to turn over the full blueprints, but after significant resistance the two sides agreed the matter would be negotiated before a contract is awarded.

Officials remain focused on getting “the intellectual property access and rights that we need to not only build the ship but also to operate and maintain it for its entire life cycle,” Fillion said.

— Follow @leeberthiaume on Twitter

https://ipolitics.ca/2018/10/19/feds-give-lockheed-martin-first-shot-at-60-billion-warship-contract/

On the same subject

  • Titanic sub: Canada spent at least $2.4M on search plane | CTV News

    July 6, 2023 | Local, Aerospace

    Titanic sub: Canada spent at least $2.4M on search plane | CTV News

    It cost at least $2.4 million to deploy a single Canadian aircraft to search for the Titanic submersible that went missing on June 18, CTVNews.ca has learned.

  • May 2 is the last day to register for Canadian Defence Marketplace

    April 27, 2021 | Local, Aerospace, Naval, Land, C4ISR, Security

    May 2 is the last day to register for Canadian Defence Marketplace

    Don't miss your opportunity to conduct private and secure 1-on-1 meetings with over 200 government representatives and hundreds of industry leaders – all looking to connect and generate mutual growth. Here are just some of the Featured Companies attending Canadian Defence Marketplace on May 6 and November 4, 2021. Hurry, event registration closes May 2, 2021! Link to register: defenceandsecurity.ca/events/functionReg&eventID=454 Register today to start connecting – your ticket includes access to BOTH the May 6 and November 4, 2021 Canadian Defence Marketplace B2B/B2G events. Plus, receive access to our bonus speakers event – Canadian Defence Exchange – on May 5, 2021*. Already registered for Canadian Defence Marketplace? Congratulations, you have earned COMPLIMENTARY access to Canadian Defence Exchange! Please keep your eye on your inbox for an email to RSVP to save your seat. * Access to Canadian Defence Exchange is included in all Canadian Defence Marketplace registrations. Individuals who are already registered for Canadian Defence Marketplace will automatically earn access to Canadian Defence Exchange but will need to RSVP for the event through a link emailed to them. ​ ​ This eBlast is brought to you by Microsoft Discover Microsoft AI and cloud computing solutions for improved military operations. Download the white paper (Link: info.microsoft.com/ww-landing-Government-AI-and-Cloud-Computing-for-Defense.html?lcid=EN-CA&wt.mc_id=AID3022199_QSG_522768&ocid=AID3022199_QSG_522768 )

  • In pursuit of $19B contract, Sweden's Saab offers to build fleet of fighter jets in Canada

    May 31, 2019 | Local, Aerospace

    In pursuit of $19B contract, Sweden's Saab offers to build fleet of fighter jets in Canada

    David Pugliese, Ottawa Citizen Saab's offer further ups the ante on the competition that will see the federal government purchase 88 new aircraft A Swedish aerospace firm that hopes to supply Canada's new fleet of fighter jets says it could build the aircraft in this country, making maximum use of the expertise of domestic firms and creating high-tech jobs. Saab's pitch to build its Gripen E fighter jet in Canada further ups the ante on the $19-billion competition that will see the federal government purchase 88 new aircraft. The Liberal government has been emphasizing the transfer of new technology and expertise to Canadian aerospace firms as well as the creation of high-tech jobs as among its key goals for the fighter jet program. Another European firm, Airbus, has hinted it could also build its Typhoon fighters in Canada, but Saab said if the federal government wants the planes built on a domestic production line its commitment is solid. For the Canadian program, Saab is hoping to follow the same process that helped it win a recent fighter jet competition in Brazil. The first batch of Gripen E fighter jets are being built in Sweden but the technology is then being transferred to Brazilian firms so they can assemble the remaining aircraft. Certainly if that is what the customer values for Canada that is something that we can easily do “We think that is the model that makes sense for Canada,” Patrick Palmer, senior vice-president of Saab Canada, told Postmedia. “We're going down that path but we're also looking at how the (request for proposals) is written and what the customer values. Certainly if that is what the customer values for Canada that is something that we can easily do.” Aerospace firms have been told that the federal government will request their proposals in mid-July. The fighter jet competition was launched on Dec. 12, 2017 and at this point four aircraft are to be considered. Those include the F-35, the Super Hornet, the Eurofighter Typhoon and the Gripen. The Gripen E is the newest of the fighter jets being offered to Canada. The first Gripen E for the Swedish military is expected to be delivered later this year. The first of the 36 aircraft ordered by Brazil in a $5-billion program will be delivered in 2021. The first delivery of jets for the Canadian program is expected in the mid-2020s with the full capability available in the early 2030s, according to documents produced by the Department of National Defence. The issue of industrial benefits for Canadian companies will have a high profile in the competition. In early May the Canadian government told potential bidders it was making changes to its fighter jet competition to allow the U.S. to enter the F-35 stealth fighter. The changes, which industry sources say allow for a more flexible approach in determining the value of industrial benefits for the competition, came after a series of discussions with the U.S. government and threats by the Pentagon to withdraw the F-35 from consideration. Canada is a partner nation in the development of Lockheed Martin's F-35, and U.S. officials had warned that the agreement Canada had signed prohibits partners from imposing requirements for industrial benefits as firms from those nations compete for work on the jets. Over the last 12 years, Canadian firms have earned more than $1.3 billion in contracts to build F-35 parts. Per Alriksson of Saab Aeronautics said the Gripen is designed specifically for operations in the Arctic, giving it a leg up on other planes. “Sweden has air force bases in what you call the far North,” he added. “We operate there daily. (The Gripen) has Arctic DNA built into it.” Alriksson said the Gripen E can operate from remote airfields in the north, landing and taking off on runways less than 800 metres in length. It has a quick turnaround time for missions, with technicians able to reload and refuel the planes in 10 minutes. “It is pretty good in operating in dispersed locations as you have in Canada,” he added. Alriksson said the company can integrate U.S. and other equipment on the Gripen E so it is interoperable with American forces, another consideration for Canada. “Moving forward with the Gripen E, we see no problem whatsoever to integrate that fighter into a NORAD context.” https://nationalpost.com/news/in-pursuit-of-19b-contract-swedens-saab-offers-to-build-fleet-of-fighter-jets-in-canada

All news