9 octobre 2020 | International, C4ISR, Sécurité

Space Development Agency wants someone to launch its first 28 satellites

WASHINGTON — Now that the Space Development Agency has selected four contractors to build its first 28 satellites, the organization is looking for a launch provider to ferry them into orbit.

According to a solicitation posted Oct. 6, the agency plans to select one company to provide launch services for all 28 satellites, with the first launch taking place in September 2022.

Those 28 satellites will comprise tranche 0 of SDA's National Defense Space Architecture, a new proliferated constellation providing a whole host of services primarily from low Earth orbit. Among other things, the NDSA is anticipated to provide beyond-line-of-site targeting, hypersonic missile warning and tracking, and a space-based mesh network that will connect all of the services as part of the Pentagon's new Combined Joint All-Domain Command and Control (CJADC2) approach.

The constellation will ultimately include hundreds of satellites, but SDA isn't putting them all up at once. Rather, the agency has adopted a spiral development approach, where the most mature and ready technology is added to the constellation in two year tranches.

This launch solicitation covers the first tranche, otherwise known as tranche 0. Slated to go into orbit in fall 2022, tranche 0 is what SDA calls its “war fighter immersion tranche.”

“Its goal is to provide the data in a format that the war fighters are used to seeing on tactical timelines that they can be expected to see once we actually become operational,” SDA Director Derek Tournear told C4ISRNET. “The whole purpose of tranche 0 is to allow the war fighters to start to train and develop tactics, techniques and procedures so that they can create operational plans for a battle where they would actually incorporate these data.”

With just 28 satellites, tranche 0 will not provide global, persistent coverage. Instead, it will provide periodic, regional capabilities. Tranche 0 will feature the inaugural satellites in the transport and tracking layers. The 20 transport layer satellites will form the base of a space-based mesh network, passing data from satellites to weapon systems along a high-speed, on-orbit corridor. Tournear has previously stated that the transport layer will serve as the space component of CJADC2, the Pentagon's effort to connect sensors to shooters across domains and services.

The inaugural tracking layer will be made up of eight satellites. The tracking layer will be used to detect and track hypersonic threats, working with the transport layer to pass tracking data and custody from satellite to satellite—collaborating to keep an eye on globe-traversing missiles that can evade current missile warning capabilities.

SDA has selected Lockheed Martin and York Space Systems to each build 10 of the transport layer satellites, while SpaceX and L3 Harris will split the eight tracking layer satellites.

Because the SDA has given vendors flexibility in the designs of their satellites, there is some variety to the weight of the space vehicles being launched into orbit. While all 20 transport layer satellites will weigh approximately 200 kilograms, give or take 20 kilograms, there is a significant difference in the size of the eight tracking layer satellites. One vendor—either SpaceX or L3 Harris—will be contributing four tracking layer space vehicles weighing approximately 1,068 kg each. The other vendor's space vehicles will be significantly lighter at just 249 kg.

In total, SDA is looking to put as much as 10,164 kg of hardware into orbit. The agency wants all 28 satellites delivered to two circular, 950 km near-polar orbits, with the tranche divided evenly into two planes of 14 satellites. The launch provider has until March 31, 2023, to put all payloads on orbit and has discretion as to how many launches it will use to do that. The goal is to have as many satellites up as close to September 2022 as possible.

Proposals are due by Nov. 5 at 4 p.m. EST.

https://www.c4isrnet.com/battlefield-tech/space/2020/10/08/space-development-agency-wants-someone-to-launch-their-first-28-satellites/

Sur le même sujet

  • BAE Systems, QinetiQ tasked with A2 Bradley hybrid electric drive retrofit

    23 juillet 2020 | International, Terrestre

    BAE Systems, QinetiQ tasked with A2 Bradley hybrid electric drive retrofit

    by Ashley Roque The US Army has awarded BAE Systems with a USD32.3 million contract to refit two A2 Bradley infantry fighting vehicles with hybrid electric drives (HEDs) in a bid to produce additional power for future weapons. In mid-July, the service announced the terms of the prototyping contract and said it is expecting to receive the retrofitted vehicles in two years. “By rapidly prototyping HEDs on a small scale, we can jump-start advanced electrification and hybridisation of army platforms, and encourage our industry partners to invest in these products to meet army standards,” said Lieutenant General Neil Thurgood, the director of hypersonics, directed energy, space and rapid acquisition, who is also overseeing the Rapid Capabilities and Critical Technologies Office (RCCTO). The service is eyeing the HEDs as a way to reduce fuel consumption, and increase reliability and performance without adding additional size, weight, and power (SWaP) demands. This HED effort will consist of an upgraded engine, a transmission replaced by an electric drive motor, and the addition of lithium ion batteries. As a result, the engine power can produce electricity for greater mobility and can also be used to operate additional onboard equipment. One potential power use could include directed energy weapons, such as high-powered lasers, that pose numerous SWaP challenges. “HEDs add a high-voltage generator that turns engine power into electricity for greater mobility and for operating additional equipment, both of which increase combat effectiveness,” Mike Foster, director of the RCCTO's rapid acquisition, said in the announcement. https://www.janes.com/defence-news/news-detail/bae-systems-qinetiq-tasked-with-a2-bradley-hybrid-electric-drive-retrofit

  • Russian Company Plans New Generation Of Missiles

    16 février 2021 | International, Aérospatial

    Russian Company Plans New Generation Of Missiles

    Piotr Butowski Moscow-based GosMKB Vympel, which designs air-to-air missiles, is funding its own research on what appears to be the continuation of a short-range missile project that had been halted decades ago. In late January, the company summarized its research and development work conducted in 2020. The most interesting project appears to be its research on “shaping the appearance of a future product 300M.” This work, financed by Vympel's long-term development fund, is to lay the scientific and technical groundwork for the Russian military and increase the company's export prospects, the company says. Undoubtedly, the current izdeliye 300M (“izdeliye” means “product” in Russian) is a further development of the K-30, or K-MD, short-range missile project, launched by Vympel in 1986 as part of its work on arming the fifth-generation MiG multirole fighter, which was halted in 1994 due to a lack of funding. Later, Vympel offered the 300 project while working on how to arm the Sukhoi PAK FA (Su-57) fighter. In 2006, the company said the 300 missile could have been ready in 2013, if enough funding had been available. Gennady Sokolovsky, the head of Vympel at the time, said that the 300 missile would “significantly exceed foreign missiles of a similar type.” The 300 was to be fitted with a new Merlushka, or “lambskin,” imaging infrared seeker developed by the AOMZ tactical missile company, enabling target identification and a lock-on range twice as great as its predecessors. The dual-pulse, solid-propellant motor was to provide relatively large specific impulse (about 100s), a measure of the engine's efficiency. The 300 missile was to have jet-vane gas controls instead of spoilers placed in the engine nozzle, as is the case with the current R-74 missiles. The efficiency of the variable gas nozzle is greater than that of spoilers; moreover, the presence of spoilers in the nozzle causes a loss of thrust. Judging from the course of events, plans to resume the 300 project were not approved at the time, and the simpler R-74M2, otherwise known as izdeliye 760, was chosen as the primary close air-combat missile for the Su-57. How the current 300M project changed compared with the previous version is not known, but most likely the modifications did not alter the overall configuration. If the changes were really significant, the project would have received a new index, not just an additional M letter. Certainly, the element base in the seeker and control system is new; the engine also may be improved. Of course, the 300M missile remains at the conceptual research stage, which usually does not yet involve the actual construction of a missile. According to Vympel's announcement, another short-range missile performed “about 30 firing tests” in 2020 as part of state evaluations, the final stage of tests before the missile is approved for full-scale series production. The announcement probably refers to the R-74M2, izdeliye 760, missile, which started firing tests on April 8, 2016, and in July 2019 was submitted for state evaluations on the Su-57. The Vympel R-74M2 is a further development of the in-service R-74M izdeliye 750 with the cross-section reduced so it can be fitted inside the internal quick-launch weapons bays of the Su-57. The remaining information provided by Vympel about its 2020 research and development work is very general. The types of weapons are not named, and only the categories are defined. In the long-range air-to-air missile class, one of the missiles “completed preliminary tests to the extent sufficient for the construction documentation to be awarded the letter ‘O.'” In the parlance of the Russian defense industry, the letter “O” denotes permission to make an initial serial batch of missiles. Vympel could be referring to a new-generation heavy missile, the izdeliye 810, intended for internal carriage in the Su-57 fighter. The 810 missile, never presented to the public, began undergoing firing tests on July 6, 2017; its maximum range is estimated at 300 km (186 mi.). https://aviationweek.com/defense-space/missile-defense-weapons/russian-company-plans-new-generation-missiles

  • Nigeria expects first batch of Leonardo M-346 fighter jets this year

    21 avril 2024 | International, Aérospatial

    Nigeria expects first batch of Leonardo M-346 fighter jets this year

    This year kicks off a delivery schedule for the light fighter plane that entails four batches of six aircraft each for the African nation.

Toutes les nouvelles