Back to news

November 9, 2020 | International, Aerospace

Competitors protest awards to SpaceX and L3Harris for hyperonic weapon tracking satellites

WASHINGTON - Raytheon and Airbus are protesting two recent awards for eight missile tracking satellites issued to SpaceX and L3Harris, putting into question the Space Development Agency's tight schedule to get its initial constellation on orbit in 2022.

The news was first reported by Aviation Week.

Under the Oct. 5 award in question, SpaceX and L3Harris were issued contracts to design and develop four satellites equipped with wide field of view (WFOV) overhead persistent infrared (OPIR) sensors. The eight satellites would form tranche 0 of SDA's tracking layer, which the military is building to track hypersonic weapons from space.

L3Harris received $193 million, while SpaceX received $149 million.

Airbus U.S. Space & Defense first filed its protest of the award Oct. 28, while Raytheon filed its own protest on Nov. 3. A stop work order has been issued for SpaceX and L3Harris.

“SDA is working with the GAO to achieve fast, accurate and equitable resolution to the protests received from Airbus and Raytheon on the agency's Tracking Tranche 0 contracts," an SDA spokesperson said in a statement. “SDA is committed to full and open competition whenever practicable and the agency understands protests are a potential and not uncommon part of that process.”

The tracking layer is one of several capabilities being built into the agency's planned mega-constellation known as the National Defense Space Architecture. SDA is using a spiral development approach to build out that constellation, by adding more satellites every two years. The first tranche, which would include the eight missile tracking satellites in question, will include about 30 satellites set to launch in 2022. By the end of 2026, the agency wants to have hundreds of satellites in orbit.

While Raytheon declined to comment, Airbus U.S. Space & Defense told C4ISRNET in a statement that concerns over the government's evaluation process for the proposals led the company to protest the award.

“While determined highly competitive, Airbus U.S. Space & Defense, Inc. was ultimately not selected by SDA for award. Our post-award debrief review identified concerns about the government's evaluation process, and as a result, we have filed a protest with the U.S. Government Accountability Office (GAO),” an Airbus U.S. spokesperson said in a statement. “Airbus U.S. believes its proposal based on the ARROW commodity satellite bus and the Airbus OneWeb Satellites' operational manufacturing facility in Florida fits SDA's evaluation criteria for commercial commoditized buses manufactured at scale.”

At the time of the awards, SDA Director Derek Tournear told C4ISRNET the awards were the result of a full and open competition, with the selection based purely on technical merit. Tournear praised both SpaceX and L3Harris in that interview, emphasizing both companies' plans to meet the agency's aggressive schedule.

“SpaceX had a very credible story along that line — a very compelling proposal. It was outstanding,” he said. “They are one of the ones that have been at the forefront of this commercialization and commodification route.”

In addition, “L3Harris had an extremely capable solution. They have a lot of experience flying affordable, rapid, small satellite buses for the department,” he said. “They had the plant and the line in place in order to produce these to hit our schedule.”

https://www.c4isrnet.com/battlefield-tech/space/2020/11/06/competitors-protest-awards-to-spacex-and-l3harris-for-hyperonic-weapon-tracking-satellites/

On the same subject

  • German Space Agency Selects Lockheed Martin ISpace System For Space Situational Awareness

    April 8, 2021 | International, Aerospace

    German Space Agency Selects Lockheed Martin ISpace System For Space Situational Awareness

    The German Space Agency at DLR is the national space agency for the Federal Republic of Germany and operates the German Space Situational Awareness Center together with the German Air Force.

  • Under Trump, decision on Air Force’s NGAD will shape fleet for decades

    December 23, 2024 | International, Aerospace

    Under Trump, decision on Air Force’s NGAD will shape fleet for decades

    The Air Force struggled for much of 2024 to figure out how — and even whether — to proceed with its planned sixth-generation fighter.

  • Honeywell and U.S. Army to demo next-generation T55 engine for Chinook helicopters

    June 10, 2020 | International, Aerospace

    Honeywell and U.S. Army to demo next-generation T55 engine for Chinook helicopters

    Honeywell has entered into an agreement with the U.S. Army to demonstrate and fly its upgraded T55 engine on the heavy-lift, twin-engine Chinook helicopter. The new 6,000-horespower engine is 25% more powerful and consumes 10% less fuel than the current T55. New modifications also make the next-generation T55 easier to maintain with lower operating costs and increased readiness for the warfighter. The new T55-GA-714C engine is specifically designed for next-generation military operators, and will improve the Chinook helicopter's ability to lift troops and heavy cargo for the U.S. Army and National Guard. Because the engine is based closely on the T55 version currently in use, almost no airframe changes are required — the same intake, exhaust and engine airframe mounts are used. This provides the Army and National Guard with a major engine improvement without the need to retrain their maintenance and operational staff. The design improvement will be demonstrated as part of the Cooperation Research and Development Agreement process with the U.S. Army. The engine upgrade can be incorporated either by modifying existing engines at overhaul in the U.S. fleet or with new production engines. "Honeywell has spent years designing and developing the T55-GA-714C engine as part of our commitment to push the T55's power beyond the needs of the Chinook helicopter," said Dave Marinick, president, Engines and Power Systems, Honeywell Aerospace. "For 60 years, we've powered the world's most premier heavy-lift helicopter, and this latest improvement increases performance while saving important program dollars and maintenance hours as well as increasing mission readiness. We are proud of our legacy on the Chinook helicopter, and we are committed to continuously improve the T55 engine." The installation and demonstration of the advanced T55 engine will take place on a CH-47F Chinook at Fort Eustis in Newport News, Virginia, under the supervision of the U.S. Army Combat Capabilities Development Command Aviation & Missile Center. The demonstration will show the ease of installation and prove out the engine's new compressor design that brings additional performance and reduces fuel burn. After that, Honeywell will complete the final qualification process for the new engine design. Honeywell first delivered the T55 engine to the U.S. Army in 1961 at 2,050 shaft horsepower on the CH-47A helicopter. Since that time, the engine's power has nearly tripled to 6,000 shaft horsepower. Each performance increase on the T55 is accompanied by reduced fuel burn, increased reliability and decreased maintenance hours. The T55 engine is the world leader in powering heavy lift helicopters. Over 900 CH-47 helicopters are operated today by various militaries around the world. Press release issued by Honeywell Aerospace on June 4, 2020 http://www.airframer.com/news_story.html?release=74824

All news