Back to news

April 15, 2024 | Local, Land

ANALYSIS | Shooting blanks: Why so many Canadian defence policies fail to launch | CBC News

With absolutely no exceptions, every defence policy presented by the Canadian government over the past five decades has presented a vision of the world beyond our borders going to hell in a handbasket. The wars may be different, the adversaries might change, threats might have evolved — but the language almost always stays the same.

https://www.cbc.ca/news/politics/defence-policy-canadian-forces-trudeau-nato-1.7172835

On the same subject

  • Le Super Hornet block 3 hors course au Canada ? - Aerobuzz

    November 29, 2021 | Local, Aerospace

    Le Super Hornet block 3 hors course au Canada ? - Aerobuzz

    Actualité et information aéronautique

  • Canadian military begins investigation into allegation officer threatened to execute sailors on supply ship

    November 6, 2023 | Local, Naval

    Canadian military begins investigation into allegation officer threatened to execute sailors on supply ship

    Officer on Royal Canadian Navy supply ship allegedly threatened to execute fellow sailors because he was unhappy with their performance.

  • PAL Aerospace seeks talent for SAR operating bases

    August 21, 2018 | Local, Aerospace

    PAL Aerospace seeks talent for SAR operating bases

    Chris Thatcher PAL Aerospace is on the hunt for maintenance, materiel, information technology and other support talent to staff the Royal Canadian Air Force's (RCAF's) four search and rescue main operating bases. Twenty months after the federal government selected 16 Airbus CC-295W fixed-wing search and rescue aircraft to replace six CC-115 Buffalos and 12 CC-130 H-model Hercules, St. John's, N.L.-based PAL is ready to hire the team that will deliver in-service support (ISS) for the new fleet. “PAL Aerospace will be providing a wide assortment of program management services as we prepare to undertake the maintenance and logistics support, heavy maintenance, including a mobile repair team, and centralize supply chain management activities for this aircraft,” Eva Martinez, vice-president of ISS, told the Abbotsford Aerospace, Defence and Security Expo (ADSE) in August. As a supplier to Airbus, PAL is responsible for maintenance and material support of the new fleet, providing an integrated team of aircraft maintenance engineers (AMEs), warehouse and tool crib personnel, a technical library and a contractor field office at four main operating bases in Comox, B.C., Winnipeg, Man., Trenton, Ont., and Greenwood, N.S. Each base will require around 11 people. PAL will also establish and maintain a maintenance, repair and overhaul (MRO) facility in Winnipeg for heavy maintenance work. The shop will be co-located with its central warehouse, and will be home base for the mobile repair team. In total, PAL expects to hire around 28 people to staff the facility. As for material, PAL will provide ground support equipment, a 30-day supply of aircraft consumables at each base, personal protective equipment, and shipping and handling of all aircraft spare parts, said Martinez, an aerospace engineer who served 13 years in the Air Force. Through a joint venture with Airbus called AirPro, PAL will collaborate on the integration of all ISS services. “Our hiring target as it stands right now is 73,” she said. “As we work with Canada and Airbus to fully define the maintenance tasks, we could see an increase in the level of effort required...for AMEs.” That workload is based in part on RCAF plans to locate three CC-295W at each base. Two more will reside with the operational training unit in Comox while a final two will serve as floaters. “They will be moved around depending on the induction into heavy maintenance as well as the operational tempo,” said Martinez. Comox, which will include the RCAF's new search and rescue training centre, will stand up in 2019 to coincide with the arrival of the first aircraft, expected by the end of next year. The front, mid and rear fuselage sections have been delivered to Airbus's pre-final assembly line in Tablada, Spain, and the final aircraft is expected to roll out in the first quarter of 2019. Full article: https://www.skiesmag.com/news/pal-aerospace-seeks-iss-talent-for-rcaf-sar-operating-bases/

All news