Back to news

May 14, 2020 | International, Aerospace, Naval, Land, C4ISR, Security

Contract Awards by US Department of Defense - May 13, 2020

NAVY

The Boeing Co., St. Louis, Missouri, is awarded a $1,971,754,089 firm-fixed-price contract to provide non-recurring engineering associated with the Stand-off Land Attack Missile – Expanded Response (SLAM ER) obsolescence redesign effort as well as the production and delivery of 650 SLAM ER missiles in support of the government of Saudi Arabia. Work will be performed at St. Louis, Missouri (47%); Indianapolis, Indiana (37%); Pontiac, Michigan (9%); Melbourne, Florida (3%); Middletown, Connecticut (2%); and Black Mountain, North Carolina (2%). Work is expected to be complete by December 2028. Foreign Military Sales funds in the amount of $1,971,754,089 will be obligated at time of award, none of which will expire at the end of the current fiscal year. This contract was not competitively procured pursuant to Federal Acquisition Regulation 6.302-4. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity (N00019-20-C-0003).

The Boeing Co., St. Louis, Missouri, is awarded a $656,981,421 modification (P00014) to a previously awarded firm-fixed-price contract (N00019-19-C-0016). This modification procures and delivers 467 Harpoon full rate production Lot 91 Block II missiles and support equipment for various Foreign Military Sales customers. Work will be performed at St. Louis, Missouri (30%); McKinney, Texas (28%); Toledo, Ohio (6%); Grove, Oklahoma (5%); Pontiac, Michigan (4%); Putnam, Connecticut (2%); Galena, Kansas (2%); Burnley, United Kingdom (2%); Lititz, Pennsylvania (1%); Minneapolis, Minnesota (1%); and various locations within the continental U.S. (19%). This modification procures four Block II missiles and support equipment for the government of Brazil, eight Block II missiles and support equipment for the government of Thailand, 53 Block II missiles and support equipment for the government of Qatar, 402 Block II missiles and support equipment for the government of Saudi Arabia, and support equipment for the governments of Japan, the Netherlands, India and Korea. Work is expected to be complete by December 2026. Foreign Military Sales funds in the amount of $656,981,421 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.

Strategic Airborne Operations JV LLC,* Newport News, Virginia, is awarded a $146,834,175 firm-fixed-price, indefinite-delivery/indefinite-quantity contract. This contract acquires the High Endurance Electronic Warfare Jet (HEEWJ) capability. Work will be performed in Cherry Point, North Carolina (5%); and various locations within and outside the continental U.S. (95%) to be determined on individual orders. The HEEWJ capability is an offensive air support for training that provides regionally based, geographically distributed aviation with a variety of airborne threat simulation capabilities to train shipboard and aircraft weapon systems operators and aircrew to counter enemy electronic warfare and electronic attack operations in today's electronic combat environment in support of Department of the Navy, other Department of Defense (DOD) agencies, non-DOD government agencies and Foreign Military Sales customers. Work is expected to be completed in May 2024. No funds will be obligated at the time of award. Funds will be obligated on individual orders as they are issued. This contract was competitively procured via an electronic request for proposal, and two offers were received. The Naval Air Warfare Center Aircraft Division, Patuxent River, Maryland, is the contracting activity (N00421-20-D-0108).

Q.E.D. Systems Inc., Virginia Beach, Virginia, is awarded a $16,205,606 modification to previously awarded contract N00024-15-C-4400 for specification development and execution/procurement support services in support of Chief of Naval Operations availabilities, continuous maintenance availabilities (CMAVs), inactivation CMAVs, sustainment availabilities, phased modernization availabilities, re-commissioning availabilities, continuous maintenance and emergent maintenance window of opportunity for Navy surface combatant ship classes (CG 47/DDG 51). Work will be performed in Norfolk, Virginia (53%); San Diego, California (36%); and Everett, Washington (11%). Work is expected to be complete by October 2020. No funding will be obligated at time of award. The Naval Sea Systems Command, Washington, D.C., is the contracting activity.

BAE Systems, Information and Electronic Systems Integration Inc., Greenlawn, New York, is awarded a $14,465,881 modification (P00010) to previously awarded, firm-fixed-price, indefinite-delivery/indefinite-quantity contract N00019-17-D-0006. This modification adds the requirement to procure 46 AN/UPX-41(C) digital interrogators and 10 Mode 5 change kits for the Navy, Coast Guard, the government of Japan and various countries under the Foreign Military Sales program. Work will be performed in Greenlawn, New York (80%); Austin, Texas (10%); and Manassas, Virginia (10%), and is expected to be complete by May 2023. No funds are being obligated at time of award; funds will be obligated on individual orders as they are issued. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.

CACI Enterprise Solutions Inc., Chantilly, Virginia, is awarded a $13,904,377 cost-plus-fixed-fee task order modification in the four option years of the integrated business systems support services contract (N32205-19-F-1044 and P00008). Information technology services in this contract assist Military Sealift Command's business systems and ashore operations branch to manage, operate and maintain the command's business systems, as well as interfaces with the Navy Enterprise Defense Business Systems. Work under this modification will be performed in Norfolk, Virginia, and is expected to be complete by December 2023. This modification includes the remaining portion (eight months) of Option Year One as well as three 12-month options. If exercised, the cumulative value of this modification will be $13,598,409. The task order was competitively procured with proposals and four offers were received. The Naval Military Sealift Command, Norfolk, Virginia, is the contracting activity.

Sikorsky Aircraft Corp., a Lockheed Martin Co., Stratford, Connecticut, is awarded an $8,954,062 modification (P00091) to previously awarded firm-fixed-price contract N00019-14-C-0050. This modification provides support for the integration and transition of Windows 10 and Server 16 into various VH-92A training devices. Work will be performed in Quantico, Virginia, and is expected to be complete by October 2022. Fiscal 2020 research, development, test and evaluation (Navy) funds in the amount of $4,667,720 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity.

ARMY

Northrop Grumman, McLean, Virginia, was awarded a $176,471,668 modification (P00056) to contract W58RGZ-17-C-0014 to support Army special electronic mission aircraft fixed-wing life cycle services. Work will be performed in McLean, Virginia, with an estimated completion date of Aug. 31, 2020. Fiscal 2020 operations and maintenance (Army) funds in the amount of $176,471,668 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity.

DynCorp International LLC, Fort Worth, Texas, was awarded a $167,556,981 modification (P00057) to contract W58RGZ-17-C-0011 for support services for government-owned fixed-wing fleets performing transport aircraft missions. Work will be performed in Fort Worth, Texas, with an estimated completion date of May 31, 2021. Fiscal 2020 operations and maintenance (Army) funds in the amount of $167,556,981 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity.

Kiewit Infrastructure South Co., Sunrise, Florida, was awarded a $7,759,000 firm-fixed-price contract for Everglades restoration. Bids were solicited via the internet with three received. Work will be performed in Miami-Dade, Florida, with an estimated completion date of Nov. 16, 2021. Fiscal 2020 civil construction funds in the amount of $7,759,000 were obligated at the time of the award. U.S. Army Corps of Engineers, Jacksonville, Florida, is the contracting activity (W912EP-20-C-0004).

Michels Corp., Brownsville, Wisconsin, was awarded a $7,066,242 firm-fixed-price contract to repair levee systems in the Missouri River Basin. Bids were solicited via the internet with four received. Work will be performed in Pender, Nebraska, with an estimated completion date of Oct. 30, 2020. Fiscal 2020 other procurement (Army) funds in the amount of $7,066,242 were obligated at the time of the award. U.S. Army Corps of Engineers, Omaha, Nebraska, is the contracting activity (W9128F-20-C-0026).

Qualx Corp., Springfield, Virginia,* was awarded a $7,003,493 modification (P00010) to contract W91QF0-18-F-0047 for digitization of archival materials for the Army Heritage and Education Center. Work will be performed in Carlisle, Pennsylvania, with an estimated completion date of Sept. 25, 2021. Fiscal 2020 operations and maintenance (Army) funds in the amount of $7,003,493 were obligated at the time of the award. Mission and Installation Contracting Command, Carlisle Barracks, Pennsylvania, is the contracting activity.

DEFENSE LOGISTICS AGENCY

NuStar Terminal Partner TX L.P., San Antonio, Texas, has been awarded a maximum $22,392,616 firm-fixed-price contract for contractor-owned, contract-operated services to receive, store and issue U.S. government-owned jet propellant thermally stable. This was a competitive acquisition with one response received. This is a four-year base contract with one five-year option period with a possible six-month extension. Location of performance is Texas, with a June 30, 2024, performance completion date. Using military service is Air Force. Type of appropriation is fiscal 2020 through 2024 defense working capital funds. The contracting activity is the Defense Logistics Agency Energy, Fort Belvoir, Virginia (SPE603-20-C-5006).

AIR FORCE

CAE USA Inc., Tampa, Florida, has been awarded a $10,544,331 firm-fixed-price modification (P00158) to contract FA8223-10-C-0013 for support of the KC-135 Aircrew Training System. This modification provides for collective bargaining agreement wage adjustments resulting from Fair Labor Standards Act and Service Contract Act – Price Adjustment, and brings the total cumulative face value of the contract to $526,529,911. Work will be performed in Altus Air Force Base, Oklahoma; Grissom Air Reserve Base, Indiana; MacDill AFB, Florida; Pittsburgh, Pennsylvania; Rickenbacker Air National Guard Base, Ohio; Scott AFB, Illinois; Fairchild AFB, Washington; Milwaukee Air National Guard Base, Wisconsin; March AFB, California; and Joint Base Pearl Harbor-Hickam, Hawaii. Work is expected to be completed by Dec. 31, 2020. Fiscal 2020 operations and maintenance funds in the amount of $10,544,331 are being obligated at the time of award. Air Force Life Cycle Management Center, Wright-Patterson AFB, Ohio, is the contracting activity.

Honeywell International Inc., Phoenix, Arizona, has been award a $7,777,093 cost-plus-fixed-fee contract to research, develop, integrate, validate and demonstrate Consistent Logical Automated Reasoning for Integrated System Software Assurance (CLARISSA) for development and assessment of assurance cases. This contract provides for the research and development of technology to automate generation of assurance cases from curated evidence. Work will be performed in Phoenix, Arizona, and is expected to be completed by March 12, 2024. This award is the result of a competitive acquisition and two offers were received. Fiscal 2019 research, development, test and evaluation funds in the amount of $380,564 are being obligated at time of award. Air Force Research Laboratory, Rome, New York, is the contracting activity (FA8750-20-C-0512). (Awarded March 19, 2020)

*Small business

https://www.defense.gov/Newsroom/Contracts/Contract/Article/2185990/source/GovDelivery/

On the same subject

  • Canada rejoins NATO Airborne Warning and Control System program

    February 16, 2018 | International, Aerospace, C4ISR

    Canada rejoins NATO Airborne Warning and Control System program

    News Release From National Defence February 14, 2018, Brussels, Belgium — National Defence / Canadian Armed Forces The Government is committed to both the security and safety of Canadians and the protection of their rights and freedoms. Canada is playing a strong and constructive role in the world by making concrete contributions to international peace and security – including at the North Atlantic Treaty Organization (NATO). NATO is a cornerstone of Canada's international security policy and today the Government announced its intention to rejoin to the Alliance's Airborne Warning and Control System (AWACS) program. Programs such as AWACS, and the joint intelligence, surveillance, and reconnaissance it provides, are increasingly relevant in today's security environment. In response to the challenges posed by that environment, NATO has significantly increased the use of its AWACS operations, including in areas like Central and Eastern Europe where Canada is leading a multinational NATO battlegroup based in Latvia. Canada decided to withdraw from the AWACS program in 2011 following the Department of National Defence's 2010 Strategic Review. Quotes “NATO is a cornerstone of Canada's international security policy, and is one of our most important multilateral relationships. In that spirit, Canada has decided to rejoin NATO's Airborne Warning and Control System. AWACS is a key NATO capability that we will support by contributing to its operations and support budget. We have committed to keeping Canada engaged in the world, and continuing to commit ourselves to NATO and its missions are important steps toward that goal.” Harjit S. Sajjan, Defence Minister Quick Facts The Airborne Warning and Control System (AWACS) was established in 1978 and consists of a fleet of NATO-owned aircraft giving the Alliance abilities to conduct long-range aerial surveillance, and to command and control forces from the air. Part of Canada's commitment to NATO, as outlined in Strong, Secure, Engaged, includes: Leading and/or contributing forces to NATO and coalition efforts to deter and defeat potential adversaries, including terrorists, to support global stability; Leading and/or contributing to international peace operations and stabilization missions with the United Nations, NATO, and other multilateral partners. The NATO Airborne Warning and Control System has sixteen E-3A aircraft. These modified Boeing 707s are easily identifiable from the distinctive radar dome mounted on the fuselage. The E-3A usually operates at an altitude of around 10 km. From this altitude a single E-3A can constantly monitor the airspace within a radius of more than 400 km and can exchange information – via digital data links – with ground-based, sea-based and airborne commanders. By using pulse Doppler radar, an E-3A flying within NATO airspace can distinguish between targets and ground reflections and is therefore able to give early warning of low- or high-flying aircraft operating over the territory of a potential aggressor. Contacts Byrne Furlong Press Secretary Office of the Minister of National Defence Phone: 613-996-3100 Email: byrne.furlong@forces.gc.ca Media Relations Department of National Defence Phone: 613-996-2353 Email: mlo-blm@forces.gc.ca https://www.canada.ca/en/department-national-defence/news/2018/02/canada_rejoins_natoairbornewarningandcontrolsystemprogram.html

  • Pentagon seeks to cut F-35s, other equipment to pay for Trump’s border wall

    February 13, 2020 | International, Aerospace

    Pentagon seeks to cut F-35s, other equipment to pay for Trump’s border wall

    By: Aaron Mehta , Valerie Insinna , David B. Larter , and Joe Gould WASHINGTON — The Pentagon is seeking to divert $3.8 billion, largely from its fiscal 2020 weapons procurement budget, in order to fund President Donald Trump's border wall, according to a reprogramming request to congress obtained by Defense News. Among the victims of the cuts: a mass of aircraft purchases including F-35 joint strike fighters, C-130J cargo aircraft, MQ-9 Reaper drones and P-8 maritime surveillance planes, as well as ground vehicles and naval priorities. Overall, the plan would shift $2.202 billion in FY20 defense appropriations and $1.629 billion in FY20 Overseas Contingency Operations funding towards the wall, a key priority from president Donald Trump ahead of the November presidential elections. Air Force and Navy aviation spending takes the brunt of the cuts proposed by the Pentagon, with aircraft procurement going down by $558 million for Navy and Marine Corps and $861 million for the Air Force. Importantly, all of the funding decreases target items that were specifically added by Congress during the budgeting process, which could incur rancor from lawmakers. For the Navy, the Pentagon would cut two of the six F-35B short takeoff and landing aircraft added to the FY20 budget by Congress and two MV-22 Ospreys, stating that “current funding is more than sufficient to keep the production line open.” It also seeks to eliminate funding for one of the nine P-8A Poseidon surveillance aircraft funded in FY20, stating that the additional aircraft is “[in] excess to the 117 aircraft required.” In the Air Force's budget, the Pentagon slashed funding for the four of the eight C-130Js added by Congress for the reserve and Air National Guard. The department stated that funding for those planes can be rescheduled to fiscal year 2021, when the period of performance for the associated contract starts. The request would eliminate eight MQ-9 Reaper drones, culling most of the funding added by Congress for an increase of 12 MQ-9s. “The program is currently undergoing a strategic review,” the department stated in written justification, referring to an ongoing debate within the Air Force about how many Reapers to buy and retain over the next decade. “Procurement, if necessary, can be rescheduled to a later fiscal year.” Combatant commanders have consistently said they need more surveillance assets around the globe. It also strips $156 million for advanced procurement for the F-35A and removes $180 million for light attack aircraft for the Air Force, which the service has decided against procuring but has been widely supported by lawmakers as a low-cost alternative for the counter-terrorism fight. The Army would stand to lose $100 million in funding for national guard Humvee modernization and $194.5 million in Heavy Expanded Mobility Tactical Truck funding. However, with the Humvee set to be replaced by JLTV, the Army is unlikely to be heavily impacted by these funds being shifted around. The reprogramming request also cuts $650 million in advanced procurement funding for an America-class Amphibious Assault Ship, LHA-9, which is being built in Mississippi at Ingalls Shipbuilding. On its website, Huntington Ingalls Industries says the advanced funding provided by Congress, “enables a hot production line and a supplier base of 457 companies in 39 states to build this powerful warship.” The reprogramming also cuts funding one expeditionary fast transport ship, which is built in Alabama at Austal USA, which has been an area of interest for the powerful Republican Chairman of the Senate Appropriations Committee, Sen. Richard Shelby. The ship was deemed “excess to current programmatic need,” the reprogramming document says. “The procurement exceeds the program-of-record requirement,” the document reads. “This is a congressional special interest item.” In addition, the national guard and reserves would lose about $1.3 billion in what the reprograming request describes as unnecessary funding, given historic underexecution of prior year funds. A spokesman for the Pentagon declined to comment. Last year, the defense department had budgets, largely for military construction projects, diverted into funding a stretch of the wall project. Those projects cut included the rebuilding of several DoD schools both in the U.S. and abroad, special operations training centers in Europe and Hurricane Maria relief for Puerto Rico National Guard facilities. Overall, more than 100 projects had funding delayed. Asked on Tuesday about a potential reprograming of defense funds to pay for the wall, Secretary of Defense Mark Esper said “We did receive the request from DHS, that's all I'll say right now. We're working our way through the process, we're doing all those things we need to do. So when we're ready to make an announcement, we'll make an announcement.” Word that the Pentagon may once again be raided to pay for the wall came in mid-January, and at the time seemed to catch Republican supporters in Congress off-guard. “I wish they wouldn't take [wall funding] out of defense. I want to build the wall, I supported direct appropriations for it and fought for it — but we have to evaluate what this does to the military, what it affects, where and how,” said Senate Appropriations Committee Richard Shelby, R-Ala, at the time. But he added that nobody should be surprised the administration repeated the tactic, after it worked last year. https://www.defensenews.com/breaking-news/2020/02/13/pentagon-seeks-to-cut-f-35s-other-equipment-to-pay-for-trumps-border-wall

  • Aegis Combat System Intercepts Missile In Latest Successful Flight Test

    April 1, 2024 | International, Naval

    Aegis Combat System Intercepts Missile In Latest Successful Flight Test

    The USS Preble (DDG 88) successfully completed Flight Test Aegis Weapon System-32 (FTM-32), using the Aegis Combat System to successfully intercept a Medium Range Ballistic Missile (MRBM) target using SM-6...

All news