Back to news

January 8, 2019 | Local, Aerospace

Canada can afford new fighters or new frigates — but not both at once: report

Murray Brewster · CBC News

U of Calgary paper says Ottawa may have to abandon the idea of a multi-purpose military

The Trudeau government can't afford to buy ultra-modern warships and advanced warplanes at the same time, given the limits of federal finances, a new research paper argues.

The study, written for the University of Calgary's School of Public Policy, says that — contrary to the assurances offered in the government's defence policy — Ottawa will soon be forced into a series of tough, far-reaching choices about the structure and capabilities of the Canadian military.

Using the government's own figures, researcher Alex McColl concluded that the Liberals either will have to pour more money into their defence budget in the mid-2020s or scale back their ambitions by buying a less expensive fighter jet.

The reason, according to McColl, is that the bills for both new frigates and new fighters will come due at the same time.

Absent the political will (to spend more), the Canadian Forces can no longer afford to be a modern, multipurpose force ...- University of Calgary researcher Alex McColl

"Not only will the CF-18 replacement program have to fight for funding against the general austerity and easy riding nature of Canadians, but it will also be running concurrently with the largest military procurement in Canadian history: the National Shipbuilding Strategy," he wrote.

During the 2015 election campaign, Prime Minister Justin Trudeau pledged Canada would not buy the F-35 stealth jet — that it would go with something cheaper and pour the savings into rebuilding the navy.

The way the defence policy figures roll out, McColl wrote, suggests the government is on track to do just that.

"Absent the political will to provide considerably more than 1.15 per cent of GDP in defence spending," he wrote, "the Canadian Forces can no longer afford to be a modern multipurpose force and should instead move to a Navy centric force structure."

The Liberal defence policy, released just over 18 months ago, forecasts that by 2025, annual defence spending will rise to $32.7 billion, or about 1.4 per cent of GDP.

However, the projections in the defence policy do not go past the fiscal year 2024-25 — something the Parliamentary Budget Office flagged in a report in November 2017.

That PBO report also raised concerns about whether the Liberals would even meet their procurement targets and predicted the numbers would fall off a cliff before the 20-year defence spending policy reaches its halfway mark.

"Measured as a share of the economy, the new spending plan will raise the defence budget by over 17 per cent to about 1.1 percentage points of GDP by 2024," the PBO analysis said. "Following this, spending will decline by 38 per cent to 0.69 percentage points of GDP by 2035."

McColl said Canada may be left with no choice but to buy a cheaper fighter.

"The best value solution to the CF-18 replacement is the least expensive jet in the competition: the Saab Gripen," he wrote in his report.

In an interview CBC News, McColl said he chose the Gripen because it is "the dramatically least expensive option," although the Super Hornet is also a cheaper alternative.

"I wouldn't say we would be forced (to buy them)," he said. "What I would say is that buying an inexpensive fighter that meets the minimum requirements of what we use the CF-18 for today would be the optimal policy."

National Defence announced last week it had concluded a deal with Australia to buy 18 used F-18 fighters to bolster the current CF-18 fleet until a brand-new replacement is selected.

That competition to replace the CF-18s with new aircraft is slated to kick off this spring, when the federal government puts a tender on the street. A contract award is not expected until 2022.

The first new fighters won't arrive until 2025 — and it will be another year after that before they are operational.

Dave Perry, a procurement expert at the Canadian Global Affairs Institute, said that new accounting rules — which allow National Defence to spread the cost of weapons system over their lifetime, instead of accounting for them all at once — give the Liberal government a bit of flexibility.

But he also pointed out that, by trying to rebuild the navy and the air force at the same time, the Liberals are trying to do something rarely accomplished outside of a wartime setting.

"Between new fighters and surface combatants [frigates], those are by far the two biggest projects that have gotten underway in this country in a long time, and doing them at the same time is not something we've done in peacetime before," said Perry. "Previously, we've done these things in sequential order."

The question of whether the federal government is organizationally and fiscally prepared to start paying big defence bills is open to debate, he added.

Almost four years ago, Perry co-wrote a seminal report that noted the number of staff dedicated to defence procurement at National Defence had never recovered from the budget cuts of the mid-1990s — dropping to 4,300 positions from 9,000.

In the time since his report was released, Perry said, there's been progress at the Department of National Defence in hiring procurement specialists and getting systems in place, but he's not certain the rest of the federal government is prepared.

"I think the biggest shortcoming is whether the Government of Canada writ large has the capacity, across government, not just in defence, to manage files this size with that level of complexity," he said.

https://www.cbc.ca/news/politics/canada-can-afford-new-fighters-or-new-frigates-but-not-both-at-once-report-1.4969031

On the same subject

  • His Majesty’s Canadian Ship Harry DeWolf Deploys on Operation Nanook 2023

    August 10, 2023 | Local, Naval

    His Majesty’s Canadian Ship Harry DeWolf Deploys on Operation Nanook 2023

    Today, His Majesty’s Canadian Ship (HMCS) Harry DeWolf departed from its homeport of Halifax, N.S., for the 2023 iteration of the annual sovereignty Arctic deployment, Operation Nanook.

  • Registration is now open for Canada Army Run 2024

    February 24, 2024 | Local, Land

    Registration is now open for Canada Army Run 2024

    Looking to challenge yourself while making a difference for Canada’s Military community? Look no further than Canada Army Run 2024, presented by BMO.

  • Operational pause of CT-114 Tutor fleet lifted

    September 21, 2022 | Local, Aerospace

    Operational pause of CT-114 Tutor fleet lifted

    Major-General Iain Huddleston, Commander of 1 Canadian Air Division and the Royal Canadian Air Force's (RCAF) Operational Airworthiness Authority, has lifted the operational pause on the CT-114 Tutor fleet effective September 20. The operational pause was implemented following an accident involving a 431 (Air Demonstration) Squadron (known as the Snowbirds) CT-114 Tutor aircraft on August 2, 2022 in Fort St. John, B.C. The Operational Airworthiness Authority implemented the operational pause on August 8 after consulting with the RCAF's Directorate of Flight Safety (DFS) investigators and with experts from the Technical Airworthiness Authority within the Department of National Defence's Assistant Deputy Minister (Materiel). An operational pause means aircraft (either specific aircraft or a fleet) temporarily stop flying until an operational airworthiness risk assessment can be completed, and it is safe for flying operations to resume. In this case, the accident remains under investigation by DFS, but the investigation to date has yielded enough information for a thorough risk assessment to be conducted. The initial From the Investigator report from DFS has been released and confirmed that the engine failure was due to an improperly assembled oil filter. The investigation is now analyzing the human factors that may have contributed to this occurrence. The team will resume flying at their home base of 15 Wing Moose Jaw, Sask. this week. Next week, the Snowbirds' CT-114 aircraft currently in Penticton and Fort St John, B.C. will begin returning to 15 Wing. The type of precision flying in the Snowbirds' aerobatic performances requires a very high level of proficiency, which in turn necessitates a great amount of practice. Given that the team has not flown since the August 2 accident, there is not enough time left for them to conduct the number of practices necessary to return to form for their scheduled shows. Accordingly, the team's remaining scheduled performances for 2022 have been cancelled. https://www.canada.ca/en/department-national-defence/news/2022/09/operational-pause-of-ct-114-tutor-fleet-lifted.html

All news