Back to news

November 10, 2021 | International, Aerospace

Air Force-Backed Startup Reveals Hypersonic Aircraft Prototype

The company fired the drone’s afterburning engine during a ceremony in Atlanta.

https://www.defenseone.com/technology/2021/11/air-force-backed-startup-reveals-hypersonic-aircraft-prototype/186729/

On the same subject

  • Heavy robotic combat vehicles put to test in the Colorado mountains

    August 10, 2020 | International, Land

    Heavy robotic combat vehicles put to test in the Colorado mountains

    By: Jen Judson WASHINGTON — The U.S. Army grappled with the challenge of incorporating heavy robotic combat vehicles into its formations during a monthlong experiment at Fort Carson, Colorado, coming away with a clearer path to bringing robots into the fold. Still, the service is years away from ground robots seamlessly fitting in with units. The Army has been evaluating the performance and possible utility of heavy RCVs for more than a year through the use of robotic versions of M113 armored personnel carriers, but the experiment at Camp Red Devil on Fort Carson is the most complex to date. “We're taking a lot of technology, we're experimenting and this experiment was 100 percent successful,” Brig. Gen. Ross Coffman, who is in charge of the Army's combat vehicle modernization efforts, told reporters in an Aug. 6 briefing. “The whole purpose was to learn where the technology is now and how we think we want to fight with it in the future.” Coffman said that doesn't mean all of the technology was successful or that everything performed perfectly. “Some [technology] knocked our socks off, and some we've got a little bit of work to do. But that is why we do these things, so we can do it at small scales, so we can learn, save money and then make decisions of how we want to fight in the future.” Going the distance In part, the Army is tackling a physics problem as well as a technology challenge involving the distance between the robot and the controller, Coffman said. But the service has found companies that can create waveforms to get the required megabytes per second to extend the range in the most challenging environments like dense forested areas, he added. During the experimentation, Coffman said, the Army tested the waveforms. “We went after them with [electronic warfare], we saw they were self-correcting, so that if they're on one band, they can switch to another,” he said, “so we have a really good idea of what is in the realm of the possible today.” The service was also able to almost double the range between controller and robot using the waveforms available, he explained. “If you could extend the battlefield up to 2 kilometers with a robot, then that means that you can make decisions before your enemy came, and it gives you that trade space of decisions faster and more effectively against the enemy.” The Army was also very pleased with the interface for the crew. The soldiers were able to located themselves and the robots, communicate among themselves, and see the graphics that “just absolutely blows us away,” Coffman said. The software between the robot and control vehicle — a Bradley Infantry Fighting Vehicle — “while not perfect, performed better than we thought it would,” Coffman said. The software also allowed the robot move in front of the control vehicle by roughly 80-1,000 meters as well as identify hotspots and enemy locations. “I didn't know how that was going to work,” Coffman said. “There were some challenges that we had, like getting exact granularity at distance, but the ability that we could identify hotspots and enemy positions I thought was absolutely exceptional.” As a side experiment, the Army also tested a robotic version of the Stryker Dragoon infantry combat vehicle, which is equipped with a 30mm cannon and uses the same software and hardware in control vehicles, Coffman noted. The experiment included live fire. In the heavy RCV surrogates, the target recognition worked while stationary, but part of the challenge the Army is tackling is how to do that on the move while passing information to a gunner, he added. Work on stabilizing the system for multiple terrains also needs performed, but that was indicative of using clunky, old M113s and turning them into robots rather than having a purpose-built vehicle like the RCV Medium and RCV Light. The Army awarded contracts to a Textron and Howe & Howe team to build the RCV-M, and a QinetiQ North America and Pratt & Miller team to build the light version late last year and early this year. Those are being built now. Training on the system also proved to be much easier than anticipated. Coffman said he asked how long the operators need to train, and was surprised to hear they need roughly 30 minutes to learn. “I thought it was going to take them days, but our soldiers are so amazing and they grew up in this environment of gaming.” What's the Army's next step? Now that the first major experiment is done, the Army plans to build up to a company-level operation in the first quarter of fiscal 2022 at Fort Hood, Texas. The experiment will also include four medium RCV prototypes and four light RCVs. While the experimentation at Fort Carson was focused on cavalry operations where the robots served more in a scout mission and proved they could be effective in a reconnaissance and security role, the experiment in FY22 will move the robots into more of an “attack and defend” role, according to Coffman. A new radio will be added to increase range as well as a tethered UAV and more leap-ahead target recognition capability that uses algorithms trained on synthetic data that is “truly cutting-edge,” Coffman said. After each of these experiments, he added, the Army reaches a decision point where it decides how to proceed, whether that is more experimentation or a fielding decision. “We have enough information tactically and technically that I believe we can move forward to the second experiment,” he noted. Following the second experiment, the Army will reach a decision point in FY23 on whether to move the effort into an official program of record. Once that is decided, an acquisition strategy would be identified if the decision is to move forward, according to Coffman. https://www.defensenews.com/land/2020/08/07/heavy-robotic-combat-vehicles-put-to-test-in-the-colorado-mountains/

  • Contract Awards by US Department of Defense - January 2, 2019

    January 3, 2019 | International, Aerospace, Naval, Land, C4ISR, Security

    Contract Awards by US Department of Defense - January 2, 2019

    NAVY Risk Mitigation Consulting Inc.,* Destin, Florida, is awarded a maximum amount $95,000,000 indefinite-delivery/indefinite-quantity contract for mission assurance assessments of installation/facilities infrastructure and facility-related control systems for the Department of the Navy . The work includes, but is not limited to the collection and evaluation of data concerning the criticality of facilities, utilities, industrial control systems, and supporting infrastructure based on mission impacts, probable threats and hazards, and degrees of vulnerability to determine the overall risk posture of the asset. Work will be performed at various Navy and Marine Corps installations at various locations within the Naval Facilities Engineering Command, Atlantic area of responsibility, both inside and outside the continentalU.S., including, but not limited to, California (24.6 percent); Virginia (13.0 percent); Florida (10.1 percent); Maryland (7.2 percent); Washington (5.8 percent); Hawaii (4.3 percent); Texas (4.3 percent); South Carolina (4.3 percent); Washington, District of Columbia (2.9 percent); North Carolina (2.9 percent); Mississippi (2.9 percent); Georgia (2.9 percent); Tennessee (1.5 percent); Rhode Island (1.5 percent); Pennsylvania (1.5 percent); New York (1.5 percent); New Jersey (1.5 percent); Louisiana (1.5 percent); Indiana (1.5 percent); Illinois (1.5 percent); Connecticut (1.4 percent); and Arizona (1.4 percent). The term of the contract is not to exceed 60 months with an expected completion date of January 1, 2024. Fiscal 2019 operations and maintenance (Navy) funds in the amount of $10,000 are obligated on this award, and will expire at the end of the current fiscal year. Future task orders will be primarily funded by operations and maintenance (Navy and Marine Corps). This contract was competitively procured via the Navy Electronic Commerce Online website and Federal Business Opportunities website, with six proposals received. The Naval Facilities Engineering Command, Atlantic, Norfolk, Virginia, is the contracting activity (N62470-19-D-2002). Raytheon Co., El Segundo, California, was awarded $81,224,627 for modification P00007 to a previously awarded fixed-price-incentive=-firm-target contract (N00019-17-C-0042). This modification provides for the procurement of 228 configuration components required for completion of Configuration D Retrofit Component engineering change proposals for the F/A-18E/F and EA-18G aircraft for the Navy and the government of Australia. Work will be performed in Forest, Mississippi (53 percent); Andover, Massachusetts (36 percent); and El Segundo, California (11 percent), and is expected to be completed in February 2022. Fiscal 2019 aircraft procurement (Navy); and Foreign Military Sales (FMS) funds in the amount of $81,224,627 will be obligated at time of award. No funds will expire at the end of the current fiscal year. This modification combines purchases for the Navy ($80,692,484; 99 percent) and the government of Australia ($532,143; 1 percent) under the FMS program. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. Lockheed Martin, Rotary and Mission Systems, Moorestown, New Jersey, is awarded a $28,882,337 cost-plus-incentive-fee modification to previously awarded contract N00024-16-C-5102 for AEGIS Baseline 9 Integration and Delivery, TI-08 CG Upgrade, AEGIS Baseline 9 Capability Development, Capability Improvements, Baseline 9 Sea Based Non-Cooperative Target Recognition Development and Radar Engineering. Work will be performed in Moorestown, New Jersey, and is expected to be complete by July 2019. Fiscal 2019 research, development, test and evaluation (Navy); fiscal 2013 shipbuilding and conversion (Navy); fiscal 2019 other procurement (Navy); 2019 operations and maintenance (Navy); and 2019 weapons procurement (Navy), funding in the amount of $28,882,337 will be obligated at time of award and funds in the amount of $1,530,764 will expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity. Bell-Boeing JPO, Amarillo, Texas, is being awarded $23,325,145 for cost-plus- fixed-fee delivery order N0001918F5004 against a previously issued basic ordering agreement (N00019-17-G-0002) in support of the V-22. This order provides support of ongoing flight test and evaluation of the V-22 test aircraft. Work will be performed at Naval Air Station Patuxent River, Maryland (90 percent); and Marine Corps Air Station Yuma, Arizona (10 percent), and is expected to be completed in December 2018. Fiscal 2018 aircraft procurement (Navy); and fiscal 2018 research, development, test and evaluation (Navy) funds in the amount of $23,325,145 will be obligated at time of award; none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. SRA International Inc., Chantilly, Virginia, was awarded an $11,336,940 firm-fixed-price contract for command, control, communications, and computer system afloat operations and sustainment support for capabilities aboard the Military Sealift Command (MSC) fleet of ships, and the MSC network operations centers. This contract includes a six-month period of performance. Work will be performed in Norfolk, Virginia, and work is scheduled to commence Jan. 1, 2019, and is scheduled to be completed June 30, 2019. This contract will be funded with Navy working capital funds; and U.S. Transportation Command working capital funds. Funds will expire at the end of the current fiscal year. This contract was awarded as an other than full and open requirement under unusual and compelling urgency procedures. Only one offer was solicited and received. The Navy's Military Sealift Command, Norfolk, Virginia, is the contracting activity. (N3220519C1000) (Awarded Dec. 31, 2018) Structural Associates Inc., * East Syracuse, New York, is awarded $10,008,000 for firm-fixed-price task order N4008519F4299 under a previously awarded multiple award construction contract (N40085-17-D-5048) for repairs for insulator shop relocation Building 166 at Portsmouth Naval Shipyard. The work to be performed provides building repairs and modernization to the historic 1941 Building 166. Exterior envelope repairs and replacement will include, but are not be limited to, roofing and wall systems, trim, windows and window systems, skylights, door repairs, concrete, the installation of roof and wall insulation, and reconfiguration of the building entrance to provide accessibility. Interior repair and renovation includes, but is not limited to, reconfiguration of existing toilet facilities, the renovation of electrical and plumbing systems, the replacement of deteriorated heating ventilation and air conditioning equipment and controls, and the modernization of fire protection systems. Work will include egress paths in order to improve space utilization, accessibility and life safety. The task order also contains five unexercised options, which, if exercised, would increase cumulative task order value to $10,691,110. Work will be performed in Kittery, Maine, and is expected to be completed by March 2020. Fiscal 2019 operations and maintenance (Navy) contract funds in the amount of $10,008,000 are obligated on this award and will expire at the end of the current fiscal year. Four proposals were received for this task order. The Naval Facilities Engineering Command, Mid-Atlantic, Norfolk, Virginia, is the contracting activity. Correction: Contract awarded on Dec. 27, 2018 to Bell Boeing JPO, Amarillo, Texas, was announced with the incorrect award amount and contracting activity. The contract should have stated the award amount of $ $24,448,390 and that the contracting activity is the Naval Air Warfare Center Aircraft Division, Lakehurst, New Jersey. All other contract information is correct. ARMY O'gara-Hess & Eisenhardt Armoring Co. LLC,* Fairfield, Ohio, was awarded a $60,736,752 firm-fixed-price contract to procure Family of Medium Tactical Vehicles protection kits. Bids were solicited via the internet with six received. Work locations and funding will be determined with each order, with an estimated completion date of Dec. 31, 2023. U.S. Army Contracting Command, Warren, Michigan, is the contracting activity (W56HZV-19-D-0041). Endeavor Robotics Inc., Chelmsford, Massachusetts, was awarded a $32,400,000 firm-fixed-price contract for reset, sustainment, maintenance, and recap parts for Robot Logistics Support Center technicians to support the overall sustainment actions of the entire Endeavor family of small, medium, and large robots. Bids were solicited via the internet with one received. Work locations and funding will be determined with each order, with an estimated completion date of Jan. 2, 2024. U.S. Army Contracting Command, Warren, Michigan, is the contracting activity (W56HZV-19-D-0031). CORRECTION: An $89,520,585 modification (0053 09) to contract W52P1J-11-G-0053 awarded to BAE Systems Ordnance Systems Inc., Radford, Virginia, announced Dec. 31, 2018, listed the wrong amount of funds obligated. The correct amount of obligated funds is $7,895,422. All other information in the announcement was correct. AIR FORCE BAE Systems Information and Electronics Systems Integration, Nashua, New Hampshire (FA8604-19-D-4021); The Boeing Co., Defense, Space & Security, St. Louis, Missouri (FA8604-19-D-4022); General Atomics Aeronautical Systems Inc.(GS-ASI), Poway, California (FA8604-19-D-4020); Goodrich Corp., UTC Aerospace Systems, ISR Systems, Westford, Massachusetts (FA8604-19-D-4023); Harris Corp., Electronic Systems, Integrated Electronic Warfare Systems, Clifton, New Jersey (FA8604-19-D-4027); Lockheed Martin Corp., Lockheed Martin Aeronautics Co., Fort Worth, Texas (FA8604-19-D-4026); Northrop Grumman Systems Corp., Northrop Grumman Aerospace Systems, Melbourne, Florida (FA8604-19-D-4024); and Raytheon Co., Raytheon, El Segundo, California (FA8604-19-D-40250), have been awarded $22,500,000 ceiling indefinite-delivery/indefinite-quantity contracts for the formation of a collaborative working group of various industry partners to work as single extended entity to develop, evolve, update via pre-planned product improvement initiatives, as well as manage and provide configuration control of the open mission systems and universal command and control interface standards, collectively referred to as the Open Architecture Standards. These contracts provide for the development, updating and management of the above standards with the following business goals, promote adaptability, flexibility, and expandability; support a variety of missions and domains; simplify integration; reduce technical risk and overall cost of ownership of weapon system programs; enable affordable technology refresh and capability evolution; enable reuse; enable independent development and deployment of system elements; and accommodate a range of cybersecurity approaches. Work will be performed at the industry partner facilities in Nashua, New Hampshire; St. Louis, Poway, California; Westford Massachusetts; Clifton New Hampshire; Fort Worth, Texas; and Melbourne, Florida, and is expected to be complete by December 31, 2022. This award is the result of a sole-source acquisition. Air Force Life Cycle Management, Wright Patterson Air Force Base, Ohio, is the contracting activity. *Small business https://dod.defense.gov/News/Contracts/Contract-View/Article/1723366/

  • Key House Democrats want to lock in New START weapons limits

    July 16, 2020 | International, Land

    Key House Democrats want to lock in New START weapons limits

    By: Joe Gould WASHINGTON ― The chairmen of the House foreign affairs and intelligence committees are pushing a measure meant to extend the last remaining U.S.-Russia arms control agreement amid fears President Donald Trump will let it lapse. Led by House Foreign Affairs Committee Chairman Eliot Engel, D-N.Y., the proposal would require congressional approval to increase the nuclear arsenal above the limits of the 2010 New START treaty, if the pact is allowed to expire next year. The measure was offered as an amendment to the 2021 National Defense Authorization Act, which is set for floor consideration next week. Engel's amendment was cosponsored by House Intelligence Committee Chairman Adam Schiff, D-Calif., and House Intelligence, Emerging Threats and Capabilities Subcommittee Chairman Jim Langevin, D-R.I. “This Administration's recklessness has left New START as the only remaining agreement limiting Russia's nuclear weapons. Despite the White House's claims, there's no ‘better deal' with Russia and China on the horizon, and the clock on New START is ticking,” Engel said in a statement. “The president doesn't seem to have a problem with Russia developing more and more nuclear weapons that could strike the United States, so Congress has to do everything we can to keep these protections in place.” The action came days after Russian Foreign Minister Sergey Lavrov warned he's not very optimistic about prospects for an extension because of Washington's focus on making China sign onto the pact. U.S. and Russian envoys held talks last month in Vienna, but Beijing has refused to take part. Engel's amendment states that the U.S. should extend the pact for five years, to an expiration date of February 5, 2026, unless Russia is in material breach of the treaty or if it is replaced by a new, stronger agreement. It also provides the executive branch with permission to continue inspection activities and other transparency measures if New START expires on February 5, 2021, assuming that the government of Russia reciprocates these steps The New START treaty limits each country to no more than 1,550 deployed nuclear warheads and 700 deployed missiles and bombers and envisages sweeping on-site inspections to verify compliance. The amendment would bar funding to increase the arsenal above the treaty limits unless the president notifies Congress in advance of the new military requirements, certifies that the additional deployments are necessary and justifies the deployments, reports the associated costs and operational implications, and requires that any increase in deployed nuclear weapons is subject to a joint resolution of approval. It also requires detailed reports on Russian nuclear forces and, with and eye toward potential growth in China's nuclear arsenal, requires briefings and reports regarding the administration's arms control approach with Beijing, according to a summary. It also requires a presidential certification before New START would lapse that this would serve U.S. national security interests, an assessment whether continuing limits on Russian nuclear forces would serve U.S. interests and a plan for how the U.S. military and intelligence communities will address the post-New START environment, including the potential funding and development of additional nuclear deterrence and intelligence requirements. If Engel's amendment is accepted by the House Rules Committee and adopted by the House, it would almost certainly invite resistance from hawkish supporters of the president during negotiations to reconcile the House and Senate versions of the NDAA. Senate Armed Services Committee's Chairman Jim Inhofe, a proponent of nuclear weapons spending, has historically been a skeptic of the treaty. Kingston Reif, the Arms Control Association's director for disarmament and threat reduction policy, said the Trump administration doesn't seem like it will extend New Start and that Congress ought to be putting in roadblocks. “Crucially, the amendment would require congressional approval to increase the nuclear arsenal above the treaty limits, if the treaty is allowed to expire next year. A decision as consequential as increasing the size of the deployed arsenal, which hasn't occurred in decades, merits special scrutiny,” Reif said. After both Moscow and Washington withdrew from the 1987 Intermediate-range Nuclear Forces Treaty last year, New START is the only remaining nuclear arms control deal between the two countries. Russia has offered its extension without any conditions, while the Trump administration has pushed for a new arms control agreement that would also include China. Moscow has described that idea as unfeasible, pointing at Beijing's refusal to negotiate any deal that would reduce its much smaller nuclear arsenal. Trump declared an intention to pull out of the agreement in May, citing Russian violations. Russia denied breaching the pact, which came into force in 2002, and the European Union has urged the U.S. to reconsider. https://www.defensenews.com/congress/2020/07/15/key-house-democrats-want-to-lock-in-new-start-weapons-limits/

All news