Back to news

November 18, 2019 | International, Aerospace, Naval, Land, C4ISR, Security

Contract Awards by US Department of Defense - November 15, 2019

AIR FORCE

Lockheed Martin Corp., Littleton, Colorado, has been awarded a ceiling amount of $3,329,600,000 single award, indefinite-delivery/indefinite-quantity contract for combined orbital operations, logistics and resiliency support services. This contract provides for operations, sustainment and enhancement activities to support the Advanced Extremely High Frequency, Milstar and Defense Satellite Communications System III programs. Work will be performed at Peterson Air Force Base, Colorado; Schriever Air Force Base, Colorado; and Sunnyvale, California, and is expected to be completed by Nov. 30, 2029. This award is the result of a sole source acquisition. No funds will be obligated on the basic contract and the type of funding will be obligated on subsequent task and delivery orders. The Space and Missile System Center, Peterson Air Force Base, Colorado, is the contracting activity (FA8823-20-D-0001).

Raytheon Co., Largo, Florida, has been awarded an $86,756,767 cost-plus-fixed-fee contract for the Presidential and National Voice Conferencing (PNVC) Integrator contract. The PNVC capability is a new requirement for use by the president of the United States (POTUS), secretary of defense, chairman of the Joint Chiefs of Staff, combatant commanders and other senior leaders. The POTUS and national leadership require worldwide, secure, survivable voice conferencing capability that supersedes and improves upon the existing Milstar Survivable Emergency Conferencing Network system. The PNVC capability will incorporate improved voice quality, reduced latency, high availability, increased number of subscribers and a new conference management capability for the user community. Work will be performed at Marlborough, Massachusetts, and is expected to be completed by September 2024. This award is the result of a sole source acquisition. Fiscal 2020 research, development, test and evaluation funds in the amount of $2,000,000 are being obligated at the time of the award. The Family of Advanced Beyond Line-of-Sight Terminals Contracting office, Hanscom Air Force Base, Massachusetts, is the contracting activity (FA8735-20-C-0001).

Bismark Construction Corp., Newark, New Jersey, has been awarded a $17,108,605 modification (P00009) to previously awarded contract FA4484-16-D-0003 for maintenance and repair services requirement contract. This modification provides for the exercise of Option Four for the period of performance Nov. 16, 2019, through Nov. 15, 2020. Work will be performed at Joint Base McGuire-Dix-Lakehurst, New Jersey, and is expected to be complete by Nov. 15, 2020. The total cumulative face value of the contract is $85,540,325.00. Fiscal 2020 operations and maintenance funds will be used and no funds are being obligated at the time of award. The 87th Contracting Squadron, Joint Base McGuire-Dix-Lakehurst, New Jersey, is the contracting activity.

AT2 LLC, Severn, Maryland, has been awarded a $14,495,776 modification (P00010) to previously awarded contract FA4890-18-C-0008 for Air Combat Command and Air Force Global Strike Command Primary Training Ranges operations and maintenance support services. This contract provides for operating materials and supplies of range threat, scoring and feedback systems. Work will be performed at Dare County Range, North Carolina; Poinsett Range, South Carolina; Grand Bay Range, Georgia; Avon Park Range, Georgia; Snyder Range, Texas; Belle Fourche Range, South Dakota; Holloman Ranges, New Mexico; Mountain Home Ranges, Idaho; and Guam Range, Guam. Work is expected to be completed by Dec. 31, 2022. Fiscal 2020 operations and maintenance funds in the amount of $13,871,092 are being obligated at the time of award. Headquarters Air Combat Command, Joint Base Langley-Eustis, Virginia, is the contracting activity.

NAVY

Bechtel Plant Machinery Inc., Monroeville, Pennsylvania, is awarded a $913,536,186 cost-plus-fixed-fee modification to previously-awarded contract N00024-19-C-2114 for Naval Nuclear Propulsion Components. Work will be performed in Monroeville, Pennsylvania (69%); and Schenectady, New York (31%). Fiscal 2020 shipbuilding and conversion (Navy) funding in the amount of $584,866,256 will be obligated at time of award and funding will not expire at the end of the current fiscal year. No completion date or additional information is provided on Naval Nuclear Propulsion Program contracts. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.

Bechtel Plant Machinery Inc., Monroeville, Pennsylvania, is awarded a $483,735,911 cost-plus-fixed-fee modification to previously-awarded contract N00024-16-C-2106 for Naval Nuclear Propulsion Components. Work will be performed in Monroeville, Pennsylvania (66%); and Schenectady, New York (34%). Fiscal 2020 shipbuilding and conversion (Navy) funding in the amount of $483,735,911 will be obligated at time of award and funding will not expire at the end of the current fiscal year. No completion date or additional information is provided on Naval Nuclear Propulsion Program contracts. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.

Raytheon Co., Integrated Defense Systems, San Diego, California, is awarded a $61,531,220 indefinite-quantity/indefinite-delivery contract for Global Positioning System-Based Positioning, Navigation and Timing Service (GPNTS) software support. GPNTS is used to receive, process and distribute three-dimensional position, velocity, acceleration, attitude, time and frequency in the formats required by shipboard user systems. The software support will include development, integration and test of improvements, correction of deficiencies, preparation and delivery of engineering interim/final software builds and inputs for the GPNTS software requirements and configuration baseline. The contract includes a base ordering period of five years, with a subsequent three-year option and a final two-year option for a total of 10 years should all options be exercised. The option periods, if exercised, would bring the cumulative value of this contract to $100,345,487. Fiscal 2019 research, development, test and evaluation funds in the amount of $3,407,044 will be placed on contract and obligated at the time of award. Contract funds will expire at the end of the current fiscal year. Work will be performed in San Diego, California, and is expected to be completed by November 2024. If all options are exercised, work could continue until November 2029. This contract was competitively procured with two offers received via the Commerce Business Daily's Federal Business Opportunities website and the NAVWAR e-Commerce Central website. The Naval Information Warfare Systems Command, San Diego, California, is the contracting activity (N00039-20-D-0021).

Bechtel Plant Machinery Inc., Monroeville, Pennsylvania, is awarded a $31,801,007 cost-plus-fixed-fee modification to previously-awarded contract N00024-19-C-2115 for Naval Nuclear Propulsion Components. Work will be performed in Monroeville, Pennsylvania. Fiscal 2019 shipbuilding and conversion (Navy) funding in the amount of $31,801,007 will be obligated at time of award and will not expire at the end of the current fiscal year. No completion date or additional information is provided on Naval Nuclear Propulsion Program contracts. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.

General Dynamics Electric Boat, Groton, Connecticut, is awarded a $24,103,730 cost-plus-fixed-fee modification to previously awarded contract N00024-18-C-2101 to exercise an option for engineering and technical design effort to support research and development concept formulation for current and future submarine platforms. Work will be performed in Groton, Connecticut, and is expected to be complete by October 2020. Fiscal 2020 research, development, test and evaluation (Navy) funding in the amount of $175,000 will be obligated at time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity.

Progeny Systems Corp.,* Manassas, Virginia, is awarded a $9,855,080 firm-fixed-price and cost-plus-fixed-fee contract for services and hardware systems in support of the Undersea Warfare Decision Support Systems (USW-DSS) Command and Control program. This contract includes options which, if exercised, would bring the cumulative value of this contract to $50,711,886. Work will be performed in Manassas, Virginia (79%); Norfolk, Virginia (11%); Keyport, Washington (8%); Charleroi, Pennsylvania (1%); and San Diego, California(1%), and is expected to be completed by November 2020. If all options are exercised, work will continue through November 2024. Fiscal 2019 other procurement (Navy); and fiscal 2019 research, development, test and evaluation funding in the amount of $3,752,402 will be obligated at time of award and funding in the amount of $807,804 will expire at the end of the current fiscal year. This contract was not competitively procured. In accordance with Section 1709 of the 2018 National Defense Authorization Act that modifies 15 U.S. Code 638(r)(4), this Small Business Innovative Research (SBIR) Phase III contract is being awarded to Progeny Systems Corp., the same firm that received the SBIR award. USW-DSS provides a common set of integrated cross-platform and command decision support tools to enable integrated USW operations. The contract award is a follow-on to contract N00024-14-C-5209 for production and modernization of USW-DSS systems developed under the prior SBIR Phase III Contract. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity (N00024-20-C-5213).

Pacific Federal Management Inc.,* Tumon, Guam, is awarded a $9,093,633 indefinite-delivery/indefinite-quantity contract for base operating support services at Naval Base Guam and Naval Support Activity Andersen. The maximum dollar value including the base period and four option years is $48,494,711. The work to be performed provides for all labor, supervision, management, tools, material, equipment, facilities, transportation and incidental engineering and other items necessary to accomplish all work in ground maintenance and tree trimming services for United States military facilities on Guam at various locations on Guam and Northern Marianas Islands. Work will be performed in the Naval Facilities Engineering Command (NAVFAC) Marianas area of operations, including but not limited to, Naval Base Guam (70%); and Naval Support Activity Andersen, Guam (30%), and is expected to be completed by November 2024. No funds will be obligated at time of award. Fiscal 2020 operation and maintenance (O&M), (Navy); and fiscal 2020 O&M, (family housing) contract funds in the amount of $6,707,564 for recurring work will be obligated on individual task orders issued during the base period. This contract was competitively procured via the Federal Business Opportunities website with two proposals received. NAVFAC Marianas, Guam, is the contracting activity (N40192-20-D-9000).

ARMY

Walsh Federal JV, Chicago, Illinois, was awarded a $77,308,000 firm-fixed-price contract to procure services for the design and construction of an 87,620 square foot Joint Regional Confinement Facility. Bids were solicited via the internet with seven received. Work will be performed in Tacoma, Washington, with an estimated completion date of Aug. 1, 2022. Fiscal 2017 and 2018 military construction, Army funds in the amount of $77,308,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Seattle, Washington, is the contracting activity (W912DW-20-C-0002).

Great Lakes Dredge & Dock Co., Oak Brook, Illinois, was awarded a $13,700,000 modification (P00018) to contract W912BU-15-C-0054 for dredging plants to remove the variety of material encountered in dredging. Work will be performed in Chester, Pennsylvania, with an estimated completion date of March 15, 2020. Fiscal 2020 operation and maintenance, Army funds in the amount of $13,700,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Philadelphia, Pennsylvania, is the contracting activity.

DEFENSE LOGISTICS AGENCY

Rolls-Royce Corp., Indianapolis, Indiana, has been awarded a maximum $67,076,432 requirements contract for supplies related to the upgrade of the T-56 engine from series 3.0 to series 3.5. This was a sole source acquisition using justification 10 U.S. Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a five-year base contract with one five-year option period. Location of performance is Indiana, with Sept. 30, 2024, performance completion date. Using military services are Air Force and Navy. Type of appropriation is fiscal 2020 through 2024 defense appropriated funds. The contracting activity is the Defense Logistics Agency Aviation, Richmond, Virginia (SPE4AX-20-D-9405).

Avon Engineered Fabrications, Picayune, Mississippi (SPE7MX-20-D-0015); and SMR Technologies Inc., Fenwick, West Virginia (SPE7MX-20-D-0016), are sharing a maximum $40,328,925 firm-fixed-price with economic-price-adjustment contract for landing craft air cushion skirting systems. This was a competitive acquisition with two responses received. These are three-year base contracts with two one-year option periods. Locations of performance are Mississippi and West Virginia, with a Nov. 14, 2022, performance completion date. Using military service is Navy. Type of appropriation is fiscal 2020 through 2023 defense working capital funds. The contracting activity is the Defense Logistics Agency Land and Maritime, Columbus, Ohio (SPE7MX-20-D-0015).

Peckham Vocational Industries,** Peckham, Michigan, has been awarded a maximum $8,673,0560 modification (P00008) exercising the second, one-year option of a one-year base contract (SPE1C1-18-D-N029) with two, one-year option periods for the GEN III, Layer II, Mid-Weight Drawer. This is a firm-fixed-price contract. Location of performance is Michigan, with a Nov. 21, 2020, performance completion date. Using military services are Army and Air Force. Type of appropriation is fiscal 2020 through 2021 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania.

*Small Business
**Mandatory source

https://www.defense.gov/Newsroom/Contracts/Contract/Article/2018396/source/GovDelivery/

On the same subject

  • COVID Disrupts Network Tests – But Army Presses On

    May 12, 2020 | International, Land, C4ISR

    COVID Disrupts Network Tests – But Army Presses On

    The Army pushed hard to field-test new tech with real soldiers. Then came the coronavirus. Now the service will have to rely much more on lab testing. By SYDNEY J. FREEDBERG JR.on May 11, 2020 at 5:11 PM WASHINGTON: The Army is taking a calculated risk to field much-needed network upgrades known as Capability Set 21 on time next year. To do that, the service needs to start buying radios, computers, satellite terminals, and much more in bulk this year so it can start fielding them to four combat infantry brigades in early 2021. Many Army weapons programs are staying on schedule because they're still doing digital design work and long-term R&D, much of which can be done online. But Capability Set 21 is so far along that much of its technology was already in field tests with real soldiers — testing that has been badly disrupted by precautions against the COVID-19 pandemic. As a result, said Maj. Gen. David Bassett, Program Executive Officer for Command, Control, & Communications – Tactical (PEO-C3T), the Army may have to rely on more testing data from the lab to make up for limited testing in the field. “As soon as we possibly can, we're going to get this back in the hands of soldiers,” Basset told the C4ISRNet online conference last week. “In the meantime, we know an awful lot from the lab-based risk reduction that we've done.” “The risk,” he said, “is pretty manageable.” Risk & Return The field tests done before the pandemic, combined with extensive lab tests, should be enough to prove the technology will work, Bassett said. In fact, the Army already largely decided what technologies to buy for the upgrade package known as Capability Set 21, he said. What it still wanted soldiers to figure out in field tests, he said, was how they would use it in the field. That feedback from those “soldier touchpoints” would help both fine-tune the tech itself and figure out exactly how much to buy of each item – say, single-channel radios versus multi-channel ones — for each unit. Going ahead without all the planned field-testing means the Army will have to make more fixes after the equipment is already fielded, a more laborious, time-consuming, and costly process than fixing it in prototype before going into mass production. It may also mean the Army initially buys more of some kit than its units actually need and less than needed of other items. But CS 21 is a rolling roll-out of new tech to four brigades a year, not a once-and-done big bang, Bassett explained. So if they buy too much X and too little Y for the first brigade or two, he said, they can adjust the amounts in the next buy and redistribute gear among the units as needed. It's important to make clear that the Army's new technologies have already gone through much more hands-on field testing from actual soldiers than any traditional program, and have improved as a result. In the most dramatic example — not from CS 21 itself but a closely related system — blunt feedback from soldiers and quick fixes by engineers led to major improvements in prototype IVAS augmented reality goggles, a militarized Microsoft HoloLens that can now show soldiers everything from live drone feeds to a cross-hairs for targeting their rifle. Doing such “soldier touchpoints” early and often throughout the development process is central to the 20-year-month Army Futures Command's attempt to fix the service's notoriously disfunctional acquisition system. But to stem the spread of the COVID-19 coronavirus, the Army – like businesses, schools, and churches around the world – has dramatically cut down on routine activities. “Units are either not training, or they're training with significant control measures put in place – social distancing, protective equipment, and things like that,” said Maj. Gen. Peter Gallagher, head of the Network Cross Functional Team at Army Futures Command. That's disrupted the “access to soldiers and the feedback loop that's been so critical to our efforts.” Nevertheless, the Army feels it has enough data to move ahead. It may also assess that the risk of moving ahead – even it requires some inefficient fixes later – is lower than the risk of leaving combat units with their existing network tech, which is less capable, less secure against hacking and less resilient against physical or electronic attack. 2021 And Beyond Capability Set 21 focuses on the Army's light infantry brigades, which don't have many vehicles to carry heavy-duty equipment, as well as rapidly deployable communications units called Expeditionary Signal Battalions. It includes a significant increase in the number of ground terminals for satellite communications, the generals said, though not quite as many as they'd hoped to be able to afford. It'll be followed by Capability Set 23, focused on medium and heavy mechanized units riding in 20-plus ton 8×8 Strykers and 40-plus-ton tracked vehicles. While units with lots of vehicles can carry much more gear, they also cover much larger distances in a day. That means CS 23 will include much more long-range communications through satellites in Low and Medium Earth Orbit, “which give us significantly more bandwidth at lower latency,” Gallagher said. “In some cases, it's almost having fiber optic cable through a space-based satellite link.” Even with CS 21 still in final testing, the Army's already gotten started on CS 23. It's reviewed over 140 white paper proposals submitted by interested companies in January, held “shark tank” pitch sessions with the most promising prospects in March, and is now negotiating with vendors. An Army slide summing up the systems being issued as part of the Integrated Tactical Network. Note the mix of Commercial Off The Shelf (COTS) and military-unique Program Of Record (POR) technologies. There has been some impact from COVID,” Gallagher said, “[but] we will have all the contracts probably let no later than July.” The chosen technologies will go into prototype testing next year, with a Preliminary Design Review of the whole Capability Set in April and a Critical Design Review in April 2022. Further Capability Set upgrades are planned for every two years indefinitely, each focusing on different key technologies and different parts of the Army. Meanwhile, Bassett's PEO shop is urgently pushing out more of its existing network tech to regular, Reserve, and National Guard troops deployed nationwide to help combat COVID-19, Bassett said. That includes everything from satellite communications links to military software on an Android phone, known as the Android Tactical Assault Kit (ATAK). Originally developed to help troops navigate and coordinate on battlefields, ATAK is now being upgraded to provide public health data like rapid updates on coronavirus cases. “Any soldier that was responding to this COVID crisis that needed network equipment, we wanted them to have a one-stop shop,” Bassett told the conference. “They would come to us and we'd go get it for them.” https://breakingdefense.com/2020/05/covid-disrupts-network-tests-but-army-presses-on

  • Boeing’s T-7 Red Hawk trainer enters production in the U.S. - Skies Mag

    February 26, 2021 | International, Aerospace

    Boeing’s T-7 Red Hawk trainer enters production in the U.S. - Skies Mag

    Static test airframe and first production aircraft set to enter joint flight-test campaign.

  • US Air Force turns to data analytics to solve B-1, C-5 maintenance challenges

    September 26, 2018 | International, Aerospace

    US Air Force turns to data analytics to solve B-1, C-5 maintenance challenges

    By: Valerie Insinna WASHINGTON — The U.S. Air Force is making changes to the way it sustains the B-1B Lancer bomber and C-5 Super Galaxy cargo plane, moving to a maintenance approach that will allow it to use data analytics to predict problems, the acting head of Air Force Materiel Command said. Both the B-1 and C-5 fleets transitioned to a conditions-based maintenance model last month, Lt. Gen. Robert McMurry, commander of the Air Force Life Cycle Management Center, told Defense News in a Sept. 18 interview. “Given the aging fleet situation that we have, we probably need to be using data better to take care of it — which is a drive toward what most everyone right now is saying is the right way to manage fleet sustainment, which is through condition-based maintenance and data analytics,” he said. “So we're trying to bring that on.” The approach — which involves using algorithms to predict the need for repairs rather than waiting for a part to break — is a standard practice in the commercial airline industry to help reduce maintenance-related delays or cancellations, but has been less common in the Air Force. AFMC determined it needed to make a greater push toward conditions-based maintenance as a result of servicewide reviews triggered by rising concerns about the number of aviation-related mishaps. The first review, directed by Air Force Chief of Staff Gen. Dave Goldfein, involved a one-day standdown that would give flying and maintenance units a chance to communicate potential safety concerns up the chain of command. Gen. Ellen Pawlikowski, then the head of AFMC, also directed the organizations under her command, like the Air Force Sustaiment Center, to evaluate its own data. The reviews have since concluded, with the Air Force finding “two systems ... where high risk was accepted,” said McMurry, noting that “operational security does not allow us to identify them.” “Our process is dealing with those responsibly,” he added. The B-1 and C-5 were chosen as pilot programs for the conditions-based maintenance approach because they are sustained by airmen and have older, relatively small inventories, making for a more manageable data set. But the planes have something else in common — a recent history of well-publicized mishaps. The C-5 has sustained a number of nose landing gear malfunctions that led to a standdown and maintenance assessment in 2017. But despite a fix being put in place, there have still been problems with the gear, such as a March 2018 event where one C-5 landed on its nose at Joint Base San Antonio-Lackland, Texas. Meanwhile, the B-1 fleet was temporarily grounded in June after a safety investigation board found problems with ejection seat components while investigating a May 1 emergency landingwhere the ejection seats did not deploy. Full article: https://www.defensenews.com/digital-show-dailies/air-force-association/2018/09/25/air-force-looks-to-data-analytics-to-help-solve-b-1-c-5-maintenance-challenges/

All news