Back to news

July 24, 2018 | Local, Aerospace

434 Squadron reformed as test and evaluation centre

Chris Thatcher

When your squadron lineage includes bomber, strike, fighter, operational training, and combat support roles, and your predecessors have flown everything from the Handley Page Halifax bomber to the Avro Lancaster, Canadair F-86 Sabre, Lockheed CF-104 Starfighter, Canadair CC-144 Challenger, and CT-133 Silver Star, it's perhaps fitting that you get reborn as an operational test and evaluation squadron.

At a ceremony at 8 Wing Trenton, Ont., on May 31, the Royal Canadian Air Force reformed the 434 “Bluenose” Squadron as 434 Operational Test & Evaluation (OT&E) Squadron, under command of the RCAF Aerospace Warfare Centre (RAWC).

The squadron last served as a combat support squadron in the 1990s, based at 14 Wing Greenwood, N.S. It was disbanded in 2002 and its colours placed in the All Saints Cathedral in Halifax.

“The fact that [the squadron] has flown so many different aircraft is [appropriate], in that we have now taken on OT&E for every single aircraft within the RCAF,” said LCol Graham Edwards, a long-range patrol navigator and the new commanding officer.

434 Squadron is being reformed and re-branded in response to the government's 2017 defence policy. With 13 initiatives specific to the RCAF and many aircraft due to be replaced or modernized, the workload for operational test and evaluation is going to increase.

By amalgamating five existing test and evaluation flights (TEFs)–helicopter, long-range patrol, transport, land aviation, and fighter–with two new flights for search and rescue and aerospace systems under one command, the Air Force hopes to better manage its limited resources as more platforms and systems require testing and evaluation.

“It was deemed that the status quo won't work if we are to achieve success with those initiatives,” said Edwards.

Historically, test and evaluation has been managed within each fleet of aircraft, but it has often drawn people from the operational squadrons and into the testing seats to conduct a trial of a new aircraft or aircraft system. Each community will continue to develop its own testing expertise, but by centralizing decisions about how those people are assigned, 434 Squadron hopes to manage the strain when capabilities are being introduced at the same time that the aircraft are being deployed. Search and rescue aircraft, the CP-140 Aurora or the strategic transport CC-177 Globemaster, for example, rarely have a dip in operational tempo.

“They can keep the structure of their operational force together,” Edwards said of the operational squadrons. “As the fleets convert back to operations with the new platform, we'll take the people from the test and evaluation chairs and move them back to the operational chairs. And then I can reallocate those test and evaluation [positions] to the next fleet that is undergoing the next transition.”

The two new flights are intended to address the arrival of the new CC-295W search and rescue aircraft into service in 2019 and the many ground-based and airborne systems that support all the fleets being introduced in the coming years, such as navigation aids, communication systems, ground-based radars, data link systems, and even simulators.

“The new Aero TEF is going to provide that body of expertise and create a body that is responsible to deliver that ground capability,” said Edwards, noting that a coordinated process will ensure interoperability between all systems during the OT&E phase. “There's no sense modifying the fleet with data link systems when we have not done the ground support with it.”

By including 434 Squadron under the RAWC, which has been transformed in recent years as one of the RCAF's core pillars with 1 Canadian Air Division (operations) and 2 Canadian Air Division (training), lessons acquired during the test and evaluation phase should be more readily incorporated into the development of doctrine and tactics, techniques and procedures (TTPs) that shape training and operations.

Among Edwards' immediate priorities are the amalgamation of the TEFs and establishing a new governance structure, what he called an “air test and evaluation master plan.”

But the process won't be completely new. As an exchange officer with RAF Waddington in 2008, he was part of the transformation of 56 Squadron into an OT&E unit for C4ISR (Command, Control, Computers, Communications and Intelligence, Surveillances and Reconnaissance), conducting trials on unmanned aerial systems, Airborne Warning and Control System aircraft, and Hawker Siddeley Nimrod maritime patrol aircraft.

The return of the squadron's colours was a proud moment and the members are keen to carry on its Bluenose traditions. No. 434 Squadron, adopted by the Rotary Club of Halifax, was the RCAF's 13th overseas bomber squadron, formed on June 13, 1943, at RCAF Station Tholthorpe in England. It was reformed as 434 Strike/Attack Squadron in 1963 and as 434 Operational Training Squadron in 1968. It was then re-designated 434 Tactical Fighter Operational Training Squadron in 1970, as 434 Composite Squadron in 1992, and finally as 434 Combat Support Squadron in 1993.

In its first two years of operations, the squadron accomplished eight significant battle honours, reflective of what it is trying to do now in a brief period, said Edwards. But he's hoping to break with at least one 434 Squadron tradition.

“The squadron would stand down every time it switched to a new aircraft. Now that we have all the aircraft of the RCAF under the remit of 434, I hope to see a bit more longevity in the squadron.”

  • Helicopter Operational Test & Evaluation Flight at 12 Wing Shearwater, N.S., is responsible for the operationalization of the CH-148 Cyclone Maritime Helicopter.
  • Long Range Patrol Operational Test & Evaluation Flight in 14 Wing Greenwood, N.S., is focused primarily on the CP-140 Aurora.
  • Transport Operational Test and Evaluation Flight, located at 8 Wing Trenton, Ont., deals with all air mobility fleets like the CC-130J Hercules, CC-177 Globemaster, and CC-150 Airbus.
  • Land Aviation Test and Evaluation Flight is in St Hubert, Que., and supports tactical aviation helicopters like the CH-147 Chinooks and CH-146 Griffons.
  • Fighter Operational Test & Evaluation Flight is in 4 Wing Cold Lake, Alta. and deals with fighter aircraft.
  • (new) Search and Rescue Test & Evaluation Flight will be stood-up at 19 Wing Comox, B.C., and will be responsible for the new Fixed-Wing Search and Rescue, CH-149 Cormorant, and the CC-130H Hercules and CH-146 Griffon SAR fleets.
  • (new) The Aerospace Systems Test & Evaluation Flight will be co-located with 434 Squadron headquarters in 8 Wing Trenton and will deal with ground-based aeronautical systems such as radars, navigational aids, meteorological systems and data links.

https://www.skiesmag.com/news/434-squadron-reformed-as-test-and-evaluation-centre/

On the same subject

  • Budget Officer’s analysis of used Australian F-18 deal to be released Thursday

    March 5, 2019 | Local, Aerospace

    Budget Officer’s analysis of used Australian F-18 deal to be released Thursday

    DAVID PUGLIESE, OTTAWA CITIZEN The Parliamentary Budget Officer will release his report Thursday on the federal government's purchase of used Australian F-18 fighter jets for the Canadian Forces. Yves Giroux's report will be a fiscal analysis of the government's acquisition of the 25 aircraft. Eighteen of the Australian F-18 aircraft will eventually be flying for the Canadian Forces, while another seven will be used for testing and spare parts. The Royal Canadian Air Force are using the jets as interim fighters to boost the capability of the current fleet of CF-18s until a new generation aircraft can be bought. The Royal Canadian Air Force recently received its first two used Australian fighter jets at 4 Wing Cold Lake in Alberta. The first two aircraft were F/A-18A models, which means they are single seat aircraft. The aircraft were flown to Cold Lake, Alberta, from Nellis, Nevada, where they were participating in Exercise RED FLAG. The aircraft will be employed at 3 Wing Bagotville and 4 Wing Cold Lake, according to the RCAF. Deliveries of the Australian jets will continue at regular intervals for the next three years, and aircraft will be integrated into the CF-18 fleet as modifications are completed, according to the RCAF. The final aircraft are expected to arrive by the end of 2021. A second group of planes are expected to arrive later this year. Canada is paying Australia $90 million for the aircraft. The federal government originally estimated the purchase of the Australian jets would cost around $500 million, but the Department of National Defence's procurement chief, Pat Finn, said that price reflected every aspect of the associated deal, not just the cost of purchasing the jets. Canada is also acquiring extra spare parts, the Australian jets will have to be outfitted with specific Canadian equipment and software and testing will be needed. The $500-million project estimate also included $50 million in contingency funds to cover any problems and another $35 million for the salaries of all civilian and military personnel involved over the life of the project. An additional $30 million will be spent on new infrastructure over the years needed to accommodate the aircraft. Those costs add up to $360 million, Finn said. But DND also plans to upgrade its existing fleet of CF-18s with new communications gear and equipment required to meet regulations to operate in civilian airspace, improvements which the Australian jets will also eventually receive at a cost of around $110 million, an amount that brought the original estimate to nearly $500 million. The Liberal government had planned to buy 18 new Super Hornet fighter jets from U.S. aerospace giant Boeing to augment the Royal Canadian Air Force's CF-18s until new aircraft can be purchased in the coming years. But in 2017 Boeing complained to the U.S. Commerce Department that Canadian subsidies for Quebec-based Bombardier allowed it to sell its C-series civilian passenger aircraft in the U.S. at cut-rate prices. As a result, the administration of U.S. President Donald Trump enacted a tariff of almost 300 per cent against the Bombardier aircraft sold in the U.S. In retaliation, Canada cancelled the deal to buy the 18 Super Hornets, which would have cost more than US$5 billion. Instead of buying the new Super Hornets, the Liberals decided to acquire the used Australian jets. https://ottawacitizen.com/news/national/defence-watch/budget-officers-analysis-of-used-australian-f-18-deal-to-be-released-thursday

  • Ottawa’s legal bill nearly $12 million for warship work

    November 28, 2018 | Local, Naval

    Ottawa’s legal bill nearly $12 million for warship work

    Andrea Gunn (agunn@herald.ca) The federal government has spent $11.8 million on legal fees relating to the Canadian Surface Combatant project over the past two years, some of that owing to a large number of amendments to the project's request for proposals. In an answer to a written question posed last month by a Calgary Conservative MP, Public Services and Procurement Canada confirmed that 88 amendments had been made between July 1, 2016, and Oct. 2, 2018 to the request for proposals for the massive, multibillion-dollar project that aims to replace the Royal Canadian Navy's fleet of frigates. The request for proposals — the document that interested consortiums would have crafted their bids around — was released to 12 companies that had been pre-qualified to participate in the procurement by Irving Shipbuilding in October 2016. Irving is the prime contractor for the combat portion of the National Shipbuilding Strategy, which includes the Arctic Offshore Patrol Ships and the Canadian Surface Combatant, and is tasked with building the 15 warships at its Halifax shipyard. At a projected cost of between $56 and $60 billion, it's the largest and most complex procurement in Canadian history. There were a number of delays in the closing date for the request for proposals. Originally set for April 2017, the first bids weren't received until last November. In its many technical briefings and media releases from that period, PSPC said the delays were partially as a result of the back-and-forth between industry, government and Irving — feedback which resulted in a number of amendments to the RFP. “A total of 88 amendments were issued by Irving Shipbuilding between November 1, 2016 and August 13 2018,” the order paper question response reads. “These amendments were developed and issued to address inquiries from the 12 pre-qualified bidders, and to incorporate process improvements to the competitive RFP so as to maximize the opportunities for bidders to demonstrate the value of their solutions to Canada.” The response goes on to say the $11.8 million was spent by the government of Canada on project legal fees during the amendment period, but that PSPC is not able to provide a breakdown on how much was spent on the amendments themselves. PSPC also noted that because Irving issued the RFP, they would have also incurred legal fees. In the end, three firms submitted bids for the Canadian Surface Combatant and last month the federal government chose a consortium of Lockheed Martin Canada and BAE Systems offering the UK navy's Type 26 global combat ship as the preferred bidder. Full article: https://www.thechronicleherald.ca/news/local/feds-legal-bill-nearly-12m-for-warship-work-261231/

  • Government of Canada announces investment in shipbuilding infrastructure for the Canadian Surface Combatant

    August 9, 2023 | Local, Naval

    Government of Canada announces investment in shipbuilding infrastructure for the Canadian Surface Combatant

    Through the National Shipbuilding Strategy (NSS), the Government of Canada is revitalizing the Royal Canadian Navy’s (RCN) surface fleet of ships to ensure that members have the equipment needed to do their jobs and protect Canadians.

All news