29 août 2024 | International, C4ISR, Sécurité

U.S. Agencies Warn of Iranian Hacking Group's Ongoing Ransomware Attacks

U.S. agencies warn of Iranian hackers targeting key sectors with ransomware, exploiting security flaws to breach networks.

https://thehackernews.com/2024/08/us-agencies-warn-of-iranian-hacking.html

Sur le même sujet

  • The drive to advance missile defense is there, but there must be funding

    3 février 2020 | International, Aérospatial

    The drive to advance missile defense is there, but there must be funding

    By: Richard Matlock Over the past five years, missile threats have evolved far more rapidly than conventional wisdom had predicted. Best known is North Korea's accelerated development and testing of sophisticated, road-mobile ballistic missiles. But the U.S. National Defense Strategy requires renewed focus on greater powers. China has adopted an anti-access strategy consisting of new offensive missiles, operational tactics and fortifications in the South China Sea. Russia, too, has developed highly maneuverable hypersonic missiles specifically designed to defeat today's defenses. Grappling with these sobering realities demands change. The 2019 Missile Defense Review called for a comprehensive approach to countering regional missiles of all kinds and from whatever source, as well as the increasingly complex intercontinental ballistic missiles from rogue states. But programs and budgets have not yet aligned with the policy. The upcoming defense budget submission presents an important opportunity to address these new and complex challenges. The Missile Defense Agency's current top three goals are sustaining the existing force, increasing capacity and capability, and addressing more advanced threats. The first two are necessary but insufficient. The third goal must be elevated to adapt U.S. missile defense efforts to the geopolitical and technological realities of our time. For the last decade, less than 2 percent of MDA's annual funding has been dedicated to developing advanced technology, during which time our adversaries have begun outpacing us. As President Donald Trump said last January, we “cannot simply build more of the same, or make incremental improvements.” Adapting our missile defense architecture will require rebalance, discipline and difficult choices. Realigning resources to develop advanced technologies and operational concepts means investing less in single-purpose systems incapable against the broader threat. It also requires we accept and manage new kinds of risk. Indeed, meeting the advanced threat may, in the short term, require accepting some strategic risk with North Korea. The beginning of this rebalance requires more distributed, elevated and survivable sensors capable of tracking advanced threats. The most important component here is a proliferated, globally persistent space layer in low-Earth orbit consisting of both passive and active sensors. MDA may be the missile defense-centric organization best suited to developing and integrating this capability into the architecture, but there is considerable opportunity for partnering with others to move out smartly, as recently urged by Vice Chairman of the Joint Chiefs of Staff Gen. John Hyten. Partnerships with the Space Development Agency and the Air Force can be supplemented by collaborative efforts with commercial space companies. We need not do this all at once. Space assets could be fielded in phases, with numbers, capability (sensors, interceptors, lasers), missions, and orbits evolving over time. MDA demonstrated a similar paradigm with the Delta experiments, Miniature Sensor Technology Integration series and the Near Field Infrared Experiment in the past. Meanwhile, other sensors could alleviate the cost of building new, billion-dollar radar on islands in the Pacific Ocean — efforts which continue to suffer delay. Adding infrared tracking sensors to high-altitude drones, for instance, has already been demonstrated experimentally in the Indo-Pacific theater with modified Reaper unmanned aerial vehicles. These need not be dedicated assets. Sensor pod kits could be stored in theater to be deployed aboard Reapers or other platforms during heightened tensions. We must revisit boost-phase defenses and directed energy. In 2010, the Airborne Laser program demonstrated that lasers could destroy missiles in the boost phase, but deploying toxic chemical lasers aboard large commercial aircraft was fiscally and operationally untenable. Fortunately, considerable operational promise exists with recently developed solid-state lasers (the cost of which is around $2 of electricity per shot). We must move these systems out of the laboratory and build and test operational prototypes. Near-term actions to better manage risk against the rogue-state ballistic missile threat must not overtake the pursuit of these larger goals. Although the Pentagon is currently considering a 10-year, $12 billion program for a next-generation interceptor, nearer-term, cheaper options are available. Replacing each existing kill vehicle on the Ground-Based Interceptors with several smaller kill vehicles would multiply each interceptor's effectiveness dramatically. The U.S. has been developing this technology since 2006, including a “hover” flight test in 2009. Affordable solutions like this must be found. Missile defense cannot do it all. Denying, degrading and destroying enemy missile systems prior to launch must be part of the mix. But left-of-launch activities can be expensive and difficult, and reliance on a cyber magic wand carries risk, too. We need to broaden our approach to attack all parts of our adversary's kill chain. The National Defense Strategy urges that we contend with the world as it is, not as we might wish it to be — or as it previously was. To meet the threats of today and tomorrow, we must radically transform our U.S. missile defenses. It falls to the 2021 budget to do so. https://www.defensenews.com/opinion/commentary/2020/01/31/the-drive-to-advance-missile-defense-is-there-but-there-must-be-funding/

  • Maxar wins more work on Army’s One World Terrain virtual training tool

    28 février 2023 | International, C4ISR

    Maxar wins more work on Army’s One World Terrain virtual training tool

    All phases and options of the One World Terrain prototype project were previously said to be worth nearly $95 million.

  • Contract Awards by US Department of Defense - April 23, 2020

    24 avril 2020 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contract Awards by US Department of Defense - April 23, 2020

    AIR FORCE Dataminr Inc., New York, New York, has been awarded a firm-fixed-price contract for $258,661,096 for a commercially available license subscription that can leverage a variety of publicly available information sources, evaluate content to detect emerging events as they are developing and push alerts to users based on user-defined areas and topics of interest. The solution must be capable of distributing alerts in near real-time via email, web-based application and mobile platforms. The solution must be available commercially in the marketplace and able to scale to a Department of Defense enterprise capability and keep pace with developments and standards within the commercial industry sector. Work will be performed in New York and is expected to be complete by April 23, 2025. This award resulted after three firms were solicited and submitted bids. Fiscal 2020 operations and maintenance funds in the amount of $48,720,000 are being obligated at the time of the award. The Air Force District Washington, Joint Base Andrews, Maryland, is the contracting activity (FA7014-20-C-0016). Aviation Training Consulting LLC, Altus, Oklahoma, has been awarded a $7,281,483 firm-fixed-price modification (P00043) to previously-awarded contract FA8621-16-C-6339 for B-52 training system contractor logistics support and training system support center sustainment. The contract modification is for the third increment of the seven year basic contract. Work will be performed at Barksdale Air Force Base, Louisiana; and Minot AFB, North Dakota, and is expected to be completed by Oct. 31, 2020. Air Force fiscal 2020 operations and maintenance funds will fund this effort. The total cumulative face value of the contract is $7,281,483. The Air Force Life Cycle Management Center, Wright-Patterson AFB, Ohio, is the contracting activity. NAVY Lockheed Martin Rotary and Mission Systems, Baltimore, Maryland, was awarded a $147,639,775 undefinitized contract action modification to previously-awarded contract N00024-20-C-5310 for the procurement of MK 41 Vertical Launching System (VLS) vertical launcher module electronic components. Work will be performed in Baltimore, Maryland (44%); Fort Walton Beach, Florida (39%); Waverly, Iowa (3%); Hampstead, Maryland (2%); Dover, Pennsylvania (2%); Chaska, Minnesota (1%); St. Peters, Missouri (1%); Wooddale, Illinois (1%); Plainview, New York (1%); Irvine, California (1%); Roebling, New Jersey (1%); Forest Hill, Maryland (1%); Millersville, Maryland (1%); Sterling Heights, Michigan (1%); and Red Lion, Pennsylvania (1%). This modification provides the electronic components for MK 41 VLS, which is installed onboard Navy surface combatants (CG-47 and DDG-51 class ships) and multiple allied Navy platforms. MK 41 VLS stores, selects, prepares and launches standard missiles, Tomahawk, Vertical Launch Anti-Submarine Rocket and Evolved Sea Sparrow missiles. Work is expected to be completed by March 2025. This contract combines purchases for the Navy (65%); and the governments of South Korea, Finland and Germany (35%) under the Foreign Military Sales (FMS) program. Fiscal 2018 and 2019 shipbuilding and conversion (Navy); and FMS funding in the amount of $29,527,952 was obligated at the time of award and will not expire at the end of the current fiscal year. The Naval Sea Systems Command, Washington, District of Columbia, is the contracting activity. (Awarded April 17, 2020) Trijicon Inc.,* Wixom, Michigan, is awarded a $41,218,080 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for the remanufacture of Rifle Combat Optics (RCOs). This contract provides for the materials, labor, equipment, facilities and missing/repair parts necessary to inspect, diagnose, test and restore the RCOs. Work will be performed in Wixom, Michigan, and is expected to be completed by April 2025. This contract has a five-year ordering period with a maximum value of $41,218,080. Fiscal 2020 operations and maintenance (Marine Corps) in the amount of $8,160,000 will be obligated at the time of award for the first task order and will expire at the end of the current fiscal year. This contract was not competitively procured in accordance with 10 U.S. Code 2304(c)(1) - only one responsible source and no other supplies or services will satisfy agency requirements. The Marine Corps Logistics Command, Albany, Georgia, is the contracting activity (M67004-20-D-0003). Avian LLC,* Lexington Park, Maryland, is awarded a $13,342,932 modification (P00068) to exercise an option on a previously-awarded cost-plus-fixed-fee contract (N00421-17-C-0049) to provide support for the Naval Air Warfare Center Aircraft Division's Integrated System Evaluation Experimentation and Test Department. Work will be performed in Patuxent River, Maryland, and services will include flight test engineering, programmatic, administrative, design, execution, analysis, evaluation and reporting of tests and experiments of aircraft, unmanned air systems, weapons and weapons systems. Work is expected to be completed in April 2021. Fiscal 2020 research, development, test and evaluation (Navy) in the amount of $3,783,077; fiscal 2019 research, development, test and evaluation (Navy) in the amount of $90,000; fiscal 2020 aircraft procurement (Navy) funds in the amount of $1,549,886; fiscal 2019 aircraft procurement (Navy) funds in the amount of $28,732; fiscal 2020 operations and maintenance (Navy) funds in the amount of $19,816; fiscal 2020 other procurement (Navy) funds in the amount of $144,756; and Foreign Military Sales funds in the amount of $310,238 will be obligated at time of award, $254,572 of which will expire at the end of the fiscal year. The Naval Air Warfare Center Aircraft Division, Patuxent River, Maryland, is the contracting activity. ARMY ECS Federal LLC, Fairfax, Virginia, was awarded an $83,099,372 cost-plus-fixed-fee contract for to create combined artificial intelligence (AI)-platform prototypes enhance. Bids were solicited via the internet with one received. Work will be performed in Fairfax, Virginia, with an estimated completion date of March 26, 2023. Fiscal 2020 research, development, test, and evaluation, Army funds in the amount of $83,099,372 were obligated at the time of the award. U.S. Army Contracting Command, Aberdeen Proving Ground, Aberdeen, Maryland, is the contracting activity (W911QX-20-C-0023). Sherwood Aviation,* Opa Locka, Florida, was awarded an $18,636,740 firm-fixed-price contract for overhaul/repair of CH-47 gas turbine engines. Bids were solicited via the internet with three received. Work locations and funding will be determined with each order, with an estimated completion date of April 23, 2025. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity (W58RGZ-20-D-0051). General Atomics Aeronautical Systems Inc., Poway, California, was awarded a $9,943,746 modification (P00044) to contract W58RGZ-19-C-0027 for continuation effort for the Gray Eagle Unmanned Aircraft System. Bids were solicited via the internet with one received. Fiscal 2020 operations and maintenance, Army funds in the amount of $9,943,746 were obligated at the time of the award. Work will be performed in Poway, California, with an estimated completion date of April 23, 2021. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. Boyer Commercial Construction Inc.,* Columbia, South Carolina, was awarded an $8,686,240 firm-fixed-price contract for national cemetery expansion at Fort Jackson, South Carolina. Bids were solicited via the internet with seven received. Work will be performed in Columbia, South Carolina, with an estimated completion date of May 14, 2021. Fiscal 2020 Department of Veteran Affairs funds in the amount of $8,686,240 were obligated at the time of the award. U.S. Army Corps of Engineers, Charleston, South Carolina, is the contracting activity (W912HP-20-C-2001). DEFENSE LOGISTICS AGENCY Robertson Fuel Systems LLC, Tempe, Arizona, has been awarded a maximum $38,784,713 firm-fixed-price, indefinite-delivery requirements contract for aircraft fuel tanks. This was a sole-source acquisition using justification 10 U.S. Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a five-year contract with no option periods. Location of performance is Arizona, with an April 23, 2025, performance completion date. Using military service is Army. Type of appropriation is fiscal 2020 through 2025 Army working capital funds. The contracting activity is the Defense Logistics Agency Aviation, Redstone Arsenal, Alabama (SPRRA1-20-D-0034). *Small business https://www.defense.gov/Newsroom/Contracts/Contract/Article/2162978/source/GovDelivery/

Toutes les nouvelles