4 septembre 2019 | International, Terrestre

Textron Preps For Mass Production Of New Army Rifle

By SYDNEY J. FREEDBERG JR.

WASHINGTON: Textron has partnered with global gun-maker Heckler & Koch to mass-produce new rifles for the Army and with ammunition giant Olin Winchester to churn out the high-powered yet lightweight 6.8 millimeter rounds.

Textron still has to beat both General Dynamics and Sig Sauer for the right to build the Next Generation Squad Weapons (NSGW). All three companies won awards last Thursday to build prototypes for troops to test, starting this coming spring and continuing through late 2021. No follow-on production contract is guaranteed. But Textron is watching the Army's urgent push to modernize across the force, from assault rifles to hypersonic missiles and wants to be ready to sprint to mass production if it wins.

Textron could do everything in house, senior VP Wayne Prender said. But, he told reporters this morning, by working with Olin Winchester and H&K, which are experienced with largescale manufacture of ammo and weapons respectively, “we are preparing ourselves for a high rate of production.”

The Army wants to start fielding two variants of NGSW to tens of thousands of close combat troops — infantry, scouts, special operators, and so on — in 2022. Support troops and vehicle crews will stick with the current M4 carbine for the indefinite future. But frontline ground combatants will get more than just a gun.

Linked wirelessly with electronics all over the soldier's body, including Microsoft HoloLens-derived targeting goggles called IVAS, the Next Generation Squad Weapon is meant to be just one lethal component of a larger, high-tech system. It's like the Hellfire missiles on an Apache helicopter or the 120 mm Rheinmetall smoothbore cannon on an M1 tank, except this “weapons platform” moves on foot. This approach is part of a wider push, begun by former Defense Secretary (and Marine Corps rifleman) Jim Mattis, to improve the Close Combat Lethality of the military's most exposed members.

The American grunt has accumulated more and more high tech over the last two decades. Designing a new weapon from scratch is a chance to streamline the scopes, cables, batteries, and other impedimenta festooning modern foot troops.

“All of those are now part of an integrated weapon system, versus a rifle that then has something else strapped onto it with wires hanging off,” Prender told reporters. “We can make some smart decisions early in the design process that enable it to be cleaner.” That should make the new weapon easier to use, lighter, and even better balanced, since the center of gravity is now calculated with installing add-ons in mind.

Three Contenders, 27 Months

While troops will test the first prototypes this spring, each contender has 27 months to deliver a total of 53 NGSW assault rifles — potential replacements for the M16/M4 family in service since Vietnam — and 43 automatic rifles — replacing the M249 SAW — along with 850,000 rounds of 6.8 mm ammunition.

Like the M16, M4, and M249 with the 5.56 mm cartridge, the new NGSW family will all share a common 6.8 mm round, which is supposed to deliver longer range and greater body-armor-penetrating power without increasing weight much. Each competitor has their own spin on how to deliver the new rifle bullet.

  • Sig Sauer, which already builds the Army's standard 9mm pistol and a host of other limited-issue weapons, has taken what seems to be the most conservative approach. It offers what the company calls a “hybrid” cartridge, which is still made of metal like traditional brass casings, but significantly lighter.
  • General Dynamics's Ordnance & Tactical Systems (OTS) division has partnered with a Texan firm, True Velocity, to build “composite” rounds out of polymers. In layman's words, the bullet is packaged, not in brass, but rugged plastic. Again, the goal is to save weight.
  • Textron's approach is arguably the most radical, to the point it doesn't even look like a bullet, just a cylinder that's equally blunt on both ends. That's because it's a cased telescoped round, sheathing the entire bullet in a polymer shell, surrounded by its propellant instead of sitting on top of it. (The resulting case looks like a folded-up telescope, hence the name). Textron says this method cuts weight per shot by 40 percent, a potential boon for overburdened foot troops.

The Army's new modernization strategy — after decades of cancelled programs and incremental changes to aging weapons — is to try such great leaps forward but then test prototypes ASAP with real troops in the field.

The service has been “opening the doors of the Army to the contractors to get that feedback early and often,” Prender said approvingly. Each round of user feedback is meant to help the contractors improve their product, and the military to refine their specifications, until the service can confidently choose a refined design.

Now, the Army isn't locking itself in. Whoever does best in testing, the Army hasn't promised the winner a production contract. But Textron is betting they can convince an eagerly modernizing Army that their product is not only superior but ready to field without further R&D.

“Whether [to] move right into an initial Low-Rate Initial Production, followed by fielding and first unit equipped, or [to do] additional prototyping and maturation of the weapon system... all that will be determined by the Army,” Prender told reporters. “We have high confidence that our weapon system will meet all of the requirements that the Army has laid out... so we're looking forward to at the end of those 27 months to move into production.”

https://breakingdefense.com/2019/09/textron-readies-for-mass-production-of-new-army-rifle

Sur le même sujet

  • OCCAR contracts MBDA to launch HYDIS² concept phase

    16 mai 2024 | International, Terrestre

    OCCAR contracts MBDA to launch HYDIS² concept phase

    The European Commission selected the HYDIS² project for funding in July 2023 and the governments of France, Germany, Italy and the Netherlands decided to co-fund.

  • Contract Awards by US Department of Defense - October 03, 2019

    4 octobre 2019 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contract Awards by US Department of Defense - October 03, 2019

    DEFENSE HEALTH AGENCY CORRECTION: Shoreland Inc., Milwaukee, Wisconsin, was awarded a firm-fixed-price contract with a maximum value of $21,650,000. HT0038-19-C-0002 provides for the renewal of the commercial-off-the shelf enterprise publications licenses in support of the Military Health System. Licenses allow continuing access to a multinational collaborative database that provides up-to-date international unclassified medical intelligence data supporting patient movement, preventative medicine, and clinical contingencies planning for military medical and deployment planners and providers. This effort has a one-year base period of performance, and three one-year option periods. The estimated completion date is Sept. 30, 2023. Work will occur in Milwaukee, Wisconsin. The base task order will be funded by fiscal 2020 operation and maintenance funds. The award is the result of a non-competitive solicitation in accordance with FAR 6.302-1. The contracting activity is the Defense Health Agency. NAVY BAE Systems Technology Solutions and Services, Rockville, Maryland, is awarded an $18,351,068 cost-plus-fixed-fee contract to provide engineering and technical services for integrated communications and information systems radio communications on various Navy ships in support of the Ship and Air Integration Warfare Division, Naval Air Warfare Center Aircraft Division, Webster Outlying Field. Work will be performed in St. Inigoes, Maryland (60%); California, Maryland (30%); Bath, Maine (5%) and Pascagoula, Mississippi (5%), and is expected to be completed in June 2029. Fiscal 2020 shipbuilding and conversion (Navy) funds in the amount of $18,351,068 will be obligated at time of award, none of which will expire at the end of the current fiscal year. This contract was competitively procured via an electronic request for proposal; one offer was received. The Naval Air Warfare Center Aircraft Division, Patuxent River, Maryland, is the contracting activity (N00019-20-C-0003). General Atomics, San Diego, California, is awarded a $12,255,842 modification (P00019) to a cost-plus-fixed-fee delivery order (0001) against a previously issued basic ordering agreement (N00019-16-G-0006). This modification increases the level of effort for repair of repairables (ROR) and technical assistance. ROR includes efforts and materials required to inspect and repair or remanufacture unserviceable repairable components that are provided to the contractor as government furnished property and return the electromagnetic aircraft launch systems (EMALS) and advanced arresting gear (AAG) repairable items to a fully operational status. Technical assistance includes the necessary services to provide "on-call/on-site" emergency repairs. Repair services and technical assistance will also be provided for EMALS and AAG shipboard systems. Work will be performed in Tupelo, Mississippi (55%); San Diego, California (35%); Norfolk, Virginia (6%); Waltham, Massachusetts (2%); Philadelphia, Pennsylvania (1%); and San Leandro, California (1%), and is expected to be completed in September 2020. Fiscal 2019 shipbuilding and conversion (Navy) funds in the amount of $12,255,842 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. AIR FORCE Mississippi Department of Rehabilitation Services, Madison, Mississippi, has been awarded a $7,706,151 modification (P00012) to exercise an option on previously awarded contract FA3010-18-C-0007 for full food services. The location of performance is Keesler Air Force Base, Mississippi, and the work is expected to be complete by Sept. 30, 2020. Fiscal 2020 operations and maintenance funds in the amount of $7,706,151 will be obligated when they become available. The 81st Contracting Squadron, Keesler Air Force Base, Mississippi, is the contracting activity. ARMY KBRwyle Technology Solutions LLC, Columbia, Maryland, was awarded a $7,142,371 modification (0001 49) to contract W52P1J-12-G-0061 for logistics support services, maintenance, supply and care of supplies in storage. Work will be performed in Waegwan, South Korea, with an estimated completion date of May 28, 2020. Fiscal 2020 operation and maintenance funds in the amount of $600,000 were obligated at the time of the award. U.S. Army Contracting Command, Rock Island Arsenal, Illinois, is the contracting activity. https://www.defense.gov/Newsroom/Contracts/Contract/Article/1979758/source/GovDelivery/

  • Watchdog agency accuses chief of military police of blocking investigations | CBC News

    5 mai 2024 | International, Terrestre

    Watchdog agency accuses chief of military police of blocking investigations | CBC News

    The country's military police watchdog has accused the Canadian Forces Provost Marshal of obstructing its independent reviews of complaints.

Toutes les nouvelles