10 octobre 2023 | International, C4ISR

Space Force seeks bids for next phase of national security launches

The strategy pursues a two-lane approach to procuring launches -- one for emerging providers a second for rockets that can fly more demanding missions.

https://www.defensenews.com/battlefield-tech/space/2023/10/05/space-force-seeks-bids-for-next-phase-of-national-security-launches/

Sur le même sujet

  • Contract Awards by US Department of Defense - May 26, 2020

    27 mai 2020 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contract Awards by US Department of Defense - May 26, 2020

    NAVY AECOM Technical Services Inc., Los Angeles, California (N62470-19-D-8022); Aptim Federal Services LLC, Alexandria, Virginia (N62470-19-D-8023); CH2M Hill Constructors Inc., Englewood, Colorado (N62470-19-D-8024); Environmental Chemical Corp., Burlingame, California (N62470-19-D-8025); Fluor Intercontinental Inc., Greensville, South Carolina (N62470-19-D-8026); and Perini Management Services Inc., Framingham, Massachusetts (N62470-19-D-8027), are awarded a $1,000,000,000 modification to increase the maximum dollar value of an indefinite-delivery/indefinite-quantity, multiple award contract for global contingency construction projects worldwide. The work to be performed provides for the Navy on behalf of the Department of Defense and other federal agencies for immediate response for construction services when authorized. The construction and related engineering services will respond to natural disasters, humanitarian assistance, conflict or projects with similar characteristics and will be predominately construction. The contractor, in support of the construction effort, may be required to provide initial base operating support services, which will be incidental to construction efforts. After award of this modification, the total cumulative contract value will be $2,087,443,694. The term of the contract is not to exceed 60 months with a completion date of March 2024. No funds will be obligated at time of award; funds will be obligated on subsequent modifications for work on existing individual task orders. The Naval Facilities Engineering Command Atlantic, Norfolk, Virginia, is the contracting activity. Raytheon Co. Integrated Defense Systems, Tewksbury, Massachusetts, is awarded a $29,222,688 cost-plus-fixed-fee contract for the Receive Only Cooperative Radar and its system. This contract provides for the development of new detection algorithms and operating modes for the AN/SPY-6(V)1 radar system, which will improve detection and tracking capabilities of the radar system. Work will be performed in Marlboro, Massachusetts (98%); and Fairfax, Virginia (2%). The work to be performed includes modelling and simulation of new operating modes, revisions of code to incorporate new algorithms, integration of algorithms into demonstration hardware and field tests using representative AN/SPY-6(V)1 demonstration hardware. Work is expected to be completed by May 25, 2023. The total cumulative value of this contract is $29,222,688. This is a three-year base contract with one two-year option period, which, if exercised, would increase cumulative contract value to $47,513,260. The action will be incrementally funded with an initial obligation of $6,722,688 utilizing fiscal 2020 research, development, test and evaluation (Navy) funds that will not expire at the end of the current fiscal year. This contract was competitively procured under N00014-19-S-B001, “Long Range Broad Agency Announcement (BAA) for Navy and Marine Corps Science and Technology.” Since proposals are received throughout the year under the long range BAA, the number of proposals received in response to the solicitation are unknown. The Office of Naval Research, Arlington, Virginia, is the contracting activity (N00014-20-C-1073). Lockheed Martin Aeronautics Co., Fort Worth, Texas, is awarded a $15,989,488 cost-plus-fixed-fee order (N00019-20-F-0817) against a previously-issued basic ordering agreement N00019-19-G-0008. This order procures support to manage diminishing manufacturing sources in support of the F-35 program for the Air Force, Navy and non-Department of Defense (DOD) participants. Work will be performed in Fort Worth, Texas, and is expected to be complete by June 2020. Fiscal 2018 aircraft procurement (Air Force) funds in the amount of $6,545,775; fiscal 2019 aircraft procurement (Navy) funds in the amount of $6,545,774; and non-DOD participant funds in the amount of $2,897,939 will be obligated at time of award, $6,545,775 of which will expire at the end of the current fiscal year. The Naval Air Systems Command, Patuxent River, Maryland, is the contracting activity. CACI Inc. - Federal, Chantilly, Virginia, is awarded a $14,899,365 firm-fixed-price contract (N32205-20-C-4008) for 365-calendar day worldwide logistics services. The $14,899,365 consists of the amounts listed in the following areas: labor, materials and travel. Work will be performed worldwide. Work will include worldwide support services in the functional areas of sustainment logistics, corrective maintenance logistics system support, combat logistics force load management, material handling equipment, ordnance handling equipment support and ordnance management. Work is expected to be complete by June 2021. The contract includes one option period, which if exercised, will bring the total contract value to $29,628,581. Funds will be obligated on June 1, 2020. Contract funds in the amount of $14,899,365, excluding the option period, are obligated for fiscal 2020 using Navy working capital funds and (transportation) working capital funds. This contract is a sole-source and one offer was received. The Naval Military Sealift Command, Norfolk, Virginia, is the contracting activity. Grammatech Inc., Ithaca, New York, is awarded a $7,569,838 modification (P00010) to previously-awarded cost-plus-fixed-fee contract N68335-17-C-0700. This modification exercises an option to procure continued services and materials necessary to conduct research and develop the Late-Stage Software Customization and Complexity Reduction project. Work will be performed in Ithaca, New York. Specifically, this modification provides for the research and development of five software tools – Grammatech Transformer (GTx)-Reducer, GTx-Optimizer, GTx-Hardener and Vertex and LiftBridge. These software tools improve the viability of late stage customization against software binaries. Work is expected to be complete by May 2022. Fiscal 2020 research, development, test and evaluation (Navy) funds in the amount of $469,719 will be obligated at time of award, none of which will expire at the end of the current fiscal year. The Naval Air Warfare Center Aircraft Division, Lakehurst, New Jersey, is the contracting activity. CORRECTION: The May 15, 2020, announcement of an indefinite-delivery/indefinite-quantity contract (N00383-20-D-XE01) awarded to S&K Aerospace LLC,* St. Ignatius, Montana, for the repair, overhaul and upgrade of 361 commercial common items used on P-8A Poseidon maritime aircraft included incorrect solicitation information. The contract was competitively procured with the solicitation posted to the Federal Business Opportunities website as a small business set-aside (SBSA) requirement and not as an 8(a)SBSA. ARMY Ernst & Young LLP, Washington, D.C., was awarded a $93,000,000 modification (P00023) to contract W91CRB-18-F-0238 for professional commercial audit support services. Work will be performed in Washington, D.C., with an estimated completion date of Sept. 20, 2021. Fiscal 2020 operations and maintenance (Army) funds in the amount of $12,337,384 were obligated at the time of the award. U.S. Army Contracting Command, Aberdeen Proving Ground, Maryland, is the contracting activity. General Dynamics Mission Systems Inc., Huntsville, Alabama, was awarded a $16,211,164 modification (P00068) to contract W58RGZ-18-C-0043 for engineering services and contractors on the battlefield. Work will be performed in Huntsville, Alabama, with an estimated completion date of Sept. 17, 2023. Fiscal 2020 operations and maintenance (Army) funds in the amount of $16,211,164 were obligated at the time of the award. U.S. Army Contracting Command, Redstone Arsenal, Alabama, is the contracting activity. ProSecure LLC,* Fairfax, Virginia, was awarded an $11,165,786 firm-fixed-price contract for armed guard security services. Bids were solicited via the internet with 12 received. Work will be performed in the cities of Rufus, The Dalles and Cascade Locks, Oregon, with an estimated completion date of July 3, 2025. Fiscal 2020 civil expenses funds in the amount of $11,165,786 were obligated at the time of the award. U.S. Army Corps of Engineers, Portland, Oregon, is the contracting activity (W9127N-20-C-0003). DEFENSE LOGISTICS AGENCY Paragon-One Group LLC,* Gaithersburg, Maryland, has been awarded a maximum $57,792,000 firm-fixed-price, indefinite-delivery/indefinite-quantity contract for managed print software services. This was a competitive acquisition with six responses received. This is a three-year contract with no option periods. Locations of performance are inside and outside the continental U.S., with a May 25, 2023, performance completion date. Using customer is Defense Logistics Agency. Type of appropriation is fiscal year 2020 through 2023 working capital funds. The contracting activity is the Defense Logistics Agency Contracting Services Office, New Cumberland, Pennsylvania (SP7000-20-D-0003). Sikorsky Aircraft Corp., Stratford, Connecticut, has been awarded a maximum $7,946,333 firm-fixed-price delivery order (SPRPA1-20-F-C12U) against a five-year basic ordering agreement (SPRPA1-17-G-C101) for H-53 hydraulic fluid tanks. This was a sole-source acquisition using justification 10 U.S. Code 2304 (c)(1), as stated in Federal Acquisition Regulation 6.302-1. This is a five-year contract with no option periods. Location of performance is Connecticut, with an April 30, 2025, performance completion date. Using military service is Navy. Type of appropriation is fiscal 2020 through 2025 Navy working capital funds. The contracting activity is the Defense Logistics Agency Aviation, Philadelphia, Pennsylvania. Burlington Industries LLC, Greensboro, North Carolina, has been awarded a maximum $7,935,500 modification (P00007) exercising the second one-year option period of a one-year base contract (SPE1C1-18-D-1054) with four one-year option periods for poly/wool gabardine cloth. This is a fixed-price with economic-price-adjustment contract. Location of performance is North Carolina, with a May 29, 2021, performance completion date. Using military service is Marine Corps. Type of appropriation is fiscal 2020 through 2021 defense working capital funds. The contracting activity is the Defense Logistics Agency Troop Support, Philadelphia, Pennsylvania. AIR FORCE Vanderbilt University, Nashville, Tennessee, has been awarded an $8,800,167 cost-plus-fixed-fee contract for model-based intent-driven adaptive software (MIDAS). The objective of this contract is to develop a new approach to evolutionary software development and deployment that extends the results of model-based software engineering and provides an integrated, end-to-end framework for building software that is focused on growth and adaptation. The scope of this effort includes research, design, development, demonstration, testing, integration and delivery of the MIDAS software system that enables rapid adaptation of software to changes in requirements, platforms and computational resources at a scale and speed appropriate for the complex software ecosystem upon which the U.S. government, military and economy depend. Work will be performed in Nashville, Tennessee, and is expected to be completed by May 7, 2024. This award is the result of a competitive acquisition and 20 offers were received. Air Force Research Laboratory, Rome, New York, is the contracting activity (FA8750-20-C-0215). *Small business https://www.defense.gov/Newsroom/Contracts/Contract/Article/2197963/source/GovDelivery/

  • Army Wants Industry Input For Reliable Exoskeleton (Not Iron Man, Yet!)

    2 septembre 2020 | International, Terrestre, Autre défense

    Army Wants Industry Input For Reliable Exoskeleton (Not Iron Man, Yet!)

    By SYDNEY J. FREEDBERG JR. SOCOM couldn't build a bulletproof Iron Man. But Army experiments with more modest lower-body exoskeletons have shown real-world potential to help overburdened foot troops. WASHINGTON: Army Futures Command is drafting a formal requirement for a military exoskeleton and will seek feedback from manufacturers at a November industry day. The Army's top priority, officials told me: rapidly prototyping a system that helps the wearer “move faster, travel further, and carry heavier loads” – without breaking down in the heat of battle. “Reliability is a huge issue that needs to be resolved,” said Ted Maciuba, deputy director of robotic requirements for Futures Command. Now, don't expect a full-body bulletproof suit that can fly and access huge databases out of science fiction. “We are not going after the Starship Troopers/Iron Man system right off the bat,” said Rich Cofer, a former soldier who's now the Army's lead “capabilities developer” on the exoskeleton project. “We're not going to jump right in and expect Tony Stark... Expectation management is key.” (That's a stark contrast to Special Operations Command's highly publicized TALOS program, which explicitly compared itself to Iron Man but produced nothing of the kind). So instead of Iron Man, think Iron Leg. In a “soldier touchpoint” last December at Fort Drum, NY, Army soldiers from more than two dozen Military Occupational Specialties — ranging from infantry to supply — tried out various types of “lower-body exoskeletons,” including the Lockheed Martin ONYX that our own Paul McLeary tries out in this video. In essence, these are motorized knee braces and other wearable reinforcements for the legs that lighten the load on overburdened soldiers as they march for hours with heavy packs, manhandle artillery shells and such. The goal isn't to give the wearer superpowers, but to reduce fatigue and risk of injury. During the Fort Drum trials, “there were significant increases in the effectiveness of soldiers,” Maciuba told me. “The soldiers were able to do more with the exoskeleton than they could without.” That said, “we learned [that] there needs to be enough reliability engineered into our systems so that there is a very high probability they will not fail in use,” Maciuba continued. “It's one thing to be wearing a boot whose sole flips off. You can always take some 100-mile-an-hour tape and tape that back on your foot. It's another thing to be wearing an exoskeleton” that requires specialized training and tools to fix. So reliability will be a high priority when the Army speaks to potential vendors in mid-November. By that point, Maciuba & co. expect to have a draft Abbreviated Capabilities Development Document for industry to review and offer comment on. (Army Futures Command officially gave them the go-ahead to write the ACDD on Aug. 14th; the exoskeleton project falls under the command's Soldier Lethality team, with input from PEO-Soldier acquisition officials, Natick Soldier Systems Center researchers, and capability managers for infantry, armored, and Stryker units). While unclassified, the document will be considered sensitive and only released to qualified contractors. While the ACDD is formally considered a requirements document, Maciuba told me, it's not going to set rigid technical specs as would a traditional Army requirement. The technology is advancing way too fast to get that detailed at this early stage. Instead, he said, it will outline “desirable characteristics” but leave industry plenty of leeway to innovate on specific ways to achieve them – and the Army is open to revising those desires based on what industry says is actually achievable. “We want industry to grade our work,” Maciuba said. The industry day – which will be held online unless there's some miraculous breakthrough with COVID-19 – will include both a general session open to all contractors and one-on-one meetings with specific contractors so they can discuss their technology without competitors listening. Afterwards, Maciuba, Cofer, & co. will compile the feedback from all the companies, revise the ACDD, and send it to Army leaders for approval. The final Abbreviated Capabilities Development Document should be out by the end of 2021, Cofer estimated. The next step? Use a streamlined acquisition process known as Section 804, intended to field a working prototype within five years – that is, Maciuba cautioned, if the Army can find the funding. https://breakingdefense.com/2020/09/army-wants-industry-input-for-reliable-exoskeleton-not-iron-man-yet/

  • Lockheed Martin lifts 2024 sales target on fighter jet, missile demand

    23 juillet 2024 | International, Aérospatial

    Lockheed Martin lifts 2024 sales target on fighter jet, missile demand

Toutes les nouvelles