20 janvier 2022 | International, C4ISR

Digital Engineering is Imperative for Aerospace & Defense

Aviation Week spoke with PwC leaders on the acceleration of digital engineering. Read this paper hear their perspectives on the subject.

https://aviationweek.com/aerospace/ask-expert-digital-engineering-imperative-aerospace-defense

Sur le même sujet

  • Production of one of the F-35′s most anticipated bombs has been on hold for almost a year

    15 juin 2020 | International, Aérospatial

    Production of one of the F-35′s most anticipated bombs has been on hold for almost a year

    By: Valerie Insinna WASHINGTON — Deliveries of a new precision-guided bomb under development by Raytheon for the F-35 and other fighter jets have been at a standstill for about a year as the company struggles to correct a technical problem involving a key component. A fix for the issue, which brought production of the Small Diameter Bomb II to a halt in July 2019, could be approved by the government as soon as July, said Air Force spokesman Capt. Jake Bailey in response to questions by Defense News. However, a June report by the Government Accountability Office pointed out that continued technical issues have already caused a delay in fielding the munition, with Raytheon forced to redesign a key component and retrofit all 598 bombs already delivered to the Air Force and Navy. The Small Diameter Bomb II — also known as the GBU-53 StormBreaker — was designed with a tri-mode seeker that includes a millimeter wave radar, imaging infrared and semi-active laser that allow the weapon to engage targets in all weather conditions and environments where visibility is obscured by dust and debris. The Air Force and Navy plan to integrate SDB II with a range of fighter aircraft including the F-15, F/A-18 Super Hornet and F-35 joint strike fighter, but the munition has been mired in development for more than a decade. This latest stoppage in production was prompted by internal audits by Raytheon, which found that the clips used to hold the bomb's fins in place “suffered vibration fatigue over long flight hours,” Bailey said. The clips serve “as the backup fin storage device” used to keep the fins in place in case other components fail, noted Bailey, who added that there have been no incidents during tests involving the SDB II fins inadvertently deploying. However, the GAO wrote that the premature deployment of the fins, which help guide the bomb in flight, could damage the weapon as well as cause a safety hazard for the aircraft carrying it. “While this problem could affect all aircraft carrying the bomb, officials said the greatest impact is to the F-35, because the bomb is carried in the aircraft's internal weapons bay and could cause serious damage if the fins deploy while the bomb is in the bay,” the GAO stated. Raytheon declined to comment on this story, directing questions to the Air Force. Raytheon plans on mitigating the issue with a newly designed clip that reduces the vibration of the fins, and will completely pay for developing the fix and retrofitting it on the bombs that have already been delivered, the GAO said. The Air Force confirmed that testing of the new device has already been completed and is going through final reviews. But while Raytheon and the Air Force had hoped to restart production in April, travel restrictions caused by the ongoing global COVID-19 pandemic contributed to further delays. The government now hopes to approve the fix in July, after which production will restart and the retrofit process for existing bombs will begin. “The fin clip failure is the sole reason production was partially halted; once final government approval is obtained, ‘all up round' production can resume,” Bailey said, using a phrase that describes a fully assembled weapon. The Air Force estimates that retrofits will be completed by August, as Raytheon's supplier has already begun manufacturing the replacement component, which are easily installed on the outside of the weapon. “Until production resumes, the total Lot 3 deliveries remain at 204 of the 312 assets on contract,” Bailey said. All this puts initial operational capability at least a year later than the service's original timeline, which predicted IOC would occur in September 2019. The Air Force declined to name a current estimate for when IOC would be achieved, but said it would happen after a separate milestone known as the “initial fielding decision,” which involves the approval of the head of Air Combat Command and is set for the third quarter of 2020. The issue with SDB II's fins is just one of several technical problems with which Raytheon is grappling. The program completed operational tests in 2019, but hardware and software changes are needed after 11 failures were reported. Two hardware fixes have already been put in place, and eight failures were related to software problems that will be addressed in future updates, the GAO said. The sole outstanding issue involves an anomaly with SDB II's guidance system. Fixing it could require Raytheon to redesign the component and conduct retrofits on all bombs already delivered, according to GAO. A review board of the problem is in the “final stages of analysis,” Bailey said. The Air Force and Raytheon plan to establish whether a replacement component is necessary no later than June 30. Although the weapon has not even been officially fielded, some components are already becoming obsolete. A Raytheon subcontractor that makes circuit cards used in the guidance system is expected to stop producing those components years sooner than anticipated. As a result, that the Defense Department may have to order all circuit cards needed for the program of record before December, according to the GAO. That timeline has now been extended to January 2022, “which provides ample time for program office action before the new deadline,” Bailey said. Despite the bomb's ongoing problems, Raytheon continues to rake in contracts for the program. In February, the Defense Department awarded a $15 million increase to a previous SDB II contract for additional technical support. In September, the company received a $200 million contract for lifecycle support during the bomb's engineering and manufacturing development phase. According to a Raytheon news release, the Navy recently completed the first guided release of SDB II from a F/A-18E/F Super Hornet. https://www.defensenews.com/air/2020/06/12/production-of-one-of-the-f-35s-most-anticipated-bombs-has-been-on-hold-for-almost-a-year

  • Boeing, CAE Agree to Enhance P-8 Training Solutions for Canada, Germany, and Norway

    4 avril 2023 | International, Aérospatial

    Boeing, CAE Agree to Enhance P-8 Training Solutions for Canada, Germany, and Norway

    OTTAWA, April 4, 2023 – Boeing [NYSE: BA] and CAE [NYSE: CAE; TSX: CAE] signed teaming agreements to expand multi-mission platform collaboration in Canada, Germany and Norway. These agreements utilize the complementary capabilities of each company to provide superior management, technical and cost-effective training solutions for the P-8A Poseidon program. “These agreements aim to advance mission readiness for defense customers operating Boeing P-8 aircraft,” said Torbjorn Sjogren, Boeing vice president and general manager, Government Services. “Working together, Boeing and CAE can deliver outcome-based pilot and aircrew training, maintenance ground school, in-service support, and instructor training at the point of need.” As a member of Team Poseidon in Boeing’s Canadian Multi-Mission Aircraft (CMMA) offering, CAE is part of a Canadian P-8 industrial footprint that builds on 81 Canadian partners on the platform. “Mission success depends on advanced preparation and rapid response,” said Daniel Gelston, CAE Defense & Security president. “As a premier provider in flight training and simulation, we leverage collaboration to create an agile network of proven training, simulation and in-service support solutions to deliver critical readiness for defense forces worldwide.” This collaboration amplifies a long-standing relationship spanning commercial and defence portfolios across the globe. For more than a decade CAE has delivered operational flight trainers on the Boeing P-8A platform supporting the U.S. Navy, Royal New Zealand Air Force and United Kingdom Royal Air Force.

  • Eurofighter submits updated proposal to HX programme

    5 février 2020 | International, Aérospatial

    Eurofighter submits updated proposal to HX programme

    January 31, 2020 - Eurofighter has offered Finland the chance to join Europe's largest combat aircraft programme in an updated proposal to the HX fighter acquisition programme. The proposal has been submitted by the UK Government with the support of the Governments of Germany, Italy and Spain, the nations which are represented in the Eurofighter industry consortium. It offers Finland sovereign control of its defence capability and security of supply as well as a combat proven, swing-role aircraft which will form the backbone of European defence for decades to come. The detailed proposal updates on the original offer made to the HX fighter acquisition programme to replace the Finnish Air Force's F-18 Hornet aircraft. John Rossall, Campaign Director at BAE Systems which is working alongside the UK Government on the offer to Finland, said: We are delighted to present our updated proposal to Finland on behalf of the Eurofighter consortium. Our proposal is an invitation to Finland to join leading nations in Europe with a shared defence objective. By choosing Eurofighter, the Finnish Air Force would not only be acquiring the most advanced, multi-role aircraft on the market, it would be choosing everything Finland needs to operate, maintain and control its own aircraft in peacetime and in times of crisis. In January, Eurofighter took part in the HX Challenge Flight Evaluation Trials, led by the Finnish Defence Forces in Tampere. The trials saw two Royal Air Force jets perform over a five-day period to demonstrate many of the capabilities which form the offering of the Eurofighter consortium, which teams BAE Systems alongside leading European defence contractors Airbus and Leonardo. Ahead of the trials, representatives of the Governments of the UK, Germany, Italy and Spain confirmed their commitment to a capability roadmap which will keep Eurofighter in the frontline of European defence for decades to come. View source version on Eurofighter: https://www.eurofighter.com/news-and-events/2020/01/eurofighter-submits-updated-proposal-to-hx-programme

Toutes les nouvelles