15 février 2023 | International, Autre défense

NATO summit defense spending pledges may exceed 2% target, Austin says

Members nations hold their next summit in the Lithuanian capital Vilnius in July.

https://www.defensenews.com/pentagon/2023/02/15/nato-summit-defense-spending-pledges-may-exceed-2-target-austin-says/

Sur le même sujet

  • Army's Decision On Huge Helicopter Engine Program Will Impact GE, Honeywell, United Technologies

    3 janvier 2019 | International, Aérospatial

    Army's Decision On Huge Helicopter Engine Program Will Impact GE, Honeywell, United Technologies

    Loren Thompson Sometime in the very near future, probably this month, the U.S. Army will announce the winner of a competition to develop a new engine for most of the service's helicopters. Called the Improved Turbine Engine Program (ITEP), it is a multibillion-dollar effort that has often been described as the Army's top aviation modernization priority. It isn't hard to see why. The weight of Army light and medium helicopters has been growing by 70-100 pounds per year since they debuted in the last century as new equipment, munitions and armor were added. As a result, both the Black Hawk utility helicopter and the Apache attack helicopter are under-powered when operating in “high-hot” conditions, meaning above 6,000 feet in temperatures of 95 degrees or greater. Such conditions are common in places like the Persian Gulf, and pose a challenge to conducting missions successfully. In 2006, the Army launched an effort to develop an engine that could provide 50% more power than the existing General Electric T700 engine (3,000 versus 2,000 shaft horsepower), while reducing fuel consumption by 25% and extending the life of the engine 20%. That in itself was a tall order, but the new engine also had to fit into thousands of fielded helicopters with minimal modifications, and it couldn't weigh more than 500 pounds (the current engine weighs 456 pounds). The Army also wanted each engine to cost much less than the T700–not just in the cost of manufacturing the new engines, but in the cost of maintaining them across a multi-decade service life. Given these very demanding requirements, and a dearth of money for modernization during the Obama years, it isn't surprising that a dozen years passed before the Army felt it was in a position to pick a design that met all the service's needs. But now it is. The choice is between a successor to the T700 built by General Electric Aviation, and a competing design offered by a joint venture of Honeywell and Pratt & Whitney (a unit of United Technologies, and contributor to my think tank). The decision has probably already been made, and simply awaits formal announcement later this month. Full article: https://www.forbes.com/sites/lorenthompson/2019/01/02/armys-decision-on-huge-helicopter-engine-program-will-impact-ge-honeywell-united-technologies

  • Lockheed to develop 5G testbed for Marine Corps

    18 février 2022 | International, Naval, C4ISR

    Lockheed to develop 5G testbed for Marine Corps

    The testbed will help identify areas of compatibility between 5G networks and defense platforms, the company said Feb. 16.

  • Contract Awards by US Department of Defense - November 29, 2019

    2 décembre 2019 | International, Aérospatial, Naval, Terrestre, C4ISR, Sécurité

    Contract Awards by US Department of Defense - November 29, 2019

    DEFENSE LOGISTICS AGENCY Bell Boeing Joint Project Office, California, Maryland, has been awarded a maximum $218,749,892 modification (P00006) exercising the first one-year option period of a one-year base contract (SPRPA1-20-F-CD01) with four one-year option periods for performance based logistics and engineering support for the V-22 platform. This is a firm-fixed-price requirements contract. Locations of performance are Texas and Pennsylvania, with a Nov. 30, 2020, performance completion date. Using customers are Navy, Air Force, Marine Corps and Foreign Military Sales to Japan. Type of appropriation is fiscal 2020 through 2021 Air Force, U.S. Special Operations Command, Navy and FMS appropriated funds. The contracting activity is the Defense Logistics Agency Aviation, Philadelphia, Pennsylvania. NAVY Raytheon Integrated Defense Systems, San Diego, California, is awarded a $74,726,993 cost-plus-fixed-fee, indefinite-delivery/indefinite-quantity contract for design agent engineering services for networks and network user systems on operational landing platform/dock (LPD)-17 class amphibious transport dock ships. Work will be performed in San Diego, California (80%); Norfolk, Virginia (15%); Mayport, Florida (5%) and is expected to be complete by December 2024. Fiscal 2020 operations and maintenance, (Navy) funding in the amount of $689,680 will be obligated at time of award and will expire at the end of the current fiscal year. This contract was not competitively procured in accordance with 10 U.S. Code 2304 (c) (1), only one responsible source and no other supplies or services will satisfy agency requirements, as implemented by Part 6.302-1 of the Federal Acquisition Regulation. This contract was issued on a sole-source basis to Raytheon Integrated Defense Services. This requirement is for design agent engineering and technical services for the overall management, development, testing, troubleshooting, repair, configuration, maintenance and fleet sustainment of fielded networks and associated network user systems/clients on operational LPD 17-class amphibious transport dock ships. These services are in support of Naval Surface Warfare Center, Philadelphia Division, Code 52, which is responsible for the lifecycle in-service engineering agent support of mission critical interior communications data networks. The Naval Surface Warfare Center, Philadelphia Division, Philadelphia, Pennsylvania, is the contracting activity (N64498-20-D-0001). W.R. Systems, Fairfax, Virginia, is awarded a modification to a previously awarded (N65236-19-D-8001) indefinite-delivery/indefinite-quantity, cost-plus-fixed-fee, with provisions for firm-fixed-price task orders, performance based contract. This single award contract (SAC) is currently in its first year with a Feb. 15, 2020, contract expiration date. This modification increases the basic contract estimated ceiling by $61,999,996, and changes the cumulative estimated value of the contract from $49,999,995, to $111,999,992. This SAC is for position, navigation and timing and geospatial information services support to naval ships and shore facilities. Work will be performed in Norfolk, Virginia, and is expected to be completed by February 2020. This SAC was previously procured competitively by full and open competition via the Naval Information Warfare Systems Command e-commerce central website and the Federal Business Opportunities website. This sole-source contract was not competitively procured in accordance with 10 U.S. Code 2304(c)(1) and only one responsible source (Federal Acquisition Regulation subpart 6.302-1). The Naval Information Warfare Center, Charleston, South Carolina, is the contracting activity. General Dynamics/Electric Boat, Groton, Connecticut (N66604-20-D-D001); Huntington Ingalls/Newport News Shipbuilding, Newport News, Virginia (N66604-20-D-D002); and Oceaneering International Inc., Chesapeake, Virginia (N66604-20-D-D003) are being awarded a $49,921,536 indefinite-delivery/indefinite-quantity (ID/IQ) multiple-award contract to fabricate submarine safety/Level 1 (SUBSAFE/L1) hardware, and provide technical and engineering services. For these base ID/IQ five-year contracts, funding will not be obligated at time of award; the $1,000 minimum guarantee will be executed on each awardee's initial task order. Work will be performed at the contractors' locations and minimally at government locations, and is expected to be completed by November 2024. This multiple-award contract was competitively procured with three acceptable offers received via the Federal Business Opportunities website. This requirement is to provide SUBSAFE/L1 (or related) hardware, systems engineering, technical analyses, mechanical and electrical design, manufacturing, installation, test and evaluation, maintenance and repair services required to support existing and future fleet programs. In accordance with 10 U.S. Code 2304(c)(1), only a limited number of responsible sources and no other supplies or services will satisfy the needs of the agency. This tasking was limited to those activities qualified to perform SUBSAFE work per the Naval Sea Systems Command Notice 5000, fiscal 2019 Navy working capital funds. The Naval Undersea Warfare Center Division Newport, Newport, Rhode Island, is the contracting activity. Washington State Community College District #3, Bremerton, Washington, is awarded a not-to-exceed $18,000,000 five-year indefinite-delivery/indefinite-quantity contract for educational services in support of the apprenticeship, helper and after-hours program, which pays for tuition, lab fees, math fees, tutoring services and assessment fees in an effort to provide customers with quality, timely and cost efficient maintenance, modernization, and technical and logistics support by maintaining a highly trained and skilled workforce. These services are in support of Puget Sound Naval Shipyard and Intermediate Facility in Bremerton, Washington. This contract does not include options. Work will be performed in Bremerton, Washington, and is expected to be complete by December 2024. No funding will be obligated at the time of award. In accordance with Federal Acquisition Regulations Part 15, this was a competitive procurement with one offer received via the Federal Business Opportunities website. Operations and maintenance (Navy) funding will be obligated at the task order level prior to each semester. This is a commercial service contract that was competed in accordance with Federal Acquisition Regulation Part 15. Only one proposal by the incumbent was received. The Puget Sound Naval Shipyard, Bremerton, Washington, is the contracting activity (N4523A20D1300). ARMY General Dynamics Mission Systems, Taunton, Massachusetts, was awarded a $9,164,584 cost-plus-fixed-fee contract to procure contractor field service representative support services for the warfighter. One bid was solicited with one bid received. Work will be performed in Taunton, Massachusetts, with an estimated completion date of Nov. 30, 2020. Fiscal 2019 other procurement, Army funds in the amount of $6,363,737 were obligated at the time of the award. U.S. Army Contracting Command, Aberdeen Proving Ground, Maryland, is the contracting activity (W15P7T-20-F-0004). AIR FORCE Tunista Services LLC, Honolulu, Hawaii, has been awarded a $7,362,228 firm-fixed-priced contract modification (P00006) to previously awarded contract FA4855-18-C-0001 for continuation of operations, maintenance and support services at Melrose Air Force Range. The contract modification provides for the exercise of option year two procured under the basic contract. Work will be performed at Melrose, New Mexico, and work is expected to be completed by Nov. 30, 2020. The total cumulative face value of the contract is $22,676,639. Fiscal 2020 operations and maintenance funds in the amount of $7,362,228 are being obligated at the time of award. The 27th Special Operations Contracting Squadron, Cannon Air Force Base, New Mexico, is the contracting activity. https://www.defense.gov/Newsroom/Contracts/Contract/Article/2029052/source/GovDelivery/

Toutes les nouvelles