18 avril 2024 | International, Sécurité

Russian APT Deploys New 'Kapeka' Backdoor in Eastern European Attacks

A new stealthy backdoor malware called Kapeka, likely created by Russia's APT group Sandworm, has been targeting Eastern Europe.

https://thehackernews.com/2024/04/russian-apt-deploys-new-kapeka-backdoor.html

Sur le même sujet

  • Fluor nets $1.07B for work on advanced naval nuclear propulsion

    2 octobre 2019 | International, Naval

    Fluor nets $1.07B for work on advanced naval nuclear propulsion

    ByEd Adamczyk Oct. 1 (UPI) -- Fluor Marine Propulsion LLC received a $1.07 billion contract to continue its work at the Naval Nuclear Laboratory, the Defense Department announced. The contract covers work on naval nuclear propulsion technology, including the research, design, construction, testing, operation, maintenance and ultimate disposition to support safe and reliable operation of the country's submarine and aircraft carrier fleets. The Laboratory is a joint U.S. Navy-U.S. Department of Energy program and is operated by Fluor, with four facilities in three states. The lab is dedicated solely to support the United States Naval Nuclear Propulsion Program. The lab employs over 7,500 engineers, scientists, technicians and support personnel, all of whom will continue in their current roles and pay levels, with no reduction in force, the Pentagon said in the contract announcement. The contract calls for management and operation of facilities in Pittsburgh; Schenectady, N.Y., and Idaho Falls, Idaho. https://www.upi.com/Defense-News/2019/10/01/Fluor-nets-107B-for-work-on-advanced-naval-nuclear-propulsion

  • China says Boeing welcome to deepen development in its market | Reuters

    9 décembre 2023 | International, Aérospatial

    China says Boeing welcome to deepen development in its market | Reuters

    China's aviation regulator's deputy head on Friday told a Boeing executive in Beijing the airplane maker was welcome to deepen its development in the Chinese market.

  • The US Navy’s top acquisition priority stumbles out of the gate

    7 août 2018 | International, Naval

    The US Navy’s top acquisition priority stumbles out of the gate

    By: David B. Larter The U.S. Navy's $122.3 billion Columbia-class ballistic missile submarine program is off to an inauspicious start after faulty welding was discovered in several missile tubes destined for both the Columbia and Virginia-class programs, as well as the United Kingdom's follow-on SSBN program. In all, 12 missile tubes manufactured by BWXT, Inc., are being scrutinized for substandard welds. Seven of the 12 had been delivered to prime contractor General Dynamics Electric Boatand were in various stages of outfitting, and five were still under construction. The Navy and Electric Boat have launched an investigation, according to a statement from Naval Sea Systems Command spokesman Bill Couch. “All BWXT welding requiring volumetric inspection has been halted until the investigation is complete,” Couch said. The bad welds came to light after discrepancies were discovered with the equipment BWXT used to test the welds before shipping them to GDEB, according to a source familiar with the issue. The discovery of a significant quality control issue at the very outset of fabrication of Columbia injects uncertainty in a program that already has little room for delays. The issue is made even more troubling because it arises from a vendor with an excellent reputation, and raises questions about whether the Navy can deliver Columbia on time, something the Navy says is vital to ensuring continuous nuclear deterrent patrols as the Ohio class reaches the end of its service life. Full Article: https://www.defensenews.com/breaking-news/2018/08/06/the-us-navys-top-acquisition-priority-stumbles-out-of-the-gate-after-bad-welds-discovered-in-missile-tubes/

Toutes les nouvelles