Back to news

November 28, 2018 | International, Aerospace, Naval, Land, C4ISR, Security

Contract Awards by US Department of Defense - November 26, 2018

AIR FORCE

The Boeing Co., El Segundo, California, has been awarded a $383,421,855 cost-plus-incentive-fee, award-fee contract for the Protected Tactical Enterprise Service. This contract provides for a joint ground system to provide tactical satellite communications with enhanced anti-jam and low probability of intercept to tactical warfighters in contested environments. Work will be performed in El Segundo, California, and is expected to be completed by Dec. 31, 2025. This award is the result of a competitive acquisition and three offers were received. Fiscal 2018 and 2019 research, development, test and evaluation funds in the amount of $17,234,485 are being obligated at the time of award. Space and Missile Systems Center, El Segundo, California, is the contracting activity (FA8808-19-C-0001).

Raytheon Vision System, Goleta, California, has been awarded a $19,172,016 contract modification (P00012) to contract FA9453-17-C-0038 for the Fortress Program to push the state-of-the art infrared focal plane arrays. The contract modification is seeking to develop larger format and/or high operating temperature mid-wave infrared focal plane arrays for persistent surveillance applications. Work will be performed in Goleta, California, and is expected to be completed by Feb. 9, 2022. Fiscal 2018 and research, development, test and evaluation; and Title III funds are being obligated at the time of award. Total cumulative face value of the contract is $26,527,033. Air Force Research Laboratory, Kirtland Air Force Base, New Mexico, is the contracting activity.

Aerojet Rocketdyne Inc., Rancho Cordova, California, has been awarded a $9,452,398 cost-plus-fixed-fee contract for Advanced AF-M315E Engine Monopropellant Engine Development. This contract provides a contract vehicle the Air Force Research Laboratory, Aerospace Systems, and Rocket Propulsion Division can use to address technical needs for next-generation strategic, tactical, and spacecraft propulsion systems. Work will be performed in Redmond, Washington, and is expected to be completed by April 21, 2024. This award is the result of a competitive acquisition with five offers received. Fiscal 2018 research, development, test and evaluation funds in the amount of $900,000 are being obligated at the time of award. Air Force Test Center, Edwards Air Force Base, California, is the contracting activity (FA9300-19-C-0001).

DEFENSE INFORMATION SYSTEMS AGENCY

Qwest Government Solutions Inc., doing business as CenturyLink QGS, Herndon, Virginia, was awarded a non-competitive firm-fixed-price, indefinite-delivery/indefinite -quantity contract for a five-year period of performance for the continued operations and maintenance support for dark fiber and commercial facilities in the continental U.S. (CONUS) to support the Department of Defense. The guaranteed minimum amount is $1,000 and will be satisfied through task orders issued during the base year. The total amount of all orders placed against the contract shall not exceed $126,895,698. Performance will be at various locations within CONUS. The solicitation was issued on the basis of other than full and open competition pursuant to 10 U.S. Code 2304(c)(1), only one responsible source and no other type of supplies or services would satisfy agency requirements. The period of performance of this contract is Nov. 30, 2018, through Nov. 29, 2023. The Defense Information Technology Contracting Organization, Scott Air Force Base, Illinois, is the contracting activity (HC1013-19-D-0002).

ARMY

Lockheed Martin Corp., Orlando, Florida, was awarded a $79,383,886 modification (0006 03) to contract W52P1J-17-D-0043 for night vision sensor systems, subcomponent production and technical services for the Apache attack helicopter. One bid was solicited with one bid received. Work locations and funding will be determined with each order, with an estimated completion date of Oct. 31, 2021. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity.

Ludlow Construction Co. Inc.,* Ludlow, Massachusetts, was awarded a $24,401,154 firm-fixed-price contract for Durham Meadows waterline remedial design. Bids were solicited via the internet with four received. Work will be performed in Durham, Connecticut, with an estimated completion date of Dec. 20, 2021. Fiscal 2018 other environmental funds in the amount of $24,401,154 were obligated at the time of the award. U.S. Army Corps of Engineers, Concord, Massachusetts, is the contracting activity (W912WJ-19-C-0002).

Federal Resources Supply Co.,* Stevensville, Maryland, was awarded a $19,569,771 firm-fixed-price contract for refilling of fire suppression bottles and systems. Bids were solicited via the internet with one received. Work locations and funding will be determined with each order, with an estimated completion date of Nov. 26, 2023. U.S. Army Contracting Command, Warren, Michigan, is the contracting activity (W56HZV-19-D-0017).

CORRECTION: The $15,837,195 contract (W52P1J-19-C-0005) announced on Nov. 8, 2018, to Parsons Government Services Inc., Pasadena, California, was not awarded until Nov. 23, 2018. Fiscal 2019 research, development, test and evaluation funds in the amount of $7,179,000 were obligated at the time of the award.

U.S. SPECIAL OPERATIONS COMMAND

The Boeing Co., Mesa, Arizona, was awarded a $100,000 minimum, $45,000,000 maximum indefinite-delivery/indefinite-quantity, firm-fixed-price contract (H92241-19-D-0001) for 56 upgraded primary airframe structures for the A/MH-6 rotary wing aircraft. Fiscal 2018 procurement funds in the amount of $5,173,400 shall be obligated at the time of award. The majority of the work will be performed in Mesa, Arizona. This contract is a non-competitive award and is in accordance with Federal Acquisition Regulation 6.302.1. U.S. Special Operations Command, Tampa, Florida, is the contracting activity.

NAVY

Raytheon Missile Systems, Tucson, Arizona, is being awarded a $37,253,983 cost-plus-fixed-fee modification to previously-awarded contract N00024-18-C-5407 for procurement of fiscal 2019 U.S. Navy Standard missile SM-2 and Standard missile SM-6 intermediate-level repair and maintenance. Work will be performed in Tucson, Arizona (88 percent); Camden, Arkansas (11 percent); and Huntsville, Alabama (1 percent), and is expected to be completed by November 2019. Fiscal 2019 operations and maintenance (Navy) funding in the amount of $19,047,890 will be obligated at time of award and will expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.

BAE Systems Technology Solutions and Services Inc., Rockville, Maryland, is awarded a $13,903,935 firm-fixed-price contract for the operation and maintenance of Navy communication, electronic, and computer systems. The contract will include a 12-month base period and four 12-month option periods which if exercised, the total value of this contract will be $79,829,608. Work will be performed in Oahu, Hawaii (94 percent); and Geraldton, Australia (6 percent). Work is expected to be completed by November 2019; if all options are exercised, work will be completed by November 2023. Fiscal 2019 operations and maintenance (Navy) funds in the amount of $3,925,630 will be obligated at the time of award and funds will expire at the end of the current fiscal year. This contract was solicited on a full and open, unrestricted basis with two offers received. Naval Supply Systems Command Fleet Logistics Center Pearl Harbor, Regional Contracting Department, Pearl Harbor, Hawaii, is the contracting activity (N00604-19-C-4001).

Landscape Management Systems Inc.,* Tumon, Guam, is awarded an $11,426,341 modification under a previously awarded individual-delivery/indefinite-quantity contract (N40192-15-D-9008) to exercise the fourth option for base operations support services at Naval Base (NB) Guam and Naval Support Activity (NSA) Andersen, Guam. The work to be performed provides for all labor, supervision, management, tools, material, equipment, facilities, transportation and incidental engineering and other items necessary to accomplish work to perform all ground maintenance and tree trimming services for U.S. military facilities. After award of this option, the total cumulative contract value will be $48,598,810. Work will be performed in the Naval Facilities Engineering Command Marianas area of responsibility, including but not limited to, NB Guam (70 percent); and NSA Andersen, Guam (30 percent), and work is expected to be completed November 2019. No funds will be obligated at time of award. Fiscal 2019 operations and maintenance (Navy); fiscal 2019 operations and maintenance (family housing); and fiscal 2019 Navy working capital funds in the amount of $8,348,102 for recurring work will be obligated on individual task orders issued during the option period. The Naval Facilities Engineering Command Marianas, Guam, is the contracting activity.

*Small business

https://dod.defense.gov/News/Contracts/Contract-View/Article/1698166/

On the same subject

  • Behind Europe’s ammo pledge to Ukraine, some manufacturers grow leery

    June 19, 2023 | International, Land

    Behind Europe’s ammo pledge to Ukraine, some manufacturers grow leery

    Companies are looking for more guidance from the EU as they balance the need for speedy production with hefty market intervention from Brussels.

  • "Prepare For Worst-Case Scenarios": Xi Jinping To Chinese Military

    May 28, 2020 | International, Aerospace, Naval, Land, C4ISR, Security

    "Prepare For Worst-Case Scenarios": Xi Jinping To Chinese Military

    Xi Jinping's comments came amid a face-off between the militaries of India and China at the Line of Actual Control (LAC). WorldEdited by Divyanshu Dutta Roy (with inputs from PTI)Updated: May 28, 2020 08:01 am IST Beijing: Chinese President Xi Jinping on Tuesday ordered the military to scale up its battle preparedness, visualising the worst-case scenarios and asked them to resolutely defend the country's sovereignty. Though he did not mention any specific threat, his comments came amid a face-off between soldiers of India and China at the Line of Actual Control (LAC). Xi, 66 who is also the General Secretary of the ruling Communist Party of China (CPC) and head of the two-million-strong military with prospects of lifelong tenure in power, made the remarks while attending a plenary meeting of the delegation of the People's Liberation Army (PLA) and People's Armed Police Force during the current parliament session being held in Beijing. Xi ordered the military to think about worst-case scenarios, scale up training and battle preparedness, promptly and effectively deal with all sorts of complex situations and resolutely safeguard national sovereignty, security and development interests, state-run Xinhua news agency reported, without mentioning any specific issues that posed a threat to the country. Several areas along the LAC in Ladakh and North Sikkim have witnessed major military build-up by both the Indian and Chinese armies recently, in a clear signal of escalating tension and hardening of respective positions by the two sides even two weeks after they were engaged in two separate face-offs. The nearly 3,500-km-long LAC is the de-facto border between the two countries. China's military friction with the US has also been on the rise with the American navy stepping its patrols in the disputed South China Sea as well as the Taiwan Straits. Washington and Beijing are also engaged in a war of words over the origin of the coronavirus pandemic. On May 22, China, the second-largest military spender after the US, hiked its defence budget by 6.6 per cent to $179 billion, nearly three times that of India, the lowest increment in recent years amidst the massive disruption caused to the communist giant's economy by the COVID-19 pandemic. India has said the Chinese military was hindering normal patrolling by its troops along the LAC in Ladakh and Sikkim and strongly refuted Beijing's contention that the escalating tension between the two armies was triggered by trespassing of Indian forces across the Chinese side. The Ministry of External Affairs said all Indian activities were carried out on its side of the border, asserting that India has always taken a very responsible approach towards border management. At the same time, it said, India was deeply committed to protect its sovereignty and security. "Any suggestion that Indian troops had undertaken activity across the LAC in the Western sector or the Sikkim sector is not accurate. Indian troops are fully familiar with the alignment of the Line of Actual Control in the India-China border areas and abide by it scrupulously," MEA Spokesperson Anurag Srivastava said at an online media briefing last week. https://www.ndtv.com/world-news/xi-jinping-to-chinese-military-prepare-for-worst-case-scenarios-2235615

  • India approves purchase of military equipment worth $8.5 bln

    March 16, 2023 | International, Other Defence

    India approves purchase of military equipment worth $8.5 bln

    India on Thursday approved purchases of missiles, helicopters, artillery guns and electronic warfare systems worth $8.5 billion as it sought to add more teeth to its military.

All news