Back to news

February 5, 2020 | International, Aerospace

Eurofighter submits updated proposal to HX programme

January 31, 2020 - Eurofighter has offered Finland the chance to join Europe's largest combat aircraft programme in an updated proposal to the HX fighter acquisition programme. The proposal has been submitted by the UK Government with the support of the Governments of Germany, Italy and Spain, the nations which are represented in the Eurofighter industry consortium.

It offers Finland sovereign control of its defence capability and security of supply as well as a combat proven, swing-role aircraft which will form the backbone of European defence for decades to come. The detailed proposal updates on the original offer made to the HX fighter acquisition programme to replace the Finnish Air Force's F-18 Hornet aircraft.

John Rossall, Campaign Director at BAE Systems which is working alongside the UK Government on the offer to Finland, said: We are delighted to present our updated proposal to Finland on behalf of the Eurofighter consortium. Our proposal is an invitation to Finland to join leading nations in Europe with a shared defence objective.

By choosing Eurofighter, the Finnish Air Force would not only be acquiring the most advanced, multi-role aircraft on the market, it would be choosing everything Finland needs to operate, maintain and control its own aircraft in peacetime and in times of crisis. In January, Eurofighter took part in the HX Challenge Flight Evaluation Trials, led by the Finnish Defence Forces in Tampere.

The trials saw two Royal Air Force jets perform over a five-day period to demonstrate many of the capabilities which form the offering of the Eurofighter consortium, which teams BAE Systems alongside leading European defence contractors Airbus and Leonardo. Ahead of the trials, representatives of the Governments of the UK, Germany, Italy and Spain confirmed their commitment to a capability roadmap which will keep Eurofighter in the frontline of European defence for decades to come.

View source version on Eurofighter: https://www.eurofighter.com/news-and-events/2020/01/eurofighter-submits-updated-proposal-to-hx-programme

On the same subject

  • Contracts for February 18, 2021

    February 19, 2021 | International, Aerospace, Naval, Land, C4ISR, Security

    Contracts for February 18, 2021

    Today

  • Army Ponders What To Cut If Budget Drops: Gen. Murray

    June 11, 2020 | International, Aerospace, Naval, Land, C4ISR, Security

    Army Ponders What To Cut If Budget Drops: Gen. Murray

    The Army Futures commander is making a list of which of the service's 34 top-priority programs to sacrifice first – and which programs outside the top 34 he has to save. By SYDNEY J. FREEDBERG JR.on June 10, 2020 at 4:18 PM WASHINGTON: The Army Secretary and Chief of Staff approved a draft spending plan for 2022-2026 yesterday that funds all 34 of the service's top-priority programs, the Army's modernization chief said this morning. But with the ever-growing cost of COVID looming over the economy and the Pentagon alike, Gen. John “Mike” Murray says he's already made a mental list of which of the 34 the service might have to slow down or sacrifice and which ones it absolutely has to save. “I have a one-to-N list in my mind” of the 34 programs, Murray told an Association of the US Army webcast this morning. “That's only in my mind, right now,” he emphasized. “It's pre-decisional.” In other words, it's not final, it's not official, and it's not ready to share with the public. All that said, however, it's still a telling sign of uncertain budget times that the four-star chief of Army Futures Command not only has such a list, but is willing to say he has it. Meanwhile, Murray's chief civilian partner, Assistant Secretary for Acquisition Bruce Jette, has launched a long-term study of the Army's economic prospects. In effect, Jette's looking at the supply side, asking how tight the budget will be, and Murray is looking at the demand side, asking what the Army should prioritize within that tight budget. Beyond The 34: “Critical Enablers” Gen. Murray is also looking at the Army's 684 other programs, he said, to determine which of them can be cut – while some have been slashed already to free up funding for the 34, others are so far unscathed – and which are essential to the top-34's success. “We can come up with, you know, the most impressive Next Generation Combat Vehicle in the world,” Murray said. “If you can't get fuel to it, then you're wasting your time.” Fuel is just one, particularly knotty logistical problem. Ultimately, Murray wants to reduce Army fuel demands by moving to hybrid diesel-electric motors. While electric power by itself might work for civilian cars, he said, he's skeptical the Army can charge batteries in combat, or that any practical amount of batteries can store enough energy to move, say, a 70-ton main battle tank. Likewise, while civilian quadcopters can run off batteries, the Army's new scout helicopter, the Future Attack Reconnaissance Aircraft, requires a high-powered turbine. So for decades to come, the Army will need fuel trucks, storage bladders, pumps, drums, hoses, and so on. And that's just for the gas. Both current and future combat systems require a staggering array of spare parts, repair tools, maintenance facilities, and more. Logistics is historically a US strength, but it's not a major focus of the 34 priority programs, which range from hypersonic missiles to smart rifles, from tanks to aircraft to robots. Besides weapons, the 34 do include a lot of high-tech information-age infrastructure, both to train the troops in virtual and augmented reality, and to share tactical data like target locations across the battlefield. There has not, however, been nearly as much emphasis on supporting functions such as fuel, maintenance, and transport. Murray now aims to fix that. Starting with a study by the Combined Arms Center at Fort Leavenworth, he said, the Army has come up with a list of “18 key critical enablers that are getting funded,” Murray said, again without naming them. Murray's calling the 34 priority programs “Tier One” and the 18 enablers “Tier Two,” he said. “Then tier three is ammo,” he added. The general didn't elaborate, but certainly a high-tech tank or aircraft can't fight without ammunition, just as it can't move without fuel. The catch is that, in modern warfare, you're not just buying rifle bullets and cannon shells, but a host of precision-guided munitions that are much more expensive to stockpile in bulk for a major war. Even once the Army has figured out which weapons, support systems, and ammunition it can afford to buy, it still won't be able to buy enough of them to equip every unit at once. The service's recent AimPoint study, Murray said, focused on figuring out which units around the world need to be modernized first and which will have to wait. “The whole point behind AimPoint was an understanding that you can't modernize the entire army overnight, or in a year, or really even in a decade,” Murray said. As a young officer, he recalled, his unit had M60 tanks and M113 transports “while the rest of the Army was running around in M1s and Bradleys.” While he doesn't to return to the extreme disparities of the past, he said, “somebody has to be first and somebody has to be last.” https://breakingdefense.com/2020/06/army-ponders-what-to-cut-if-budget-drops-gen-murray/

  • To develop hypersonic missile launcher, Pentagon seeks funding transfer

    July 10, 2019 | International, Aerospace, Other Defence

    To develop hypersonic missile launcher, Pentagon seeks funding transfer

    By: Jen Judson WASHINGTON — The Pentagon is looking to transfer $50 million within its fiscal 2019 budget to cover the cost of the design and development of a prototype mobile launcher for its Long Range Hypersonic Weapon, or LRHW. The Defense Department submitted an omnibus reprogramming requestto Capitol Hill on June 25, which congressional defense committees must approve. The department wants the additional funding for the mobile launch capability in order to reach “residual” operational capability by FY23. Developing hypersonic weapons, capable of flying five times the speed of sound, is a part of the Army's top modernization priority — Long-Range Precision Fires —because of the added capability it would bring in eliminating enemy systems in contested battlespace. There is also a need in the U.S> to develop an offensive hypersonic capability to stay ahead of similar weapon development underway by Russia and China. The mobile LRHW will bring online “a new class of ultra-fast, maneuverable, long-range missiles to neutralize enemy defensive weapons with rockets launched from trucks with Transporter Erector Launchers (TELs),” the reprogramming document states. Follow-on efforts will be funded through the Army's research, development, test and evaluation account in future budget years, the document adds. The Army is leading the Pentagon's effort — Conventional Prompt Strike — but is teamed with the Navy to develop a booster for the hypersonic missile and is building a common glide body internally with both the Navy and Air Force. The service is finishing design work for the prototypes and plans to conduct flight tests focused on range, environmental factors and contested environments. The plan is to field a battery-sized hypersonic weapon to soldiers by 2023. The service will use the Advanced Field Artillery Tactical Data System and M870 trailers to make the system road-mobile. The Army still needs to build a transporter-erector-launcher to simultaneously accommodate two hypersonic missiles, which is where the extra $50 million comes in. The service plans to spend $1.2 billion over the next five years beginning in FY20 on its hypersonic effort. In FY20 alone, the Army has budgeted $228 million. A total of $181 million is requested in FY21 to move through the preliminary design review, which will end in the first quarter of FY22. In FY22, the Army will conduct a critical design review and then begin testing all-up rounds at the end of the fiscal year into FY23. The service has budgeted $137 million in FY22 to accomplish those tasks. The Army will then move into full-system flight tests in FY23 using a $359 million budget. The service plans to outfit the Multi-Domain Operations Task Force's strategic fires battalion with the battery to field early combat capability to the force, but to also learn how to use the equipment; to develop possible tactics, techniques and procedures that might be used in combat; and to learn how to train to use the weapons. https://www.defensenews.com/land/2019/07/09/to-get-hypersonic-launcher-off-ground-dod-seeks-funding-transfer/

All news