Back to news

May 13, 2020 | International, Naval, C4ISR

Failure to communicate: US Navy seeks faster data transfers amid Arctic ice

WASHINGTON — Research in the Arctic Ocean is no small feat. The area can prove inaccessible at times, and sensors can fail to communicate data from under the ice or get crushed by slabs of ice.

But with the Arctic getting warmer and ice melting at an accelerated rate, the U.S. Navy is preparing to operate in newly available waterways. To do that effectively, the service knows it will take intense research to create durable, innovative solutions that can withstand harsh conditions, while also relaying data to researchers.

“If the Navy's thinking about having to run operations up there with submarines, surface vessels and aircraft, you really need to understand that operational environment,” Scott Harper, the Office of Naval Research's program manager for Arctic and global prediction, told Defense News in a May 4 interview. “Where is that sea ice and how quickly is it retreating? And what is it doing to the upper water column in the ocean?

"To really understand all that, you need to have a lot of observations.”

Navy and academic researchers are working together to improve the service's forecasting models in the Arctic. The Navy currently has research buoys, sensors and other technology floating in the water to track a variety of metrics: waves, atmospheric and water circulation, sea ice thickness and cover, speed at which the ice moves, and several other factors. All those metrics factor into Arctic forecasting.

In order to improve its forecasting capabilities, the Navy needs to improve its numerical models, or complex equations used in predictions. But to do that, the service needs more up-to-date data.

“These numerical models are kind of like balancing your checkbook,” Harper said. “You need to start with what your current checking account balances [to[ if you're going to predict what it's going to be at the end of the month. And so even if you had a perfect numerical model that you could use to make a forecast, if you don't know what the conditions are right now, you're not going to be able to forecast what the future state is going to be.”

To do this, the Navy wants to more quickly collect data through an effort called the Arctic Mobile Observing System, or AMOS. The program aims to create near-real-time data transmission of the sea condition under the ice, and communicate that information to the Navy via satellite.

“You have satellites that can look down at the surface of the Arctic Ocean and the sea ice conditions,” Harper said. “But what we don't have [is] the ability to look under the ice and understand what the ocean conditions are, and that's what we're really trying to enable with Arctic Mobile Observing System prototype.”

The AMOS program has deployed gliders underneath the sea that are collecting and storing data about the oceanic conditions under the ice, and tracking the location of frozen water using acoustics. In a few months, Harper said, researchers will send an icebreaker to the Arctic and gather the data collected by the gliders.

The Office of Naval Resarch, however, would like to bypass the multi-month delay involved in collected the data. To do so, the office plans to enable two-way communication so underwater sensors can communicate data via floating buoys in the ice that, in turn, communicate the data via satellites back to the Naval Oceanographic Office.

The project is currently two years into the five-year project. According to the project website, it's slated to end in fiscal 2023 with the recovery and evaluation of the initial prototype in the late summer of 2023.

Harper said the project's biggest success has been the navigation system that's currently working underneath the ocean surface.

“The fact that we can put sensors out that will know where they are without having to come to the surface to get a GPS fix — because they can't come to the surface because there's sea ice there for nine months out of the year," he said. "That's a big win.”

Another critical component to the real-time data collection are the buoys that ultimately must be able to survive the cruel nature of Arctic ice. The AMOS team has deployed prototypes of “ice-hardened” buoys that survived “multiple months” in the Arctic environment, Harper said, paving the way for a fully equipped communications buoy that can talk with underwater sensors.

“You can go out there and you can put your sensors in the ice, but a lot of times they'll fail,” Harper said. “And they'll fail because they'll get crushed in the ice or tipped over or toppled by changing ice conditions. And so the ability to deploy a buoy that is robust enough to survive the sea ice is one of the technological hurdles to doing this.”

https://www.c4isrnet.com/smr/frozen-pathways/2020/05/11/failure-to-communicate-us-navy-seeks-faster-data-transfers-amid-arctic-ice/

On the same subject

  • BAE shipyard sues Navy over extra work on USS Bataan

    September 23, 2020 | International, Naval

    BAE shipyard sues Navy over extra work on USS Bataan

    DAVE RESS BAE Systems' Norfolk shipyard is suing the Navy's Mid-Atlantic Regional Maintenance Center, claiming the yard is owed nearly $1.1 million for work it did on USS Bataan. The lawsuit contends that the Navy is refusing to pay for extra work that BAE and its subcontractors had to perform because the Navy didn't provide necessary supplies or complete needed work while Bataan was in the BAE shipyard. BAE won a $51.6 million, fixed-price contract to repair and modernize Bataan in September 2017. It was originally supposed to complete the work in July 2018, but that was extended to November 2018. When the ship was not delivered by then, the Navy declared BAE in default of the contract. BAE continued to work on the ship until March 2019. The lawsuit alleges that the Navy's challenges securing funds for additional work delayed completion. In addition, the lawsuit says the Navy's continued dumping of liquids into the bilge spaces prevented BAE from completing cleaning and pumping work. It also alleges that the Navy also expanded the work required, as when it directed the yard to add multiple pendant and wire installations on the Flight Deck Safety Nets. BAE said most of its claims for payment for the additional work were denied by the Navy's Contracting Officer in a formal final decision, prompting the shipyard to sue for the funds it claims it is owed. The Navy maintenance center has not yet filed a formal response to the BAE complaint. A spokesman was not immediately available for comment. https://www.pilotonline.com/business/shipyards/dp-nw-bae-bataan-20200922-3gangsit5zgtljyo2mgdvorcx4-story.html

  • Australia selects South Korea’s Hanwha in military vehicle competition

    July 27, 2023 | International, Land

    Australia selects South Korea’s Hanwha in military vehicle competition

    The Redback beat out competition from Germany company Rheinmetall’s KF41 Lynx vehicle.

  • DoD Taps Sea Machines for Autonomous VTOL Replenishment Vessels

    October 7, 2020 | International, Naval, C4ISR, Security

    DoD Taps Sea Machines for Autonomous VTOL Replenishment Vessels

    Seapower Staff BOSTON — Sea Machines Robotics, a Boston-based developer of autonomous command and control systems for surface vessels, has been awarded a multi-year Other Transaction agreement by the U.S. Department of Defense (DoD)'s Defense Innovation Unit (DIU), the company announced in an Oct. 5 release. The primary purpose of the agreement is to initiate a prototype that will enable commercial ocean-service barges as autonomous Forward Arming and Refueling Point (FARP) units for an Amphibious Maritime Projection Platform (AMPP). Under this OT agreement, Sea Machines will engineer, build and demonstrate ready-to-deploy system kits that enable autonomous, self-propelled operation of opportunistically available barges to land and replenish military aircraft. The kits will include Sea Machines' SM300 autonomous-command and control systems, barge propulsion, sensing, positioning, communications and refueling equipment, as well as items required for global deployment. Each modular kit will meet U.S. Navy criteria and will be in compliance with classifications and regulations from the DoD's aviation bodies. The contract includes a concept demonstration phase, with an option for following phases to deploy SM300 Operational Kits. The live concept demonstration is scheduled for the fourth quarter of 2020, in Washington state, for which Sea Machines has teamed with FOSS Maritime, a leading maritime transportation and logistics provider based in Seattle. FOSS will provide naval architecture, support engineering and operations management to outfit a remotely commanded deck barge to land helicopters and host a scaled fueling station for aircraft, surface vessels and shore replenishment. Using the SM300, shoreside operators will have remote situational awareness and will be able to demonstrate the capabilities of remote command and control of the vessel, her operating systems and flight deck. Sea Machines is the prime contractor for the multi-year contract and is working closely alongside FOSS Maritime and other significant industry leaders, including Huntington Ingalls, America's largest military shipbuilding company and a provider of professional services, based in Newport News, Virginia, and Bell Flight, a producer of commercial and military, vertical-lift aircraft, based in Fort Worth, Texas, to ensure a successful demonstration. “The AMPP autonomous replenishment systems will solve critical logistics challenges of expeditionary missions. We are pleased to enable this innovative capability, which will increase the effectiveness and flexibility for the U.S. military,” said Sea Machines' Phil Bourque, director, sales. “With Sea Machines systems already working off the waters of four continents, this project is well suited for us and one that we look forward to delivering on for the U.S. government.” “Foss is excited about this new opportunity with Sea Machines.This contract has led to discussions with Sea Machines in a number of other areas where their expertise can help Foss, including bringing more technology to our tug fleet. What they are doing in automation is very interesting and that technology could help our mariners and our vessels safety,” said FOSS's Will Roberts, chief operating officer. DIU's work is part of the DoD's Resilient Expeditionary Agile Littoral Logistics (REALL) Joint Capability Technology Demonstration (JCTD) project. Funded by the Office of the Secretary of Defense Research & Engineering, the JCTD Program addresses Combatant Command and Joint warfighting gaps through prototyping and demonstration of innovative and game-changing technologies. The following offices are involved with defining performance requirements and developing capabilities for REALL: U.S. Central Command, U.S. Transportation Command, U.S. Marine Corps Warfighting Laboratory, Naval Facilities Engineering and Expeditionary Warfare Center, Army Engineer Research and Development Center, and the Naval Aviation Warfare Center – Lakehurst. https://seapowermagazine.org/dod-taps-sea-machines-for-autonomous-vtol-replenishment-vessels/

All news