Back to news

December 17, 2023 | International, Aerospace

F-35 head warns future upgrades at risk, production shutdown possible

The Block 4 upgrades, which are intended to bring greater weapons capabilities and other features, are facing hardware maturity and software issues.

https://www.defensenews.com/air/2023/12/15/f-35-head-warns-future-upgrades-at-risk-production-shutdown-possible/

On the same subject

  • Des députés recommandent l’achat de 12 hélicoptères Caracal supplémentaires

    July 17, 2020 | International, Aerospace

    Des députés recommandent l’achat de 12 hélicoptères Caracal supplémentaires

    Auteurs d'une « mission flash » sur les hélicoptères et leurs carences, deux députés, Jean-Pierre Cubertafon (MODEM) et Jean-Jacques Ferrara (LR), demandent l'achat de 12 Caracal neufs plutôt que la location de H225 pour l'Armée de l'Air, un projet actuellement en cours au sein du Ministère des Armées. L'Armée de l'air bénéficie d'une commande de huit Airbus Helicopters Caracal dans le cadre du plan de relance aéronautique mais cette commande ne sera passée que d'ici la fin de l'année, rappellent les deux députés. L'achat des Caracal supplémentaires aurait un effet bénéfique pour Airbus Helicopters mais aussi Safran Helicopter Engines et plusieurs sous-traitants car la quasi-totalité des Caracal sont en effet produits en France avec des composants français. Air & Cosmos du 16 juillet 2020

  • Contract Awards by US Department of Defense - May 3, 2019

    May 6, 2019 | International, Aerospace, Naval, Land, C4ISR, Security, Other Defence

    Contract Awards by US Department of Defense - May 3, 2019

    U.S. SPECIAL OPERATIONS COMMAND Insitu Inc., Bingen, Washington, was awarded a maximum $23,000,000 modification (P00019) for an existing non-competitive, single award, indefinite-delivery/indefinite-quantity contract (H92222-16-D-0031) for Mid-Endurance Unmanned Aircraft Systems (MEUAS) 1.5B intelligence, surveillance, and reconnaissance (ISR) services. The $23,000,000 increase to a ceiling of $273,000,000 prevents gaps in ISR services until all task orders are transitioned to the current competitive MEUAS III contracts. Fiscal 2019 operations and maintenance funds in the amount of $7,354,530 are available for obligation at the task order level. U.S. Special Operations Command Headquarters, Tampa, Florida, is the contracting activity. NAVY Valiant Global Defense Services Inc., San Diego, California, is awarded $15,913,990 for firm-fixed-price task order M67854-19-F-7884 under previously award contract M67854-19-D-7876 to provide support services for the Marine Air Ground Task Force (MAGTF) Training Support Service (MTSS), MAGTF Staff Training Program (MSTP). Services will include pre-deployment training programs to Marine Corps operating forces, as well as command, control, communications, and computer mobile training team training at the functional and executive level to commanders and battle staffs, and technical training for operators and information managers. Work will be performed in Quantico, Virginia, and is expected to be completed by November 2020. Fiscal 2019 operations and maintenance (Marine Corps) funds in the amount of $5,380,849 will be obligated at the time of award and these funds will expire at the end of the current fiscal year. This order was competitively awarded under a multiple award task order contract. The Marine Corps Systems Command, Quantico, Virginia, is the contract activity. Lockheed Martin Corp., Fort Worth, Texas, is awarded $7,514,515 for modification P00015 to a previously awarded fixed-price-incentive-fee contract (N0001918C1048) to establish organic depot component repair capabilities for the F-35 Lightning II Air Interceptor System in support of the Air Force, Marine Corps and Navy. Work will be performed in Rochester, Kent, United Kingdom (81.6 percent); and Fort Worth, Texas (18.4 percent), and is expected to be completed in March 2023. Fiscal 2017 aircraft procurement (Air Force); and fiscal 2019 aircraft procurement (Navy, Marine Corp. and Air Force) funds in the amount of $7,514,515 are being obligated at time of award, $3,757,257 of which will expire at the end of the current fiscal year. This contract combines purchases for the Air Force ($3,757,257; 50 percent); Marine Corps ($1,878,629; 25 percent); and Navy ($1,878,629; 25 percent). The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. ARMY A4 Construction Company Inc.,* Sandy, Utah, was awarded a $12,309,817 firm-fixed-price contract for construction of a Special Operation Forces Human Performance Training Center. Bids were solicited via the internet with eight received. Work will be performed in Fort Carson, Colorado, with an estimated completion date of May 6, 2021. Fiscal 2019 military construction funds in the amount of $12,309,817 were obligated at the time of the award. U.S. Army Corps of Engineers, Omaha, Nebraska, is the contracting activity (W9128F-19-C-0018). DEFENSE LOGISTICS AGENCY Federal Prison Industries, Inc.,** doing business as UNICOR, Washington, District of Columbia, has been awarded a maximum $9,558,000 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for parkas. This is a one-year base contract with two one-year option periods. Locations of performance are Washington, District of Columbia; and Kentucky, with a May 2, 2020, performance completion date. Using military service is Navy. Type of appropriation is fiscal 2019 through 2020 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania (SPE1C1-19-D-F024). *Small business **Mandatory source https://dod.defense.gov/News/Contracts/Contract-View/Article/1836925/source/GovDelivery/

  • SASC Bill Adds Advanced Procurement To Navy’s Shipbuilding Funds

    May 31, 2019 | International, Naval

    SASC Bill Adds Advanced Procurement To Navy’s Shipbuilding Funds

    The Senate Armed Services Committee's (SASC) draft FY 2020 defense authorization bill would authorize a moderate amount of funds over the Navy's shipbuilding request for additional advanced procurement funds. According to the bill summary, the committee... https://www.defensedaily.com/sasc-bill-adds-advanced-procurement-navys-shipbuilding-funds/navy-usmc/

All news