Back to news

May 27, 2024 | International, Land

Babcock sets up engineering facility in Ukraine to support military vehicles - Army Technology

Babcock and UDI are establishing an engineering facility in Ukraine to repair and overhaul military vehicles.

https://www.army-technology.com/news/babcock-sets-up-engineering-facility-in-ukraine-to-support-military-vehicles/

On the same subject

  • Britain moves to boost Ukraine’s naval chops

    August 20, 2020 | International, Naval

    Britain moves to boost Ukraine’s naval chops

    By: Andrew Chuter LONDON — Britain is stepping up its military support in Ukraine with an announcement that the U.K. will lead a multinational maritime initiative to train the Ukrainian navy. During a visit to Ukraine on Aug. 17 British Defense Secretary Ben Wallace confirmed the Royal Navy is coordinating a training initiative which also involves Canada, Denmark and Sweden. The training initiative will be complemented by U.S. security assistance support, said the British Ministry of Defence in a statement. Other nations are expected to join the naval training effort, said the MoD. The British-led training will focus on areas such as navigation, operational planning, military diving, sea surveillance, firefighting and damage control. The Royal Navy also plans to deploy warships to the region later in the year, Wallace said. Last year the Royal Navy Type 45 destroyer HMS Duncan visited Ukraine as part of the NATO's Sea Breeze exercise. That followed a visit by the survey ship HMS Echo. The U.K. has been conducting maritime training with the Ukraine for a while. Last year the British announced they were enlarging the scope of a wider military training effort, known as Operation Orbital, by deploying training teams from the Royal Navy and Royal Marines to boost a Ukrainian Navy facing increasing threats from Russia in the Sea of Azov. The Ukrainians are trying to rebuild a maritime presence following Moscow's annexation of Crimea in 2014. Ukraine lost most of its navy, including 75 percent of personnel, 70 percent of ships and key infrastructure. It faces a rising number of threats from the Russians in the Sea of Azov and the Black Sea, and its armed forces continue to counter Moscow-backed separatists in the Donbass region of the country. Last year the Ukrainian navy unveiled a 15-year, three-stage strategy to rebuild naval capabilities starting with the aim of developing capabilities to establish control over territorial waters and beyond by 2025. Britain announced late last year it was extending Operation Orbital by three years to March 2023, and despite a COVID-19 enforced suspension, now lifted, the U.K. armed forces have trained over 18,000 Ukrainian military personnel. https://www.defensenews.com/global/europe/2020/08/19/britain-moves-to-boost-ukraines-naval-chops/

  • New Production Contracts for UH-60s, HH-60s, and P-8s

    March 13, 2020 | International, Aerospace

    New Production Contracts for UH-60s, HH-60s, and P-8s

    by David Donald Sikorsky Aircraft received a contract modification on March 10 worth $525.3 million for 40 UH-60M Black Hawks. The batch comprises 38 being procured for the U.S. Army as Lot 44 of the service's MY IX multi-year procurement program. The other two represent the exercising of an option for two Foreign Military Sales aircraft for an unidentified customer. Managed by the Army Contracting Command at Redstone Arsenal, Alabama, the work is due to be performed by the Lockheed Martin-owned company by the end of June 2022. The five-year MY IX program, the ninth such order covering H-60 helicopters for the Army, was awarded to Sikorsky in June 2017. Specifying 257 UH-60 medium-lift helicopters and HH-60M medevac versions, the initial deal was worth $3.8 billion, with options for up to 103 additional helicopters that would ultimately bring the value to $5.2 billion. At the end of February, the H-60 production line received another boost when the Department of Defense ordered 12 more HH-60W combat rescue helicopters for the U.S. Air Force. The Lot 2 batch is the second low-rate initial production tranche to be ordered, with a value of more than $500 million. The program of record covers 113 HH-60Ws to replace the aging HH-60G Pave Hawk. Initially known as the “Rescue Hawk,” the HH-60W has now received its official Air Force name of Jolly Green II. Secretary of the Air Force Barbara Barrett announced the name at the Air Force Association (AFA) Air Warfare Symposium held in Orlando in late February. At the time of the order, Sikorsky had flown seven HH-60Ws, of which two are with the Air Force trials unit at Duke Field, Eglin AFB, Florida. The initial goal is to meet Required Assets Available (RAA) criteria by the end of 2020. In another DOD deal, announced on March 6, Boeing was awarded an $800 million contract by Naval Air Systems Command to procure long-lead materials associated with Lot 11 production of P-8A Poseidon maritime patrol aircraft. This batch comprises 18 aircraft, of which eight are for the U.S. Navy. The remainder comprises six aircraft for the Republic of Korea Navy (ROKN) and four for the Royal New Zealand Air Force (RNZAF). South Korea decided in June 2018 to order six Poseidons as a replacement for the Lockheed P-3CK Orions that serve with the ROKN's 615 Squadron at Jeju air base, while New Zealand announced its intention to buy the P-8 in the following month. In RNZAF service the P-8 is expected to serve with No. 5 Squadron at Whenuapai, which currently flies P-3K Orions. Both nations placed their orders for P-8As in March 2019. https://www.ainonline.com/aviation-news/defense/2020-03-12/new-production-contracts-uh-60s-hh-60s-and-p-8s

  • Congress wants five-year budget plan for European defense fund

    December 11, 2019 | International, Aerospace, Naval, Land, C4ISR, Security

    Congress wants five-year budget plan for European defense fund

    By: Jen Judson WASHINGTON — Congress wants the Pentagon to produce a five-year plan for the European Deterrence Initiative fund, much like what is required each year when the Defense Department rolls out its base budget request. In the fiscal 2020 defense policy bill's conference report released Dec. 9, Congress gives the Pentagon a tight deadline to produce a future years plan for the EDI account for FY20 — no later than the end of the year — that covers “not fewer than the four succeeding fiscal years.” Congress wants the defense secretary and the head of U.S. European Command to submit to congressional defense committees subsequent future five-year plans beginning in FY21 at the same time as budget requests are submitted. The EDI account — initially called the European Reassurance Initiative — was created to help Eastern European allies deter Russia from further incursion into Europe following its annexation of Crimea from Ukraine and continued military activity in the region. The U.S. Army's presence at the time of the annexation had dwindled from roughly 200,000 troops in Europe in the 1980s to around 33,000 in 2015. The Army had only two permanently stationed brigade combat teams, had closed more than 100 sites since 2006, and was concentrated in Italy and Germany rather than along NATO's eastern flank. The plans should contain a description of the “intended force structure and posture” of the assigned forces in Europe for the last fiscal year as well as “the manner in which such force structure and posture support the implementation of the National Defense Strategy,” according to the bill's report. The plan should also detail infrastructure and military construction investments and the assessment of resources including cost estimates for each project needed to achieve requirements such as increased presence, exercises, training, enhanced pre-positioning of stocks and building partnership capacity, the bill noted. The Pentagon should also include a timeline to achieve force posture and capabilities to include permanent posture requirements as well as a detailed account of what has changed from the previous year, according to the bill. Additionally, the Defense Department is required to submit a report no later than the end of November 2020 and each year after summarizing in detail funds obligated for EDI for the past fiscal year, as well as a comparison of funds requested for the following fiscal year. Under the bill, the Pentagon must also provide an interim briefing no later than the end of March 2021 and each year after covering the status of all matters to be included in the future years plans and reports on EDI. Funding for EDI has continued to grow since its inception almost five years ago. In FY19, the Pentagon requested $6.5 billion, up from $4.8 billion in FY18 and $3.4 billion in FY17. Only in FY20 did the funding come down, when the Pentagon cut the account by 10 percent. The Pentagon said the cut accounted for some one-time expenses such as military construction and a look toward increased burden-sharing from allies. https://www.defensenews.com/congress/2019/12/10/congress-wants-five-year-budget-plan-for-european-defense-fund/

All news