6 février 2019 | International, Aérospatial

U.S. Army selects GE’s T901 engine for Improved Turbine Engine Program

The U.S. Army has selected GE Aviation's T901-GE-900 engine for the Engineering and Manufacturing Development (EMD) phase of the Improved Turbine Engine Program (ITEP), the U.S. Army's endeavor to re-engine its Boeing AH-64 Apaches and Sikorsky UH-60 Black Hawks.

“We are honored to be chosen by the Army to continue powering their Black Hawks and Apaches for decades to come,” said Tony Mathis, president and CEO of GE Aviation's military business. “We've invested in the resources and infrastructure to execute immediately, and our team is ready to get to work on delivering the improved capabilities of the T901 to the warfighter.”

GE has powered Black Hawks and Apaches for the past four decades with its T700 engine, racking up more than 100 million flight hours of combat-proven experience. Through continuous upgrades and technology advancements, GE has doubled the power of derivative engines in the T700 family over its lifetime and reduced its cost to the government by 50 percent.

GE carried over the benefits of the T700 engine's single-spool core architecture, ensuring that the T901 engine is ready to continue delivering combat readiness to the warfighter over the next four decades. The T901's single-spool core design is the key to its low cost, growth, reliability, maintainability and reduced life-cycle costs.

The full modularity of the T901's single-spool core provides the Army with superior fix-forward maintainability. Combat units can swap out modular parts of the engine in the field and travel with fewer full-sized spare engines, simplifying logistical footprints and supply lines. The fully modular design also offers superior growth potential at a lower cost through incremental improvements to engine modules, a significant advantage to meet the Army's FVL requirements. The U.S. Army is also expecting the ITEP engine to meet Future Attack Reconnaissance Aircraft requirements for Future Vertical Lift (FVL).

GE has invested $9 billion in maturing technologies applicable to the T901 and more than $300 million to develop and test turboshaft-specific technologies. Additionally, GE has invested more than $10 billion in their supply chain over the past decade, including eight new facilities, ten plant expansions and one-and-a-half million square feet of new, advanced manufacturing space in the U.S. This robust, first-in-class supply chain stands ready to deliver T901 engines to the Army.

https://www.verticalmag.com/press-releases/u-s-army-selects-ges-t901-engine-for-itep/

Sur le même sujet

  • Leonardo DRS receives $62M contract for ship-based vertical launch system electronics

    12 août 2020 | International, Aérospatial

    Leonardo DRS receives $62M contract for ship-based vertical launch system electronics

    Arlington, VA, August 10, 2020 - Leonardo DRS, Inc. announced today that it was awarded a $62 million contract to provide critical electronics for missile launch capabilities for the Mark 41 Vertical Launching System (VLS) used by the United States Navy and international allies. Under the contract, the Leonardo DRS Airborne & Intelligence Systems business unit will produce and provide support for 118 motor control panels, a critical component on the VLS launch module. The panels control the opening and closing of the launch tube hatches, plenum drain valve and deluge while interfacing with the Launch Sequencer. “We have supplied motor control panels and other electronic control systems to the MK 41 VLS program for more than 30 years in support of this important mission,” said Dave Hammond, Senior Director of Mission Support for the Leonardo DRS's Airborne and Intelligence Systems line of business. “This contract exemplifies our commitment to supply quality electronics to support the US Navy and allied navies,” said Hammond. The MK 41 VLS is a flexible shipborne missile launching system designed to accept any missile into any cell while providing rapid-fire launch capability against hostile threats. There are 1,500 MK 41 VLSs deployed on surface ships in the United States Navy and more than 11 allied navies. The system requires minimal staffing and training compared to other ship-based missile launch systems, a revolutionary development in naval surface warfare. The MK 41 is capable of launching a variety of missiles in support of various warfighting missions, including, anti-air, anti-submarine, surface-to-surface and strike missions. Each cell in a launch module has options for different missiles to meet a variety of missions. The Motor Control Panel, Status Panel, Power Distribution Panels, Junction Boxes and Spares will be built at the company's Fort Walton Beach, Florida facility. About Leonardo DRS Leonardo DRS is a prime contractor, leading technology innovator and supplier of integrated products, services and support to military forces, intelligence agencies and defense contractors worldwide. Its Airborne & Intelligence Systems business unit is a global leader and strategic partner committed to delivering world-class, full life-cycle defense and intelligence products that protect the security of our nation and our allies. From air combat training to state-of-the-art electronic warfare systems, our technology is deployed by virtually all U.S. military and government agencies around the world. Headquartered in Arlington, Virginia, Leonardo DRS is a wholly owned subsidiary of Leonardo S.p.A. See the full range of capabilities at www.LeonardoDRS.com and on Twitter @LeonardoDRSnews. For additional information please contact: Michael Mount Vice President, Public Affairs +1 571 447 4624 mmount@drs.com View source version on Leonardo DRS: https://www.leonardodrs.com/news/press-releases/62m-contract-received-for-ship-based-vertical-launch-system-electronics/

  • Why program cuts from Esper’s Pentagon-wide review could come sooner than expected

    10 septembre 2019 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Why program cuts from Esper’s Pentagon-wide review could come sooner than expected

    By: Aaron Mehta WASHINGTON — U.S. Defense Secretary Mark Esper intends to implement changes from his review of Defense Department organizations on a rolling basis, rather than waiting until the review process is completely finished, according to the department's top spokesman. Jonathan Rath Hoffman, assistant to the secretary of defense for public affairs, said Monday that there's “no interest” from Esper to wait until the review is fully done or the start of the next fiscal year to start implementing program changes, including potential cuts. “It's going to be an ongoing process. If he makes a decision, it's not going to be ‘I have to look through everything and then make some decisions.' If he sees a program that needs to end or be moved, he'll make that decision as quickly as he can,” Hoffman told reporters. “He's going to make changes as we move forward. If he identifies changes that would save money, there's no interest in waiting until next year to start saving money.” An Aug. 2 memo kicked off a departmentwide review of programs ahead of the development for the fiscal 2021 budget request. The goal is to find savings and drive a “longer-term focus on structural reform, ensuring all [defensewide] activities are aligned to the National Defense Strategy while evaluating the division of functions between defense-wide organizations and the military departments," per the document. The so-called fourth estate of the department includes 27 agencies, such as the Defense Intelligence Agency, the Defense Information Systems Agency and the Missile Defense Agency. A September 2018 report from the Government Accountability Office estimated those agencies collectively have an annual budget of at least $106 billion. Esper has acknowledged the review sounds a lot like the “night court” process the Army used to find roughly $25 billion in savings that could then be reinvested into new capabilities. But he has so far declined to offer a target dollar figure for savings. "It's a long road. I'm spending two hours a week, 90 minutes to two hours a week on this in formal session, so we're just going to work our way through it week after week after week,” the secretary said Aug 27. “I'm looking for programs that don't have as much value relative to another critical war-fighting capability, absolutely.” Hoffman described the process as starting with internal reviews inside the various offices, looking at what projects are ongoing. Those are cross-checked with assessments from others in the department that are looking to find cost-sharing or cost-saving options. Those are collectively provided up to the deputy secretary of defense before being presented at regular meetings with Esper. Esper then “holds a review with all the parties that may have equities and go through it. I sat through one of these last week. He really digs into what are the appropriate roles, what are the appropriate missions, is there someone better or capable to hold this than the equity that has it now, is there better cost savings,” Hoffman said. Some have questioned whether Esper's plans will run into roadblocks in Congress. On Monday, Hoffman stressed that the department has been keeping Congress in the loop. “The secretary has been very adamant he wants to make sure Congress is fully informed,” he said. https://www.defensenews.com/pentagon/2019/09/09/program-cuts-from-espers-pentagon-wide-review-could-come-sooner-than-expected/

  • Sweden halts plan for Gripen jets to Ukraine, news agency TT reports
Toutes les nouvelles